← Back
Condo, commercial tower (mixed-use) [derived]
137-139 West Condominium
137 WEST 25 STREET · Chelsea-Hudson Yards · BIN 1068241
💬 Discuss this project
1910Year Built
12Stories
RCBuilding Class
M1-8A/R11Zoning
80,850 sfGross Floor Area
14Units
LL97 Covered3 Open Violations 1 unresolved · 2 paperwork only ▸FISP: SWARMP
Condo, commercial tower (mixed-use) [derived] · Owner of record: 137-139 W 25 ST CONDO · 6,550 sf lot · 12.34 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneralOther
Roof2p · 1 filing · 6 docs
Floor 1016p · 1 filing · 5 docs
Floor 9
Floor 849p · 2 filings · 20 docs
Floor 714p · 1 filing · 18 docs
Floor 61p · 1 filing · 4 docs
Floor 5
Floor 4
Floor 3
Floor 2
Floor 11p · 1 filing · 6 docs
Site & exterior5p · 1 filing · 2 docs
Filed — no permit issued5p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
137 WEST 25TH STREET RM1803/21/2026
JOAN MITCHEL FOUNDATION1703/21/2026
AKAM ASSOCIATES, INC.1104/09/2026
137-139 W 25 ST CONDO1003/22/2026
OBEETEE903/21/2026
LDE PROPERTIES903/21/2026
LANDMARK 25703/21/2026
FASHION ACCESSORIES SHIPG ASSOC503/21/2026
WALLACK MANAGEMENT303/21/2026
DEZER PROPERTIES303/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HIERARCH-E403/21/2026
CONVERSANO ASSOCIATES, INC.1403/21/2026
SYNERGY BUILDING CONSULTANTS103/21/2026
ACA ASSOCIATES103/21/2026
GILLMAN CONSULTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PREMIER FLOW PLBG HTGPlumbing503/22/2026
AUDIO STRUCTURES INCGeneral Contractor407/08/2026
GC STERLING CONTRACTORS LGeneral Contractor303/21/2026
BROOKLYN INTERIORS INCGeneral Contractor203/21/2026
CS BRIDGE CORPGeneral Contractor203/21/2026
PREMIER FLOW PLBG AND HTGFire Protection107/08/2026
ABBEY ELECTRIC INCElectrical103/22/2026
INTEGRATED HVAC SYS & SVCGeneral Contractor104/09/2026
RAPID RUBBISH LLCGeneral Contractor107/08/2026
MICHAEL BAPTISTEElectrical103/21/2026
CESAR QUERYElectrical103/21/2026
WCK ELECTRIC CORP.Electrical103/22/2026
KG SPRINKLER CORPFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
VINCENT J. LIOTTA P. E.1974101/06/2026
SOCOTEC ENGINEERING4983305/02/2025
ATLAS ATC ENGINEERING INC8011107/07/2022
TWIG SPECIAL INSPECTIONS885302/18/2022
Building Lifecycle
All (155)Filed (14)Permit Issued (12)Signed Off (8)Facade (FISP) (15)Violation (60)Inspection (4)Objection (12)Special Inspection (30)
01/29/2026
Signed off — Alteration
M01319273-I1
01/16/2026
Permit issued — Mechanical Systems
M01319273-I1-MS
01/06/2026
Filed — Alteration
M01319273-I1
11/14/2025
Special inspection requirement — Final
Vincent Liotta
11/14/2025
Special inspection requirement — Mechanical Systems
Vincent Liotta
11/14/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Vincent Liotta
11/14/2025
Special inspection requirement — Maintenance information
Vincent Liotta
11/14/2025
Special inspection requirement — HVAC-R and service water heating equipment
Vincent Liotta
11/14/2025
Special inspection requirement — HVAC-R and service water heating system controls
Vincent Liotta
08/05/2025
Signed off — Alteration
Industrial rope access as per plans filed herewith.
