137 EAST 66TH STREET
MANHATTAN · BIN 1042462
💬 Discuss this project
1918Year Built
9Stories
D4Building Class
R8BZoning
62,352 sfGross Floor Area
33Units
LL97 CoveredRent Stabilized0 Active ViolationsFISP: SWARMP
Elevator cooperative · Owner of record: 137 East 66th St Inc.c/O BHS · 9,038 sf lot · 6.9 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipment
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofFacade repairs and window sealingUnder Construction15p · 2 filings · 20 docs
PenthouseUnit PHNEUnder Construction22p · 1 filing · 20 docs
Floor 9Under Construction1 filing · 20 docs
Floor 84p · 2 filings · 14 docs
Floor 7Unit 7A, Unit 7C, Unit 7D25p · 5 filings · 20 docs
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1Unit 1B, Unit 1D12p · 2 filings · 10 docs
Site & exteriorFacade repairs and window sealingUnder Construction21p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
137 East 66th St1903/22/2026
Park Ave & 84th Street503/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Wsconsultant & Expediting Services1403/21/2026
Clarke Construction Consultants503/21/2026
Municipal Building Consultants503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Kings Group NYScaffold607/08/2026
New York FloormanGeneral Contractor507/08/2026
The I. Grace Company CommercialGeneral Contractor407/08/2026
BMS ConstructionGeneral Contractor303/21/2026
UBS BuildersGeneral Contractor303/21/2026
Practical Plumbing & HeatingPlumbing307/08/2026
Forte Express P & HPlumbing207/08/2026
Awr GroupGeneral Contractor106/28/2026
Judd ElectricElectrical103/21/2026
Agius Plumbing & HeatingPlumbing107/08/2026
Aspect Plumbing & Heating CoPlumbing107/08/2026
Hello ChapterGeneral Contractor107/08/2026
L.J.F. Electric CoElectrical103/21/2026
Ajf ElectricElectrical103/21/2026
JLC Electrical ContractingElectrical103/22/2026
Norway ElectricElectrical103/21/2026
Napstar ElectricElectrical103/21/2026
Arista Air Conditioningspecialty_contractor110/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Richmond Testing Lab263210/20/2026
Patriz C. Consultants7191106/04/2026
KZ Engineering4665104/07/2026
RHL Engineering712307/16/2024
AK Consulting Services, I6198207/26/2023
Crosscheck Inspection Services544107/18/2022
Sandeep Gunnala Engineering8482106/14/2022
Winton Group Architecture4343201/30/2022
Building Lifecycle
All (163)Filed (22)Permit Issued (23)Signed Off (8)Facade (FISP) (15)Violation (31)Inspection (14)Objection (20)Special Inspection (30)
10/20/2026
Filed — Alteration
FILING FOR ADDITION OF NEW DAIKIN VRV SYSTEM WITH ROOFTOP HEAT PUMP.
M01006584-P2
10/19/2026
Special inspection requirement — Post-installed Anchors
RICHARD LEMANSKY
10/19/2026
Special inspection requirement — Structural Steel - High Strength Bolting
RICHARD LEMANSKY
10/19/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
RICHARD LEMANSKY
10/19/2026
Special inspection requirement — Final
RICHARD LEMANSKY
10/19/2026
Special inspection requirement — Structural Steel - Details
RICHARD LEMANSKY
10/19/2026
Special inspection requirement — Structural Steel - Welding
RICHARD LEMANSKY
10/19/2026
Special inspection requirement — Masonry
RICHARD LEMANSKY
10/08/2026
Permit issued — Mechanical Systems
M01006584-S2-MS
06/26/2026
Permit issued — General Construction
M01400524-I1-GC
06/04/2026
Filed — Alteration
Facade repairs to include masonry, pointing, flashing, and caulking. Close and seal window openings.
