Office only, 7-19 stories
137 EAST 25 STREET
MANHATTAN · Gramercy · BIN 1018106
💬 Discuss this project
1910Year Built
10Stories
O3Building Class
C6-3AZoning
71,043 sfGross Floor Area
17Units
LL97 Covered3 Open Violations ▸FISP: SAFEFDNY Report ↗
Office only, 7-19 stories · Owner of record: 137 AND 138 REALTY,LLC · 6,526 sf lot · 10.89 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 3 docs
Floor 106p · 2 filings · 7 docs
Floor 96p · 2 filings · 7 docs
Floor 87p · 2 filings · 7 docs
Floor 7Under Construction9p · 1 filing · 5 docs
Floor 618p · 1 filing · 20 docs
Floor 52p · 1 filing · 8 docs
Floor 4
Floor 35p · 2 filings · 7 docs
Floor 2
Floor 1
Sub-Basement1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
137 138 REALTY11109/13/2026
PARSONS CONSTRUCTION1607/08/2026
T-MOBILE303/22/2026
137 AND 138 REALTY LLC RE403/22/2026
DIME SAVINGS BANK OF NY203/22/2026
REPUBLIC INVESTMENT COMPANY1803/22/2026
REPUPLIC INCESTMENT CO103/22/2026
TRSBBLIT INVESTMENT CO 1103/22/2026
BENITA HOLDING503/21/2026
137 138 REALTY LLC C O REPUBL603/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HANSEN ENGINEERING, PC405/06/2026
KEVIN LOUIS PELLON109/05/2025
RAHMANAN ARCHITECTURE + PLANNING PC208/28/2025
ELEVATED ENGINEERING, PLLC108/16/2022
HERO ARCHITECTS106/30/2022
INDUS ENGINEERING PC109/01/2021
GREEN DESIGN207/03/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
M W EXPEDITING403/21/2026
CONVERSANO ASSOCIATES, INC.803/21/2026
JANCO BUILDING CONSULTANTS203/21/2026
DEARCH ARCHITECTURE203/21/2026
BILTMORE GROUP203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PARSONS CONSTRUCTION INCGeneral Contractor1507/08/2026
VILLAGE P & H NY INCFire Protection307/08/2026
GOTHAM COMMUNICATIONS LLCGeneral Contractor303/21/2026
ALLSTATE SPRINKLER LLCFire Protection106/28/2026
RAEL AUTOMATIC SPR.CO INCFire Protection106/28/2026
ANSA DEVELOPMENT USA,CORPGeneral Contractor104/09/2026
ARIEL CONSULTANTS LLCGeneral Contractor104/09/2026
VALIANT DESIGN BUILD INCGeneral Contractor104/09/2026
CLEAN TECH MECHANICAL INCPlumbing107/08/2026
EYSEL, ROBERTElectrical103/21/2026
MT ENERGY INCPlumbing107/08/2026
VELASCO ORELLANA, ORLANDOElectrical103/21/2026
WILLIAM PETROULEASElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HANSEN ENGINEERING PC8174405/06/2026
INDUS ENGINEERING P.C.7044109/01/2021
Building Lifecycle
All (126)Filed (12)Permit Issued (18)Signed Off (1)Facade (FISP) (10)Violation (60)Inspection (5)Special Inspection (20)
09/22/2026
Special inspection requirement — Sprinkler Systems
Ryan Hansen
09/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ryan Hansen
05/13/2026
Permit issued — Sprinklers
M01395496-I1-EW-SP
05/06/2026
Filed — Alteration
FILING HEREWITH FOR THE MODIFICATION OF EXISTING SPRINKLER SYSTEM AT 7TH FLOOR
M01395496-I1
04/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ryan Hansen
04/30/2026
Special inspection requirement — Sprinkler Systems
Ryan Hansen
02/05/2026
Violation issued (FDNY_NOV, closed)
02/05/2026
Violation issued (FDNY_ORDER, closed)
02/05/2026
Violation issued (FDNY_ORDER, closed)
02/05/2026
Violation issued (FDNY_ORDER, closed)
02/05/2026
Violation issued (FDNY_ORDER, closed)
12/08/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/24/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/03/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/01/2025
Permit issued — Sprinklers
M01278183-S2-EW-SP
09/25/2025
Permit issued — Mechanical Systems
M01278183-S3-MS
09/24/2025
Filed — Alteration
FILING HERWITH FOR THE RENOVATION OF 6TH FLOOR OFFICE RESTROOMS AND PANTRY. THERE IS NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01278183-S2
09/24/2025
Permit issued — Plumbing
M01278183-S1-PL
09/22/2025
Filed — Alteration
FILING HERWITH FOR THE RENOVATION OF 6TH FLOOR OFFICE RESTROOMS AND PANTRY. THERE IS NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01278183-S3
09/22/2025
Filed — Alteration
FILING HERWITH FOR THE RENOVATION OF 6TH FLOOR OFFICE RESTROOMS AND PANTRY. THERE IS NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01278183-S1
09/19/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/19/2025
Special inspection requirement — Energy Code Compliance Inspections
Ryan Hansen
09/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ryan Hansen
09/19/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Ryan Hansen
09/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ryan Hansen
09/19/2025
Special inspection requirement — Energy Code Compliance Inspections
Ryan Hansen
09/19/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Ryan Hansen
09/12/2025
Special inspection requirement — Final
Ryan Hansen
09/12/2025
Special inspection requirement — Mechanical Systems
Ryan Hansen
09/11/2025
Permit issued — General Construction
M01278183-I1-GC
09/05/2025
Filed — Alteration
FILING HERWITH FOR THE RENOVATION OF 6TH FLOOR OFFICE RESTROOMS AND PANTRY. THERE IS NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01278183-I1
09/05/2025
Permit issued — Plumbing
M01272308-S1-PL
09/02/2025
Permit issued — General Construction
M01272308-I1-GC
08/28/2025
Filed — Alteration
Install new plumbing fixtures on the fifth floor office space. No change in use, egress, or occupancy.