M01044979-I1
08/05/2025
Permit issued — Suspended Scaffold
M01044979-I1-SC
07/23/2025
Signed off — Alteration
FILING HEREWITH FOR THE MODIFICATIONS OF WET SPRINKLER COVERAGE ON THE 7TH FLOOR. THERE IS NO CHANGE TO USE, EGRESS, OR OCCUPANCY
M01095984-I1
07/22/2025
Signed off — Alteration
FILING HEREWITH FOR THE MODIFICATIONS OF WET SPRINKLER COVERAGE ON THE 7TH FLOOR. THERE IS NO CHANGE TO USE, EGRESS, OR OCCUPANCY
M01095984-S4
07/08/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/02/2025
Signed off — Alteration
FILING HEREWITH FOR THE MODIFICATIONS OF WET SPRINKLER COVERAGE ON THE 7TH FLOOR. THERE IS NO CHANGE TO USE, EGRESS, OR OCCUPANCY
M01095984-S2
06/30/2025
Signed off — Alteration
M00995153-I1
06/25/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/16/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/06/2025
Special inspection requirement — Sprinkler Systems
ALEXIS SCHLESSINGERMAN
05/06/2025
Special inspection requirement — Post-installed Anchors
ALEXIS SCHLESSINGERMAN
05/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEXIS SCHLESSINGERMAN
05/02/2025
Filed — Alteration
FILING HEREWITH FOR THE MODIFICATIONS OF WET SPRINKLER COVERAGE ON THE 7TH FLOOR. THERE IS NO CHANGE TO USE, EGRESS, OR OCCUPANCY
M01095984-P1
05/01/2025
Signed off — Alteration
Industrial rope access as per plans filed herewith.
M01044979-S1
05/01/2025
Special inspection requirement — Post-installed Anchors
ALEXIS SCHLESSINGERMAN
05/01/2025
Special inspection requirement — Sprinkler Systems
ALEXIS SCHLESSINGERMAN
05/01/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEXIS SCHLESSINGERMAN
04/25/2025
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
04/07/2025
Permit issued — Sprinklers
M01095984-S4-EW-SP
04/03/2025
Filed — Alteration
FILING HEREWITH FOR THE MODIFICATIONS OF WET SPRINKLER COVERAGE ON THE 7TH FLOOR. THERE IS NO CHANGE TO USE, EGRESS, OR OCCUPANCY
M01095984-S4
01/29/2025
Permit issued — General Construction
M01095984-I1-GC
01/22/2025
Permit issued — Mechanical Systems
M01095984-S2-MS
01/08/2025
Objection resolved — Addressed
01/02/2025
Objection resolved — Addressed
12/31/2024
Objection raised — Admin
12/31/2024
Objection raised — Other
12/20/2024
Filed — Alteration
FILING HEREWITH FOR THE MODIFICATIONS OF WET SPRINKLER COVERAGE ON THE 7TH FLOOR. THERE IS NO CHANGE TO USE, EGRESS, OR OCCUPANCY
M01095984-S2
12/17/2024
Filed — Alteration
FILING HEREWITH FOR THE MODIFICATIONS OF WET SPRINKLER COVERAGE ON THE 7TH FLOOR. THERE IS NO CHANGE TO USE, EGRESS, OR OCCUPANCY
M01095984-I1
12/17/2024
Special inspection requirement — HVAC-R and service water heating system controls
ALEXIS SCHLESSINGERMAN
12/17/2024
Special inspection requirement — HVAC-R and service water heating equipment
ALEXIS SCHLESSINGERMAN
12/17/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
ALEXIS SCHLESSINGERMAN
12/17/2024
Special inspection requirement — Post-installed Anchors
ALEXIS SCHLESSINGERMAN
10/31/2024
Special inspection requirement — Final
ALEXIS SCHLESSINGERMAN
10/31/2024
Special inspection requirement — Mechanical Systems
ALEXIS SCHLESSINGERMAN
08/15/2024
Cycle 9 facade report signed — SWARMP
08/14/2024
Special inspection requirement — Final
ALEXIS SCHLESSINGERMAN
07/22/2024
Cycle 9 facade report submitted
06/27/2024
Cycle 9 facade inspection completed
06/17/2024
Filed — Alteration
M01035045-I1
05/23/2024
Special inspection requirement — Masonry
05/07/2024
Permit issued — Suspended Scaffold
M01044979-S1-SC
05/06/2024
Filed — Alteration
Industrial rope access as per plans filed herewith.
M01044979-I1
05/06/2024
Filed — Alteration
Industrial rope access as per plans filed herewith.
