← Back
Two family converted from one family
137 CLIFTON PLACE
BROOKLYN · BIN 3055654
💬 Discuss this project
1899Year Built
2Stories
B3Building Class
R6BZoning
1,890 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family converted from one family · 1,875 sf lot · 1.01 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Roof2p · 1 filing · 20 docs
Bulkhead1p · 1 filing · 20 docs
Floor 314p · 2 filings · 20 docs
Floor 213p · 1 filing · 19 docs
Floor 114p · 2 filings · 20 docs
Cellar14p · 2 filings · 20 docs
Basement1p · 1 filing · 20 docs
Sub-Basement13p · 1 filing · 19 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GARDEN GATE BAPAZ CONSTRU103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/28/2023$3.6M—STUYVESANT BUILDINGS LLC → Private party$1,892/sf building
11/16/2020$1.1M—Private party → Private party$589/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MICHAEL SCADUTO ARCHITECT907/13/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GOLDEN GATE BAPAZ CONSTRUGeneral Contractor903/21/2026
BT'S PLUMBING AND HEATINGPlumbing107/08/2026
PLBG P & H INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MICHAEL SCADUTO ARCHITECT4833807/13/2023
Building Lifecycle
All (105)Filed (9)Permit Issued (5)Signed Off (2)Violation (2)Inspection (11)Objection (46)Special Inspection (30)
09/22/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/15/2023
Inspection — Fail-Final PL - Up to 9 Requested Floors
Fail
View inspection ↗
08/01/2023
Signed off — Alteration
INTERIOR GUT RENOVATION AND HORIZONTAL ENLARGEMENT OF EXISTING 2-FAMILY TOWNHOUSE. NO CHANGE TO USE, OR OCCUPANCY UNDER THIS APPLICATION. PL FILED UNDER JOB B00534411
B00534176-I1
07/13/2023
Filed — Alteration
Plumbing work in conjunction with gut renovation nd horizontal enlargement. New fixtures and piping throughout. Construction filed under job B00534176
B00534411-P3
07/10/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
07/10/2023
Special inspection requirement — HVAC-R and service water heating equipment
Michael Scaduto
07/10/2023
Special inspection requirement — HVAC-R and service water heating system controls
Michael Scaduto
07/10/2023
Special inspection requirement — Energy Code Compliance Inspections
Michael Scaduto
07/10/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Michael Scaduto
07/10/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michael Scaduto
05/24/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/24/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/23/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Michael Scaduto
05/23/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Michael Scaduto
05/23/2023
Special inspection requirement — Subgrade Inspections
Michael Scaduto
05/23/2023
Special inspection requirement — Fenestration areas
Michael Scaduto
05/23/2023
Special inspection requirement — Air barrier - visual inspection
Michael Scaduto
05/23/2023
Special inspection requirement — Maintenance information
Michael Scaduto
05/23/2023
Special inspection requirement — Permanent certificate
Michael Scaduto
05/23/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michael Scaduto
05/23/2023
Special inspection requirement — Concrete - Cast-In-Place
Michael Scaduto
05/23/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Michael Scaduto
05/23/2023
Special inspection requirement — Lighting in dwelling units
Michael Scaduto
05/23/2023
Special inspection requirement — Energy Code Compliance Inspections
Michael Scaduto
05/23/2023
Special inspection requirement — Insulation placement and R values
Michael Scaduto
05/23/2023
Special inspection requirement — Structural Wood Frame
Michael Scaduto
05/23/2023
Special inspection requirement — Fire-Resistance Rated Construction
Michael Scaduto
05/23/2023
Special inspection requirement — Final
Michael Scaduto