M01272308-S1
08/27/2025
Filed — Alteration
Install new plumbing fixtures on the fifth floor office space. No change in use, egress, or occupancy.
M01272308-I1
08/27/2025
Special inspection requirement — Final
KEVIN PELLON
08/27/2025
Special inspection requirement — Fire-Resistance Rated Construction
KEVIN PELLON
08/27/2025
Special inspection requirement — Interior lighting power
KEVIN PELLON
08/27/2025
Special inspection requirement — Lighting controls
KEVIN PELLON
08/27/2025
Special inspection requirement — Energy Code Compliance Inspections
KEVIN PELLON
08/15/2025
Special inspection requirement — Interior lighting power
PAYAM RAHMANAN
08/15/2025
Special inspection requirement — Final
PAYAM RAHMANAN
07/21/2025
Violation issued (FDNY_NOV, closed)
04/23/2025
Violation issued (FDNY_ORDER, closed)
03/28/2025
Violation issued (FDNY_NOV, closed)
12/01/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/29/2024
Cycle 9 facade report signed — SAFE
03/30/2024
Violation issued (FDNY_NOV, closed)
03/13/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/21/2024
Cycle 9 facade report submitted
02/20/2024
Cycle 9 facade inspection completed
02/14/2024
Violation issued (FDNY_ORDER, closed)
01/24/2024
Permit issued — Sidewalk Shed
M00364211-I1-SH
01/24/2024
Permit issued — Supported Scaffold
M00364220-I1-SF
04/22/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/01/2023
Violation issued (FDNY_NOV, closed)
01/25/2023
Permit issued — Supported Scaffold
M00364220-I1-SF
01/09/2023
Permit issued — Sprinklers
M00565823-I1-EW-SP
12/01/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/29/2022
Signed off — Alteration
M00769419-I1
Latest 60 of 126 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedRAEL AUTOMATIC SPR.CO INC05/13/2026
DOB NOWSprinklersPermit IssuedALLSTATE SPRINKLER LLC10/01/2025
DOB NOWMechanical SystemsPermit IssuedVALIANT DESIGN BUILD INC09/25/2025
DOB NOWPlumbingSigned-offCLEAN TECH MECHANICAL INC09/24/2025
DOB NOWGeneral ConstructionPermit IssuedANSA DEVELOPMENT USA09/11/2025
DOB NOWPlumbingSigned-offMT ENERGY INC09/05/2025
DOB NOWGeneral ConstructionPermit IssuedARIEL CONSULTANTS LLC09/02/2025
DOB NOWSidewalk ShedPermit IssuedPARSONS CONSTRUCTION INC01/24/2024
DOB NOWSupported ScaffoldPermit IssuedPARSONS CONSTRUCTION INC01/24/2024
DOB NOWSupported ScaffoldPermit IssuedPARSONS CONSTRUCTION INC01/25/2023
DOB NOWSprinklersPermit IssuedVILLAGE P & H NY INC01/09/2023
DOB NOWSprinklersPermit IssuedVILLAGE P & H NY INC11/16/2022
DOB NOWAntennaPermit IssuedGOTHAM COMMUNICATIONS LLC10/04/2022
DOB NOWSidewalk ShedPermit IssuedPARSONS CONSTRUCTION INC01/31/2022
DOB NOWSidewalk ShedPermit IssuedPARSONS CONSTRUCTION INC10/20/2021
DOB NOWSprinklersPermit IssuedVILLAGE P & H NY INC09/29/2021
DOB NOWSidewalk ShedPermit IssuedPARSONS CONSTRUCTION INC07/06/2020
DOB NOWSupported ScaffoldPermit IssuedPARSONS CONSTRUCTION INC07/06/2020
BISOTISSUEDBDB CONSTRUCTION ENTERPRI05/01/2019
BISSPISSUEDFULL CAPACITY FIRE CORP02/02/2018
BISOTISSUEDBDB CONSTRUCTION ENTERPRI12/21/2017
BISEQISSUEDBDB CONSTRUCTION ENTERPRI12/21/2017
BISOTISSUEDSPK/LEWIS INC12/04/2017
BISMHISSUEDSPK/LEWIS INC12/04/2017
BISPLISSUEDTW PLUMBING & HEATING INC06/13/2016
BISSPISSUEDFULL CAPACITY FIRE CORP04/14/2016
BISMHISSUEDSPK/LEWIS INC04/07/2016
BISOTISSUEDSPK/LEWIS INC04/07/2016
BISMHISSUEDSPK/LEWIS INC12/03/2014
BISOTISSUEDSPK/LEWIS INC12/03/2014
BISPLISSUEDTW PLUMBING & HEATING INC11/13/2014
BISSPISSUEDFULL CAPACITY FIRE CORP11/12/2014
BISOTISSUEDSPK/LEWIS INC11/10/2014
BISMHISSUEDSPK/LEWIS INC11/10/2014
BISOTISSUEDBDB CONSTRUCTION ENTERPRI01/23/2013