M01400524-I1
05/30/2026
Special inspection requirement — Air barrier - visual inspection
SHAWN KELLY
05/11/2026
Special inspection requirement — Masonry
SHAWN KELLY
05/11/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
SHAWN KELLY
05/11/2026
Special inspection requirement — Final
SHAWN KELLY
05/11/2026
Special inspection requirement — Tenant Protection Plan Compliance
SHAWN KELLY
05/11/2026
Special inspection requirement — Energy Code Compliance Inspections
SHAWN KELLY
04/16/2026
Permit issued — Suspended Scaffold
M01383892-I1-SC
04/07/2026
Filed — Alteration
Installation of suspended scaffold for facade inspection/repair.
M01383892-I1
04/07/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Karol Zdancewicz
04/07/2026
Special inspection requirement — Post-installed Anchors
Karol Zdancewicz
09/12/2025
Permit issued — Structural
M01006584-S3-ST
09/12/2025
Permit issued — Plumbing
M01006584-S1-PL
09/11/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/10/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/16/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/30/2024
Signed off — Alteration
Installation of plumbing fixtures and replacement of fixtures, no change in use, egress or occupancy.
M00701882-I1
10/29/2024
Permit issued — Structural
M01006584-S3-ST
10/17/2024
Signed off — Alteration
GENERAL CONSTRUCTION FOR INTERIOR RENOVATIONS FOR APARTMENT 7C AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00844304-I1
09/11/2024
Permit issued — Plumbing
M01006584-S1-PL
09/09/2024
Permit issued — General Construction
M01006584-I1-GC
07/25/2024
Objection resolved — Addressed
07/24/2024
Objection raised — Scope
07/16/2024
Filed — Alteration
FILING FOR ADDITION OF NEW DAIKIN VRV SYSTEM WITH ROOFTOP HEAT PUMP.
M01006584-S2
07/15/2024
Filed — Alteration
FILING FOR ADDITION OF NEW DAIKIN VRV SYSTEM WITH ROOFTOP HEAT PUMP.
M01006584-S1
07/12/2024
Filed — Alteration
FILING FOR ADDITION OF NEW DAIKIN VRV SYSTEM WITH ROOFTOP HEAT PUMP.
M01006584-I1
07/12/2024
Filed — Alteration
FILING FOR ADDITION OF NEW DAIKIN VRV SYSTEM WITH ROOFTOP HEAT PUMP.
M01006584-S3
07/11/2024
Special inspection requirement — Fire-Resistance Rated Construction
Vincent Gentile
06/27/2024
Special inspection requirement — Masonry
RICHARD LEMANSKY
06/25/2024
Special inspection requirement — Post-installed Anchors
RICHARD LEMANSKY
06/25/2024
Special inspection requirement — Structural Steel - High Strength Bolting
RICHARD LEMANSKY
06/25/2024
Special inspection requirement — Structural Steel - Details
RICHARD LEMANSKY
06/25/2024
Special inspection requirement — Structural Steel - Welding
RICHARD LEMANSKY
06/24/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
RICHARD LEMANSKY
06/24/2024
Special inspection requirement — Final
RICHARD LEMANSKY
06/12/2024
Cycle 9 facade report signed — SWARMP
06/11/2024
Cycle 9 facade inspection completed
03/06/2024
Special inspection requirement — Interior lighting power
SAUL HAYUTIN
03/06/2024
Special inspection requirement — Shutoff dampers
RICHARD LEMANSKY
03/06/2024
Special inspection requirement — Exterior lighting power
SAUL HAYUTIN
03/06/2024
Special inspection requirement — HVAC-R and service water heating equipment
RICHARD LEMANSKY
03/06/2024
Special inspection requirement — HVAC-R and service water heating system controls
RICHARD LEMANSKY
03/06/2024