M01044979-S1
05/06/2024
Permit issued — Suspended Scaffold
M01044979-I1-SC
04/12/2024
Special inspection requirement — Final
Albert Mayas
03/11/2024
Permit issued — General Construction
M01010608-I1-GC
03/07/2024
Filed — Alteration
M01010608-I1
02/26/2024
Special inspection requirement — Final
Hamidreza Saghari
02/22/2024
Violation issued (ECB, open)
Construction
02/21/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/19/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 155 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offINTEGRATED HVAC SYS SVC01/16/2026
DOB NOWSuspended ScaffoldSigned-offJC SANTANA CONTRACTING CO08/05/2025
DOB NOWSprinklersSigned-offGALICJA PLBG AND HTG CORP04/07/2025
DOB NOWGeneral ConstructionSigned-offAUDIO STRUCTURES INC01/29/2025
DOB NOWMechanical SystemsSigned-offAUDIO STRUCTURES INC01/22/2025
DOB NOWSuspended ScaffoldSigned-offJC SANTANA CONTRACTING CO05/07/2024
DOB NOWSuspended ScaffoldSigned-offJC SANTANA CONTRACTING CO05/06/2024
DOB NOWGeneral ConstructionPermit IssuedRAPID RUBBISH LLC03/11/2024
DOB NOWSidewalk ShedSigned-offCS BRIDGE CORP01/30/2024
DOB NOWGeneral ConstructionSigned-offBROOKLYN INTERIORS07/26/2022
DOB NOWSprinklersPermit IssuedH M SPRINKLER INC02/24/2021
DOB NOWMechanical SystemsPermit IssuedGC STERLING CONTRACTORS L11/21/2019
BISOTISSUEDBERNHARDT RENOVATION INC06/26/2019
BISSPISSUEDMETRO INCORPORATED03/25/2019
BISSPISSUEDVIP FIRE SPRINKLER INC10/04/2018
BISMHISSUEDGC STERLING CONTRACTORS L07/31/2018
BISSPISSUEDSTANDARD FIRE SUPP CORP07/27/2018
BISPLISSUEDDNA PLUMBING CONTR. INC07/19/2018
BISOTISSUEDGC STERLING CONTRACTORS L07/18/2018
BISOTISSUEDGC STERLING CONTRACTORS L07/11/2018
BISOTISSUEDTRULINE CONSTRUCTION SERV06/26/2018
BISMHISSUEDTRULINE CONSTRUCTION SERV06/26/2018
BISPLISSUEDDELL MECHANICAL CORP02/20/2018
BISOTISSUEDBERNHARDT RENOVATION INC11/08/2017
BISMHISSUEDBERNHARDT RENOVATION INC09/21/2017
BISOTISSUEDRISE CONSTRUCTION SOLUTIO07/14/2017
BISPLISSUEDORBIT PLBG & HTG INC06/29/2017
BISOTISSUEDBERNHARDT RENOVATION INC06/27/2017
BISSPISSUEDADVANCED PLBG, MECH & SPR04/20/2017
BISPLISSUEDADVANCED PLUMBING MECH01/13/2017
BISOTISSUEDNORTHEAST CONTRACTING GP01/03/2017
BISMHISSUEDNORTHEAST CONTRACTING GP01/03/2017
BISMHISSUEDNORTHEAST CONTRACTING GP12/21/2016
BISOTISSUEDNORTHEAST CONTRACTING GP12/21/2016
BISMHISSUEDWHITE LEAF MECHANICAL COR11/01/2016
BISOTISSUEDRISE CONSTRUCTION SOLUTIO09/30/2016
BISOTISSUEDPTU CONSTRUCTION INC08/25/2016
BISMHISSUEDEASTERN AIR INC05/24/2016
BISSPISSUEDPLUMBING & HTG DOCTOR INC05/13/2016
BISPLISSUEDPLUMBING & HTG DOCTOR INC05/13/2016
+ 22 more permits on file
1 project · most recent 08/07/2019
Air Conditioning Systems Heating Systems
FiledStatusContractorScope
08/07/2019Permit IssuedGC STERLING CONTRACTORS LAir Conditioning Systems, Heating Systems
1 project · most recent 02/18/2022
FiledStatusContractorScope
02/18/2022Permit IssuedKG SPRINKLER CORP42 heads
1 project · most recent 02/18/2022
Water/Sanitary
FiledStatusContractorScope
02/18/2022——Water/Sanitary
7 projects · most recent 04/15/2025
General Wiring Lighting
FiledStatusContractorScope
04/15/2025CompleteAL-LECTRIC ELECT'L CONTRGGeneral Wiring
01/23/2024CompleteNASH ELECTRIC SERVICES IN—
02/08/2021CompleteAL-LECTRIC ELECT'L CONTRGGeneral Wiring
09/13/2019CancelledE & M ELECTRICAL NY CORPGeneral Wiring
03/15/2019Permit IssuedWCK ELECTRIC CORP.General Wiring
07/16/2018CompleteABBEY ELECTRIC INCGeneral Wiring, Lighting
07/11/2018CompleteALLSTATE ELEC'L CONT INCGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
07/08/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/25/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/16/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/25/2025Certified Sprinkler - SP - RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 49
DateRequirementInspectorRole
11/14/2025FinalVincent Liottaprogress
11/14/2025Mechanical SystemsVincent Liottaspecial
11/14/2025HVAC-R and service water piping design and insulationVincent Liottaenergy_progress
11/14/2025Maintenance informationVincent Liottaenergy_progress
11/14/2025HVAC-R and service water heating equipmentVincent Liottaenergy_progress