05/23/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Michael Scaduto
05/23/2023
Special inspection requirement — Fenestration air leakage
Michael Scaduto
05/23/2023
Special inspection requirement — Masonry
Michael Scaduto
05/19/2023
Filed — Alteration
INTERIOR GUT RENOVATION AND HORIZONTAL ENLARGEMENT OF EXISTING 2-FAMILY TOWNHOUSE. NO CHANGE TO USE, OR OCCUPANCY UNDER THIS APPLICATION. PL FILED UNDER JOB B00534411
B00534176-P3
05/17/2023
Special inspection requirement — Air barrier - visual inspection
Michael Scaduto
05/17/2023
Special inspection requirement — Insulation placement and R values
Michael Scaduto
05/17/2023
Special inspection requirement — Energy Code Compliance Inspections
Michael Scaduto
05/17/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Michael Scaduto
05/17/2023
Special inspection requirement — Permanent certificate
Michael Scaduto
05/17/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Michael Scaduto
05/15/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
05/11/2023
Signed off — Alteration
B00676742-I1
05/09/2023
Filed — Alteration
Plumbing work in conjunction with gut renovation nd horizontal enlargement. New fixtures and piping throughout. Construction filed under job B00534176
B00534411-P2
05/09/2023
Filed — Alteration
INTERIOR GUT RENOVATION AND HORIZONTAL ENLARGEMENT OF EXISTING 2-FAMILY TOWNHOUSE. NO CHANGE TO USE, OR OCCUPANCY UNDER THIS APPLICATION. PL FILED UNDER JOB B00534411
B00534176-P2
10/19/2022
Objection resolved — Addressed
10/19/2022
Objection resolved — Addressed
10/19/2022
Objection resolved — Addressed
10/19/2022
Objection resolved — Addressed
09/22/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/22/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/22/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/13/2022
Objection resolved — Addressed
09/13/2022
Objection resolved — Addressed
09/08/2022
Objection raised — Admin
09/08/2022
Objection raised — Admin
09/01/2022
Objection resolved — Addressed
09/01/2022
Objection resolved — Addressed
09/01/2022
Objection resolved — Addressed
09/01/2022
Objection resolved — Addressed
08/26/2022
Objection raised — Other
08/26/2022
Objection raised — Fire_Protection
08/26/2022
Objection raised — Scope
Latest 60 of 105 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offPLBG P & H INC08/25/2022
DOB NOWConstruction FenceSigned-offGOLDEN GATE BAPAZ CONSTRU03/08/2022
DOB NOWStructuralSigned-offGOLDEN GATE BAPAZ CONSTRU01/26/2022
DOB NOWStructuralSigned-offGOLDEN GATE BAPAZ CONSTRU01/24/2022
DOB NOWPlumbingPermit IssuedBT'S PLUMBING AND HEATING07/01/2021
1 project · most recent 07/13/2023
Gas Water/Sanitary
FiledStatusContractorScope
07/13/2023Permit IssuedKISHAN PLBG & HEATING INCGas, Water/Sanitary
1 project · most recent 04/17/2023
General Wiring
FiledStatusContractorScope
04/17/2023CompleteACCURATE ELEC'L CORP.General Wiring
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
09/22/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/15/2023Fail-Final PL - Up to 9 Requested FloorsFailView ↗
07/10/2023Pass-Final General Construction Non-Directive 14PassView ↗
05/24/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/24/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/15/2023Fail-Final General Construction Non-Directive 14FailView ↗
09/22/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/22/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/22/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/22/2022Fail-Final PL - Up to 9 Requested FloorsFailView ↗
07/15/2022No Access-Final PL - Up to 9 Requested FloorsNo AccessView ↗
▾Special Inspection Requirements (DOB NOW) — 67
DateRequirementInspectorRole
07/10/2023Fire-Resistant Penetrations and JointsMichael Scadutospecial
07/10/2023Energy Code Compliance InspectionsMichael Scadutoprogress