Special inspection requirement — Maintenance information
RICHARD LEMANSKY
03/06/2024
Special inspection requirement — Metering
RICHARD LEMANSKY
02/15/2024
Cycle 9 facade report submitted
09/14/2023
Signed off — Alteration
M00742876-I1
09/14/2023
Signed off — Alteration
PLUMBING MODIFICATIONS FOR APARTMENTS 1B AND 1D COMBINATION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M00742921-I1
08/09/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/09/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/08/2023
Permit issued — General Construction
M00844304-I1-GC
Latest 60 of 163 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedArista Air Conditioning10/08/2026
DOB NOWGeneral ConstructionPermit IssuedAwr Group06/26/2026
DOB NOWSuspended ScaffoldPermit IssuedAwr Group04/16/2026
DOB NOWStructuralPermit IssuedThe I. Grace Company Commercial09/12/2025
DOB NOWPlumbingSigned-offForte Express P & H09/12/2025
DOB NOWStructuralPermit IssuedThe I. Grace Company Commercial10/29/2024
DOB NOWPlumbingSigned-offForte Express P & H09/11/2024
DOB NOWGeneral ConstructionPermit IssuedThe I. Grace Company Commercial09/09/2024
DOB NOWGeneral ConstructionSigned-offHello Chapter08/08/2023
DOB NOWPlumbingSigned-offAgius Plumbing & Heating03/10/2023
DOB NOWGeneral ConstructionSigned-offBMS Construction03/07/2023
DOB NOWPlumbingSigned-offAspect Plumbing & Heating Co09/20/2022
DOB NOWGeneral ConstructionSigned-offUBS Builders09/16/2022
DOB NOWGeneral ConstructionSigned-offNew York Floorman05/18/2022
DOB NOWPlumbingSigned-offPractical Plumbing & Heating04/13/2022
DOB NOWPlumbingSigned-offPractical Plumbing & Heating02/08/2022
DOB NOWGeneral ConstructionSigned-offNew York Floorman02/04/2022
DOB NOWPlumbingSigned-offPractical Plumbing & Heating09/02/2021
DOB NOWGeneral ConstructionSigned-offNew York Floorman08/20/2021
DOB NOWSidewalk ShedSigned-offKings Group NY09/19/2019
DOB NOWSupported ScaffoldSigned-offKings Group NY09/19/2019
DOB NOWSupported ScaffoldSigned-offKings Group NY06/26/2019
DOB NOWSidewalk ShedSigned-offKings Group NY06/20/2019
BISOTISSUEDAwr Group09/20/2019
BISEQISSUEDAwr Group09/13/2019
BISOTISSUEDP & P Construction & Painting06/18/2019
BISPLISSUEDNY Plumbing & Heating04/02/2019
BISOTISSUEDP & P Construction & Painting03/29/2019
BISPLISSUEDEast Coast Mechnacial03/01/2018
BISPLISSUEDBranch Plumbing10/25/2016
BISPLISSUEDBranch Plumbing11/19/2014
BISEQISSUEDEverest Scaffolding04/11/2013
BISOTISSUEDRiconda Maintenance01/15/2013
BISOTISSUEDRiconda Maintenance09/20/2012
BISEQISSUEDEverest Scaffolding09/17/2012
BISOTISSUEDCardinal Sales04/23/2010
BISPLISSUEDEmpire Plumbing04/19/2010
BISOTISSUEDRiconda Maintenance01/17/2010
BISMHISSUEDCardinal Sales12/09/2009
BISPLISSUEDR&A Heating & Contracting Co.i08/20/2009
+ 30 more permits on file
1 project · most recent 10/20/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
10/20/2026Permit IssuedArista Air ConditioningHeating and Air Conditioning Systems
Heat / Cool
Daikin FXDQ09MVJU 8,000 BTU · Vrf Indoor ×4
FXDQ12MVJU 10,100 BTU · Vrf Indoor ×2
HP-1 RXTQ36TAVJUA 34,200 BTU · Vrf Outdoor ×2
2 projects · most recent 10/20/2026
Water/Sanitary
FiledStatusContractorScope
10/20/2026Signed-offForte Express P & HWater/Sanitary
07/25/2023——Water/Sanitary
14 projects · most recent 09/09/2024
General Wiring
FiledStatusContractorScope