11/14/2025HVAC-R and service water heating system controlsVincent Liottaenergy_progress
05/06/2025Sprinkler SystemsALEXIS SCHLESSINGERMANspecial
05/06/2025Post-installed AnchorsALEXIS SCHLESSINGERMANspecial
05/06/2025Fire-Resistant Penetrations and JointsALEXIS SCHLESSINGERMANspecial
05/01/2025Post-installed AnchorsALEXIS SCHLESSINGERMANspecial
05/01/2025Sprinkler SystemsALEXIS SCHLESSINGERMANspecial
05/01/2025Fire-Resistant Penetrations and JointsALEXIS SCHLESSINGERMANspecial
12/17/2024HVAC-R and service water heating system controlsALEXIS SCHLESSINGERMANenergy_progress
12/17/2024HVAC-R and service water heating equipmentALEXIS SCHLESSINGERMANenergy_progress
12/17/2024HVAC-R and service water piping design and insulationALEXIS SCHLESSINGERMANenergy_progress
12/17/2024Post-installed AnchorsALEXIS SCHLESSINGERMANspecial
10/31/2024FinalALEXIS SCHLESSINGERMANprogress
10/31/2024Mechanical SystemsALEXIS SCHLESSINGERMANspecial
08/14/2024FinalALEXIS SCHLESSINGERMANprogress
05/23/2024Masonry—special
04/12/2024FinalAlbert Mayasprogress
02/26/2024FinalHamidreza Saghariprogress
06/28/2022Fire-Resistant Penetrations and JointsGIORGI KHARDZEISHVILIspecial
06/28/2022FinalMARC PICCIOTTOprogress
02/18/2022HVAC and service water heating equipmentDave Wallenergy_progress
Latest 25 of 49.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Gloss StudiosOfficeFloor 8
Project M00195997 Alteration · Permit Entire · 08/07/2019
Project M00195747 Alteration · Permit Issued · 08/06/2019
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 1,271 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch11
09/02/2026M00766046-I1Request digital key ↗
08/28/2026M00995153-I1Request digital key ↗
08/27/2026M01010608-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/05/2026M00195997-I1Request digital key ↗
08/15/2026M00195997-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/02/2026M00195747-I1Request digital key ↗
08/15/2026M00195747-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler2
09/02/2026M00195747-I1Request digital key ↗
08/15/2026M00195747-P1Request digital key ↗
▸Applications & Permits240
▸BISPLAN / WORK APPROVAL APPLICATION143
12/10/2025122421780Open ↗
08/15/2024120506719Open ↗
08/15/2024122421780Open ↗
Showing 3 of 143 on file for this type
▸BISWORK PERMIT APPLICATION94
10/02/2020140766017Open ↗
09/25/2020140766017Open ↗
08/22/2019123776440Open ↗
Showing 3 of 94 on file for this type
▸BISAFTER-HOUR WORK PERMIT APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications258
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION145
08/09/2019123776440Open ↗
07/12/2019123776440Open ↗
05/17/2019122746314Open ↗
Showing 3 of 145 on file for this type
▸DOB NOWProgress Inspector Seal & Signature30
09/23/2026M01095984-I1Open ↗
09/02/2026M01319273-I1Open ↗
09/02/2026M01319273-I1Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature19
09/02/2026M01319273-I1Open ↗
08/29/2026M01095984-P1Open ↗
08/26/2026M01095984-S2Open ↗
Showing 3 of 19 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature15
09/02/2026M00195747-I1Open ↗
08/28/2026M00995153-I1Open ↗
08/27/2026M01010608-I1Open ↗
Showing 3 of 15 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISPC FULL REPORT9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISAPPLICANT OWNER SIGNATURE6
05/21/2019140849303Open ↗
06/25/2018140765740Open ↗
Showing 2 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment124
▸BISSELF-CERT PLUMBING NOTICE26
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 26 on file for this type
▸BISSCHEDULE B - PLUMBING25
05/21/2019140849303Open ↗
07/13/2018140766017Open ↗
07/10/2018140766017Open ↗
Showing 3 of 25 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE20
12/16/2019123411913Open ↗
12/16/2019123411913Open ↗
10/03/2018123411913Open ↗
Showing 3 of 20 on file for this type
▸BISEQUIPMENT USE PERMITS17
07/22/2021140765740Open ↗
12/07/2020140765740Open ↗
07/18/2020123411913Open ↗
Showing 3 of 17 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA16
11/13/2020123412431Open ↗
12/20/2018123176259Open ↗
11/19/2018123176259Open ↗