BISOTISSUEDBDB CONSTRUCTION ENTERPRI08/16/2012
BISOTISSUEDODYSSIA GLOBAL COMM. CORP07/10/2012
BISEQISSUEDB H & B CONSTRUCTION INC07/02/2012
BISEQISSUEDB H & B CONSTRUCTION INC06/29/2012
BISEQISSUEDB & S RESTORATION INC05/17/2012
+ 28 more permits on file
2 projects · most recent 05/06/2026
FiledStatusContractorScope
05/06/2026Permit IssuedRAEL AUTOMATIC SPR.CO INC49 heads
09/24/2025Permit IssuedALLSTATE SPRINKLER LLC62 heads
2 projects · most recent 09/24/2025
Water/Sanitary
FiledStatusContractorScope
09/24/2025Signed-offCLEAN TECH MECHANICAL INCWater/Sanitary
08/28/2025Signed-offMT ENERGY INCWater/Sanitary
3 projects · most recent 11/18/2025
General Wiring
FiledStatusContractorScope
11/18/2025CompleteAMP-RITE ELEC. INC.General Wiring
07/03/2020Permit IssuedRICHARD NEU—
06/22/2018Permit IssuedSTAR ELEC'L CONTRACTORS C—
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
12/08/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/24/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/03/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/19/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/13/2024Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
09/22/2026Sprinkler SystemsRyan Hansenspecial
09/22/2026Fire-Resistant Penetrations and JointsRyan Hansenspecial
04/30/2026Fire-Resistant Penetrations and JointsRyan Hansenspecial
04/30/2026Sprinkler SystemsRyan Hansenspecial
09/19/2025Energy Code Compliance InspectionsRyan Hansenprogress
09/19/2025Fire-Resistant Penetrations and JointsRyan Hansenspecial
09/19/2025HVAC-R and service water piping design and insulationRyan Hansenenergy_progress
09/19/2025Fire-Resistant Penetrations and JointsRyan Hansenspecial
09/19/2025Energy Code Compliance InspectionsRyan Hansenprogress
09/19/2025HVAC-R and service water piping design and insulationRyan Hansenenergy_progress
09/12/2025FinalRyan Hansenprogress
09/12/2025Mechanical SystemsRyan Hansenspecial
08/27/2025FinalKEVIN PELLONprogress
08/27/2025Fire-Resistance Rated ConstructionKEVIN PELLONprogress
08/27/2025Interior lighting powerKEVIN PELLONenergy_progress
08/27/2025Lighting controlsKEVIN PELLONenergy_progress
08/27/2025Energy Code Compliance InspectionsKEVIN PELLONprogress
08/15/2025Interior lighting powerPAYAM RAHMANANenergy_progress
08/15/2025FinalPAYAM RAHMANANprogress
07/28/2021Sprinkler SystemsFayyaz Khanspecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
SprintOffice—
Project M00769419 Alteration · LOC Issued · 08/16/2022
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 416 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch10
09/03/2026M00565823-I1Request digital key ↗
09/02/2026M00765163-I1Request digital key ↗
09/02/2026M00769419-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/04/2026M00364220-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/15/2026M00364211-I1Request digital key ↗
▸Applications & Permits76
▸BISPLAN / WORK APPROVAL APPLICATION39
08/08/2018123178747Open ↗
12/07/2017123177846Open ↗
11/29/2017123178747Open ↗
Showing 3 of 39 on file for this type
▸BISWORK PERMIT APPLICATION36
05/02/2019123177846Open ↗
02/02/2018123178756Open ↗
12/22/2017123177846Open ↗
Showing 3 of 36 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
07/19/2013121337099Open ↗
▸Seals & Professional Certifications112
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION51
08/28/2018123178747Open ↗
08/20/2018123178756Open ↗
12/08/2017123178756Open ↗
Showing 3 of 51 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST15
12/07/2017123177846Open ↗
11/30/2017123178756Open ↗