09/09/2024CompleteWarren Ostroff ElectricGeneral Wiring
07/16/2024CompleteW 8 ElectricGeneral Wiring
08/11/2023CompleteAscuatech ElectricalGeneral Wiring
07/24/2023CompleteAscuatech Electrical—
05/08/2023Permit IssuedLmec ElectricGeneral Wiring
11/01/2022CompleteEis Electric Corp DbaGeneral Wiring
08/04/2022CompleteHY-Lee Electric CoGeneral Wiring
06/10/2022CompleteStar Electrical Contractors—
09/01/2021CompleteGsa ElectricGeneral Wiring
01/30/2020CompleteMLS ElectricGeneral Wiring
06/13/2019CompleteRichard Neu—
03/28/2019CancelledJLC Electrical ContractingGeneral Wiring
03/20/2019CompleteGRX Euro Electric—
05/08/2018Permit IssuedTower ElectricGeneral Wiring
1 project · most recent 10/20/2026
Steel Masonry
FiledStatusContractorScope
10/20/2026Permit IssuedArista Air ConditioningSteel, Masonry
1 project · most recent 04/07/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
04/07/2026Permit IssuedAwr GroupSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
09/11/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/10/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/16/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/09/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/09/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/21/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/16/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/12/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/08/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/22/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/14/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/16/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/06/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/06/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 67
DateRequirementInspectorRole
10/19/2026Structural Steel - DetailsRICHARD LEMANSKYspecial
10/19/2026MasonryRICHARD LEMANSKYspecial
10/19/2026Post-installed AnchorsRICHARD LEMANSKYspecial
10/19/2026Structural Stability – Alterations of existing buildingsRICHARD LEMANSKYspecial
10/19/2026FinalRICHARD LEMANSKYprogress
10/19/2026Structural Steel - WeldingRICHARD LEMANSKYspecial
10/19/2026Structural Steel - High Strength BoltingRICHARD LEMANSKYspecial
05/30/2026Air barrier - visual inspectionSHAWN KELLYenergy_progress
05/11/2026Tenant Protection Plan ComplianceSHAWN KELLYspecial
05/11/2026FinalSHAWN KELLYprogress
05/11/2026MasonrySHAWN KELLYspecial
05/11/2026Energy Code Compliance InspectionsSHAWN KELLYprogress
05/11/2026Structural Stability – Alterations of existing buildingsSHAWN KELLYspecial
04/07/2026Alternative Materials - OTCR Buildings Bulletin NumberKarol Zdancewiczspecial
04/07/2026Post-installed AnchorsKarol Zdancewiczspecial
07/11/2024Fire-Resistance Rated ConstructionVincent Gentileprogress
06/27/2024MasonryRICHARD LEMANSKYspecial
06/25/2024Post-installed AnchorsRICHARD LEMANSKYspecial
06/25/2024Structural Steel - WeldingRICHARD LEMANSKYspecial
06/25/2024Structural Steel - High Strength BoltingRICHARD LEMANSKYspecial
06/25/2024Structural Steel - DetailsRICHARD LEMANSKYspecial
06/24/2024FinalRICHARD LEMANSKYprogress
06/24/2024Structural Stability – Alterations of existing buildingsRICHARD LEMANSKYspecial
03/06/2024Shutoff dampersRICHARD LEMANSKYenergy_progress
03/06/2024Interior lighting powerSAUL HAYUTINenergy_progress
Latest 25 of 67.