Showing 3 of 16 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT13
07/22/2021140765740Open ↗
12/07/2020140765740Open ↗
04/12/2019123411913Open ↗
Showing 3 of 13 on file for this type
▸BISSPRINKLER INSP REPORT : FP-855
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSPRINKLER/STANDPIPE ELECTRICAL LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSIGN HANGER CERTIFICATE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection5
▸BISTenant Protection Plan and Notes3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSTREET TREE CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Environmental & Asbestos79
▸BISASBESTOS: CERTIFICATION (DEP ACP5)39
07/12/2019123776440Open ↗
05/21/2019140849303Open ↗
07/17/2018140766017Open ↗
Showing 3 of 39 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'24
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 24 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
09/02/2026M00195747-I1Open ↗
08/27/2026M01010608-I1Open ↗
08/23/2026M01095984-P1Open ↗
Showing 3 of 12 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance107
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS56
07/12/2019123776440Open ↗
05/17/2019122746314Open ↗
05/17/2019122746314Open ↗
Showing 3 of 56 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS27
07/15/2021140765740Open ↗
10/27/2020123776440Open ↗
09/16/2020140766017Open ↗
Showing 3 of 27 on file for this type
▸BISTR8: Energy Code Progress Inspections10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY8
07/15/2021140765740Open ↗
10/27/2020123776440Open ↗
09/16/2020123028151Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports26
▸BISTECHNICAL REPORT: RESPONSIBILITY22
06/10/2022110008777Open ↗
06/10/2022110008777Open ↗
05/30/2022110008777Open ↗
Showing 3 of 22 on file for this type
▸BISTECHNICAL REPORT: PILE DRIVING2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BIS2008 TR1 REQUIRED FOR NEW/WAIVED INSPECTIONS1
03/22/2022100102014Open ↗
▸Approvals, Objections & Sign-offs134
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST83
10/16/2025120561294Open ↗
09/11/2025123016440Open ↗
12/30/2022122374484Open ↗
Showing 3 of 83 on file for this type
▸BISADMINISTRATIVE OBJECTIONS32
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 32 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE9
04/07/2022103007318Open ↗
04/04/2022103007318Open ↗
03/28/2022103007318Open ↗
Showing 3 of 9 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISSUPERSEDING LETTER3
03/26/2019122686209Open ↗
11/01/2018122686209Open ↗
07/11/2018123028151Open ↗
▸Cost, Insurance & Ownership132
▸BISCOST AFFIDAVIT126
06/14/2022122374484Open ↗
05/26/2022110008777Open ↗
05/24/2022100102014Open ↗
Showing 3 of 126 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW34
10/08/2025120561294Open ↗
09/11/2025123016440Open ↗
07/18/2022122374484Open ↗
Showing 3 of 4 on file for this type
▸BISOK TO ISSUE TCO PENDING RESOLUTION OFOPEN FACADE VIOLATIONS - AFFIDAVIT ATTACHED1
04/22/2025103007318Open ↗
▸BISOK TO ISSUE TCO PENDING RESOLUTION OFOPEN FACADE VIOLATION - AFFIDAVIT ATTACHED1
04/23/2025103007318Open ↗
▸Filing & Intake Forms132
▸BISEFILING COVER SHEET61
07/12/2019123776440Open ↗
Showing 1 of 61 on file for this type
▸BISADDITIONAL INFORMATION40
12/07/2020140765740Open ↗
10/16/2020123776440Open ↗
10/03/2018123411913Open ↗
Showing 3 of 40 on file for this type
▸BISBOROUGH INTAKE FORM24
10/02/2020140766017Open ↗
09/25/2020140766017Open ↗
12/16/2019123411913Open ↗
Showing 3 of 24 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET7
05/21/2019140849303Open ↗
06/25/2018140765740Open ↗
Showing 2 of 7 on file for this type
▸Other Documents15
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION9
06/02/2025120887905Open ↗
01/07/2025103007318Open ↗
Showing 2 of 9 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISMonitoring Report-1 (MR-1)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWIRA Certification1
08/13/2026M01044979-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M01044979-S1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01044979-S1Open ↗