11/30/2017123178747Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
09/04/2026M00364220-I1Open ↗
09/04/2026M00364211-I1Open ↗
09/02/2026M00769419-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
09/02/2026M01272308-I1Open ↗
09/02/2026M01272308-I1Open ↗
09/01/2026M01278183-I1Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT9
12/07/2017123177846Open ↗
11/29/2017123178747Open ↗
11/29/2017123178747Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/23/2026M01278183-S2Open ↗
08/31/2026M01278183-S3Open ↗
08/30/2026M00565823-I1Open ↗
Showing 3 of 6 on file for this type
▸Trade Schedules & Equipment30
▸BISSELF-CERT PLUMBING NOTICE10
12/02/2015122179542Open ↗
10/02/2015122179542Open ↗
06/04/2015122179542Open ↗
Showing 3 of 10 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE7
11/29/2017123178747Open ↗
04/15/2016122750451Open ↗
07/16/2015122179542Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISSPRINKLER INSP REPORT : FP-852
12/02/2015122179542Open ↗
Showing 1 of 2 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
03/19/2018122752100Open ↗
01/03/2017122178954Open ↗
▸BISEQUIPMENT USE PERMITS1
12/07/2016122750068Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
12/07/2016122750068Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
12/07/2017123177846Open ↗
▸Environmental & Asbestos32
▸BISASBESTOS: CERTIFICATION (DEP ACP5)11
12/07/2017123177846Open ↗
11/29/2017123178747Open ↗
11/29/2017123178756Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
09/02/2026M00769419-I1Open ↗
08/21/2026M01272308-I1Open ↗
08/21/2026M01272308-S1Open ↗
Showing 3 of 10 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Energy Compliance24
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS18
08/28/2018123178747Open ↗
12/07/2017123177846Open ↗
12/05/2017123178747Open ↗
Showing 3 of 18 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS5
08/28/2018123178747Open ↗
05/15/2017122750068Open ↗
11/17/2016122179542Open ↗
Showing 3 of 5 on file for this type
▸BISTR8: Energy Code Progress Inspections1
03/07/2014121515743Open ↗
▸Inspections & Test Reports3
▸BISHYDRAULIC FLOW CALCULATIONS2
12/01/2014122179542Open ↗
11/03/2014122179542Open ↗
▸BISTECHNICAL REPORT: PILE DRIVING1
11/17/2016122179542Open ↗
▸Approvals, Objections & Sign-offs39
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST19
09/06/2018122752100Open ↗
09/06/2018122750451Open ↗
08/28/2018123178747Open ↗
Showing 3 of 19 on file for this type
▸BISADMINISTRATIVE OBJECTIONS14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
05/08/2017122178954Open ↗
11/17/2016122179542Open ↗
04/10/2014120899849Open ↗
Showing 3 of 4 on file for this type
▸BISSHED LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Cost, Insurance & Ownership43
▸BISCOST AFFIDAVIT43
09/06/2018122752100Open ↗
09/06/2018122750451Open ↗
08/28/2018123178747Open ↗
Showing 3 of 43 on file for this type
▸Filing & Intake Forms40
▸BISEFILING COVER SHEET25
12/07/2017123177846Open ↗
11/29/2017123178747Open ↗
11/29/2017123178747Open ↗
Showing 3 of 25 on file for this type
▸BISADDITIONAL INFORMATION10
11/17/2016122179542Open ↗
06/29/2016122750068Open ↗
06/29/2016122750068Open ↗
Showing 3 of 10 on file for this type
▸BISBOROUGH INTAKE FORM5
09/06/2018122752100Open ↗
09/06/2018122750451Open ↗
08/28/2018123178747Open ↗
Showing 3 of 5 on file for this type
▸Other Documents4
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
04/04/2016122752100Open ↗
12/16/2014122179542Open ↗
Showing 2 of 3 on file for this type
▸BISSupporting Document: Fee Except1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type