▾Documents — 291 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch19
09/03/2026M00494506-P2Request digital key ↗
09/03/2026M00494506-P1Request digital key ↗
09/02/2026M00494487-P1Request digital key ↗
Showing 3 of 19 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00180350-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/05/2026M00182756-I1Request digital key ↗
▸Applications & Permits37
▸BISPLAN / WORK APPROVAL APPLICATION19
08/09/2021120102922Open ↗
08/04/2021120102922Open ↗
09/11/2019140868602Open ↗
Showing 3 of 19 on file for this type
▸BISWORK PERMIT APPLICATION18
09/23/2019123401265Open ↗
09/13/2019140868602Open ↗
09/11/2019140868602Open ↗
Showing 3 of 18 on file for this type
▸Seals & Professional Certifications109
▸DOB NOWProgress Inspector Seal & Signature33
10/22/2026M01006584-P1Open ↗
10/22/2026M01006584-P2Open ↗
10/22/2026M01006584-P1Open ↗
Showing 3 of 33 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION23
03/19/2020123757577Open ↗
05/31/2019123401265Open ↗
05/29/2019123401265Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature22
10/22/2026M01006584-P1Open ↗
10/22/2026M01006584-P2Open ↗
09/05/2026M00180350-I1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature18
10/22/2026M01006584-P2Open ↗
10/22/2026M01006584-P1Open ↗
09/02/2026M01006584-S2Open ↗
Showing 3 of 18 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
09/20/2012121379668Open ↗
09/14/2012121372335Open ↗
08/13/2009120128218Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
09/20/2012121379668Open ↗
09/14/2012121372335Open ↗
08/17/2009120128218Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
09/11/2019140868602Open ↗
04/11/2013140069510Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
09/11/2019140868602Open ↗
04/11/2013140069510Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
09/11/2019140868602Open ↗
04/11/2013140069510Open ↗
▸Trade Schedules & Equipment4
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
03/11/2019123757577Open ↗
07/24/2015122115656Open ↗
09/03/2014122115656Open ↗
▸BISSCHEDULE B - PLUMBING1
11/06/2009120199613Open ↗
▸Safety & Tenant Protection3
▸BISTenant Protection Plan and Notes3
03/11/2019123757577Open ↗
08/15/2018123401265Open ↗
09/11/2019140868602Open ↗
▸Environmental & Asbestos30
▸DOB NOWDEP ACP-5: Asbestos Assessment Report19
10/22/2026M01006584-P1Open ↗
10/22/2026M01006584-P2Open ↗
09/05/2026M00182756-I1Open ↗
Showing 3 of 19 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
03/29/2019123757577Open ↗
08/15/2018123401265Open ↗
09/03/2014122115656Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
11/06/2009120199613Open ↗
07/15/2009120102922Open ↗
▸BISASBESTOS INSPECTION REPORT2
08/13/2009120128218Open ↗
08/13/2009120128218Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/29/2026M00844304-I1Open ↗
08/13/2026M00844300-I1Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
07/17/2009120107366Open ↗
▸Energy Compliance13
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
03/19/2020123757577Open ↗
05/31/2019123401265Open ↗
05/29/2019123401265Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
07/23/2020123401265Open ↗
03/19/2020123757577Open ↗
10/16/2013121372335Open ↗
▸DOB NOWEN2: As Built Energy Analysis3
08/13/2026M00742876-I1Open ↗
08/13/2026M00701911-I1Open ↗
08/13/2026M00494487-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
07/27/2020123401265Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY6
08/18/2021120102922Open ↗
07/27/2020123401265Open ↗
07/23/2020123401265Open ↗
Showing 3 of 6 on file for this type
▸Approvals, Objections & Sign-offs22
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST12
08/18/2021120102922Open ↗
07/27/2020123401265Open ↗
05/06/2020140868602Open ↗
Showing 3 of 12 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
09/20/2012121379668Open ↗
09/14/2012121372335Open ↗
08/13/2009120128218Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
10/16/2013121372335Open ↗
07/10/2013121379668Open ↗
07/10/2013140069510Open ↗
Showing 3 of 4 on file for this type
▸BISSUPERSEDING LETTER1
03/09/2018122115656Open ↗
▸Cost, Insurance & Ownership14
▸BISCOST AFFIDAVIT14
08/18/2021120102922Open ↗
07/23/2020123401265Open ↗
03/19/2020123757577Open ↗
Showing 3 of 14 on file for this type
▸Filing & Intake Forms23
▸BISADDITIONAL INFORMATION8
10/24/2019140868602Open ↗
05/31/2019123401265Open ↗
05/29/2019123401265Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING COVER SHEET8
03/11/2019123757577Open ↗
08/15/2018123401265Open ↗
09/03/2014122115656Open ↗
Showing 3 of 8 on file for this type
▸BISBOROUGH INTAKE FORM5
03/19/2020123757577Open ↗
05/29/2019123401265Open ↗
04/02/2019123757577Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
09/11/2019140868602Open ↗
04/11/2013140069510Open ↗
▸Other Documents9
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION7
03/29/2019123757577Open ↗
08/13/2009120128218Open ↗
08/13/2009120128218Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWCalculations1
08/13/2026M01383892-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01383892-I1Open ↗