Miscellaneous two family
137 KINGSLAND AVENUE
BROOKLYN · BIN 3069762
💬 Discuss this project
1910Year Built
2Stories
B9Building Class
R6BZoning
1,960 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Miscellaneous two family · 1,500 sf lot · 1.31 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Roof1p · 1 filing · 19 docs
Cellar1p · 1 filing · 5 docs
2 jobs · most recent 02/18/2025
General Wiring
FiledStatusContractorScope
02/18/2025CompleteAMERICAN POWER ELECT CONSGeneral Wiring
05/13/2019CompleteBELMONT ELECTRICAL, INC2 meters, 2 new_meters
Building Lifecycle
All (87)Filed (6)Permit Issued (4)Signed Off (4)Violation (4)Inspection (9)Objection (30)Special Inspection (30)
04/25/2025
Signed off — Alteration
EXISTING TWO FAMILY HOUSE WITH INTERIOR RENOVATION ON PARTITION & MECHANICAL WORK AT CELLAR, 1ST & 2ND FLOORS; STRUCTURAL WORK ON THE ROOF/BULKHEAD AND OPEN SPACE WORK AT THE REAR. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY.
B01052500-S1
04/23/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/21/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/14/2025
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY FENCE AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B00981822-I1
03/24/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/18/2025
Signed off — Alteration
EXISTING TWO FAMILY HOUSE WITH INTERIOR RENOVATION ON PARTITION & MECHANICAL WORK AT CELLAR, 1ST & 2ND FLOORS; STRUCTURAL WORK ON THE ROOF/BULKHEAD AND OPEN SPACE WORK AT THE REAR. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY.
B01052500-I1
03/05/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/25/2025
Signed off — Alteration
TEMPORARY SHORING OF THE EXISITNG 2-STORY WOOD FRAME HOUSE. NO CERTIFICATE OF OCCUPANCY REQUIRED.
B01074998-I1
02/24/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/19/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
01/13/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
12/24/2024
Filed — Alteration
EXISTING TWO FAMILY HOUSE WITH INTERIOR RENOVATION ON PARTITION & MECHANICAL WORK AT CELLAR, 1ST & 2ND FLOORS; STRUCTURAL WORK ON THE ROOF/BULKHEAD AND OPEN SPACE WORK AT THE REAR. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY.
B01052500-P1
12/19/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/13/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/18/2024
Permit issued — Plumbing
B01052500-S1-PL
09/13/2024
Special inspection requirement — HVAC-R and service water heating system controls
CALVIN TRAN
09/13/2024
Special inspection requirement — Maintenance information
CALVIN TRAN
09/13/2024
Special inspection requirement — Energy Code Compliance Inspections
CALVIN TRAN
09/13/2024
Special inspection requirement — HVAC-R and service water heating equipment
CALVIN TRAN
09/13/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
CALVIN TRAN
09/12/2024
Filed — Alteration
EXISTING TWO FAMILY HOUSE WITH INTERIOR RENOVATION ON PARTITION & MECHANICAL WORK AT CELLAR, 1ST & 2ND FLOORS; STRUCTURAL WORK ON THE ROOF/BULKHEAD AND OPEN SPACE WORK AT THE REAR. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY.
B01052500-P2
08/30/2024
Special inspection requirement — HVAC-R and service water heating equipment
CALVIN TRAN
08/30/2024
Special inspection requirement — Fenestration air leakage
CALVIN TRAN
08/30/2024
Special inspection requirement — Energy Code Compliance Inspections
CALVIN TRAN
08/30/2024
Special inspection requirement — HVAC-R and service water heating system controls
CALVIN TRAN
08/30/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
CALVIN TRAN
08/30/2024
Special inspection requirement — Maintenance information
CALVIN TRAN
08/30/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
CALVIN TRAN
08/30/2024
Special inspection requirement — Insulation placement and R values
CALVIN TRAN
08/30/2024
Special inspection requirement — Interior lighting power
CALVIN TRAN
08/30/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
08/30/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
CHRISTIAN LOZADA
08/30/2024
Special inspection requirement — Maintenance information
CALVIN TRAN
08/30/2024
Special inspection requirement — Fenestration areas
CALVIN TRAN
08/30/2024
Special inspection requirement — Metering
CALVIN TRAN
08/30/2024
Special inspection requirement — HVAC-R and service water heating equipment
CALVIN TRAN
08/30/2024
Special inspection requirement — HVAC-R and service water heating system controls
CALVIN TRAN
08/30/2024
Special inspection requirement — Energy Code Compliance Inspections
CALVIN TRAN
08/30/2024
Special inspection requirement — Final
CALVIN TRAN
08/30/2024
Special inspection requirement — Fire-Resistance Rated Construction
CALVIN TRAN
08/30/2024
Special inspection requirement — Structural Wood Frame
CALVIN TRAN
08/30/2024
Special inspection requirement — Air barrier - visual inspection
CALVIN TRAN
08/30/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
CALVIN TRAN
07/31/2024
Permit issued — Structural
B01074998-I1-GC-CX
07/26/2024
Objection resolved — Addressed
07/26/2024
Objection resolved — Addressed
07/26/2024
Special inspection requirement — Structural Wood Frame
THOMAS TUNG
07/24/2024
Objection resolved — Addressed
07/24/2024
Objection resolved — Addressed
07/24/2024
Objection resolved — Addressed
07/24/2024
Objection resolved — Addressed
07/24/2024
Objection resolved — Addressed
07/12/2024
Objection raised — Admin
07/12/2024
Objection raised — Admin
07/12/2024
Objection raised — Admin
07/12/2024
Objection raised — Admin
07/12/2024
Objection raised — Admin
07/12/2024
Objection raised — Inspections
07/12/2024
Objection raised — Zoning
07/09/2024
Filed — Alteration
TEMPORARY SHORING OF THE EXISITNG 2-STORY WOOD FRAME HOUSE. NO CERTIFICATE OF OCCUPANCY REQUIRED.