07/10/2023HVAC-R and service water heating system controlsMichael Scadutoenergy_progress
07/10/2023HVAC-R and service water heating equipmentMichael Scadutoenergy_progress
07/10/2023HVAC-R and service water piping design and insulationMichael Scadutoenergy_progress
05/23/2023Structural Stability – Alterations of existing buildingsMichael Scadutospecial
05/23/2023Fire-Resistance Rated ConstructionMichael Scadutoprogress
05/23/2023Structural Wood FrameMichael Scadutoprogress
05/23/2023FinalMichael Scadutoprogress
05/23/2023Energy Code Compliance InspectionsMichael Scadutoprogress
05/23/2023Lighting in dwelling unitsMichael Scadutoenergy_progress
05/23/2023Insulation placement and R valuesMichael Scadutoenergy_progress
05/23/2023MasonryMichael Scadutospecial
05/23/2023Air barrier - visual inspectionMichael Scadutoenergy_progress
05/23/2023Fenestration areasMichael Scadutoenergy_progress
05/23/2023HVAC-R and service water piping design and insulationMichael Scadutoenergy_progress
05/23/2023Fenestration air leakageMichael Scadutoenergy_progress
05/23/2023Maintenance informationMichael Scadutoenergy_progress
05/23/2023Permanent certificateMichael Scadutoenergy_progress
05/23/2023Fenestration and door U-factor and product ratingsMichael Scadutoenergy_progress
05/23/2023Subgrade InspectionsMichael Scadutospecial
05/23/2023Subsurface Investigations (Borings/Test Pits)Michael Scadutospecial
05/23/2023Concrete - Cast-In-PlaceMichael Scadutospecial
05/23/2023Fire-Resistant Penetrations and JointsMichael Scadutospecial
05/17/2023Fenestration air leakageMichael Scadutoenergy_progress
Latest 25 of 67.
▾Documents — 81 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
09/01/2026B00534176-P3Request digital key ↗
09/01/2026B00534176-P2Request digital key ↗
08/31/2026B00676742-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Zoning, Tax Lot & Property Records8
▸DOB NOWZD1: DOB Zoning Diagram4
08/13/2026B00534176-P1Open ↗
08/13/2026B00534176-P2Open ↗
08/13/2026B00534176-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)4
08/13/2026B00534176-P2Open ↗
08/13/2026B00534176-P1Open ↗
08/13/2026B00534176-I1Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications33
▸DOB NOWProgress Inspector Seal & Signature13
08/28/2026B00534411-P3Open ↗
08/28/2026B00534411-P3Open ↗
08/26/2026B00534411-P2Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
08/28/2026B00534411-P3Open ↗
08/26/2026B00534411-P2Open ↗
08/25/2026B00534176-P3Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/31/2026B00676742-I1Open ↗
08/13/2026B00534176-P3Open ↗
08/13/2026B00534411-P1Open ↗
Showing 3 of 9 on file for this type
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/13/2026B00534176-P2Open ↗
08/13/2026B00534411-P1Open ↗
08/13/2026B00534411-P2Open ↗
Showing 3 of 8 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026B00534176-I1Open ↗
08/13/2026B00534411-I1Open ↗
▸Inspections & Test Reports6
▸DOB NOWSOIL REPORT4
08/13/2026B00534176-P3Open ↗
08/13/2026B00534176-P1Open ↗
08/13/2026B00534176-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTR4 Plot Diagram1
08/13/2026B00534176-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00534176-I1Open ↗
▸Cost, Insurance & Ownership2
▸DOB NOWCertification by Insurance Broker or Agency1
08/13/2026B00534176-I1Open ↗
▸DOB NOWCertificate of Insurance1
08/13/2026B00534176-I1Open ↗
▸Other Documents13
▸DOB NOWSite Survey: Initial4
08/13/2026B00534176-P2Open ↗
08/13/2026B00534176-P3Open ↗
08/13/2026B00534176-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026B00534176-P2Open ↗
08/13/2026B00534176-P1Open ↗
08/13/2026B00534176-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlot Diagram4
08/13/2026B00534176-P3Open ↗
08/13/2026B00534176-I1Open ↗
08/13/2026B00534176-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWAdditional Insured Authorizations1
08/13/2026B00534176-I1Open ↗