B01074998-I1
Latest 60 of 87 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GREENLAND EQUITIES1607/08/2026
HPD303/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/21/2025$2.4M—— → —$1,202/sf building
06/10/2024$658K—Private party → 137 KINGSLAND LLC$335/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CQ&J CORPORATION512/24/2024
THOMAS C. TUNG, P.E.107/09/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WM ARCH1003/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GBI CONTRACTING, LLCGeneral Contractor307/08/2026
G.N. CONSTRUCTION INCGeneral Contractor203/21/2026
AMERICAN POWER ELECT CONSElectrical103/22/2026
DPH PLUMBING & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL ENGINEERING P.C.6781212/24/2024
D&E BUILD EVERGREEN I9342107/09/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offDPH PLUMBING & HTG CORP09/18/2024
DOB NOWStructuralSigned-offGBI CONTRACTING, LLC07/31/2024
DOB NOWStructuralSigned-offGBI CONTRACTING, LLC06/07/2024
DOB NOWConstruction FenceSigned-offEMPIRE CONSTRUCTION ASSOC05/16/2024
BISPLISSUEDAMOK INC06/19/1995
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
04/23/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/21/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/24/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/05/2025Pass-Final General Construction Non-Directive 14PassView ↗
02/24/2025Pass-Final General Construction Non-Directive 14PassView ↗
02/19/2025Fail-Final General Construction Non-Directive 14FailView ↗
01/13/2025Fail-Final General Construction Non-Directive 14FailView ↗
12/19/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/13/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
09/13/2024HVAC-R and service water heating system controlsCALVIN TRANenergy_progress
09/13/2024Maintenance informationCALVIN TRANenergy_progress
09/13/2024Energy Code Compliance InspectionsCALVIN TRANprogress
09/13/2024HVAC-R and service water heating equipmentCALVIN TRANenergy_progress
09/13/2024HVAC-R and service water piping design and insulationCALVIN TRANenergy_progress
08/30/2024HVAC-R and service water heating equipmentCALVIN TRANenergy_progress
08/30/2024Fenestration air leakageCALVIN TRANenergy_progress
08/30/2024Energy Code Compliance InspectionsCALVIN TRANprogress
08/30/2024HVAC-R and service water heating system controlsCALVIN TRANenergy_progress
08/30/2024HVAC-R and service water piping design and insulationCALVIN TRANenergy_progress
08/30/2024Maintenance informationCALVIN TRANenergy_progress
08/30/2024Fenestration and door U-factor and product ratingsCALVIN TRANenergy_progress
08/30/2024Insulation placement and R valuesCALVIN TRANenergy_progress
08/30/2024Interior lighting powerCALVIN TRANenergy_progress
08/30/2024Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
08/30/2024Structural Stability – Alterations of existing buildingsCHRISTIAN LOZADAspecial
08/30/2024Maintenance informationCALVIN TRANenergy_progress
08/30/2024Fenestration areasCALVIN TRANenergy_progress
08/30/2024MeteringCALVIN TRANenergy_progress
08/30/2024HVAC-R and service water heating equipmentCALVIN TRANenergy_progress
08/30/2024HVAC-R and service water heating system controlsCALVIN TRANenergy_progress
08/30/2024Energy Code Compliance InspectionsCALVIN TRANprogress
08/30/2024FinalCALVIN TRANprogress
08/30/2024Fire-Resistance Rated ConstructionCALVIN TRANprogress
08/30/2024Structural Wood FrameCALVIN TRANprogress
Latest 25 of 30.
▾Documents — 27 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/25/2026B00981822-I1Request digital key ↗
08/25/2026B01052500-P2Request digital key ↗
08/25/2026B01052500-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
07/15/2025300429766Open ↗
▸Seals & Professional Certifications16
▸DOB NOWProgress Inspector Seal & Signature8
09/01/2026B01052500-S1Open ↗
09/01/2026B01052500-S1Open ↗
09/01/2026B01052500-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/25/2026B01052500-P2Open ↗
08/25/2026B01052500-P1Open ↗
08/25/2026B01052500-S1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026B01052500-P1Open ↗
08/25/2026B01074998-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/25/2026B01052500-I1Open ↗
08/25/2026B01052500-P2Open ↗
08/25/2026B01052500-P1Open ↗
Showing 3 of 4 on file for this type