1373 EAST 91 STREET
BROOKLYN · BIN 3429192
💬 Discuss this project
2022Year Built
2Stories
B1Building Class
R4-1Zoning
2,750 sfGross Floor Area
2Units
Two family brick · 3,310 sf lot · 0.83 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralGeneral
Floor 218p · 1 filing · 20 docs
Floor 117p · 1 filing · 20 docs
Cellar19p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1372 E 92 STREET BROOKLYN NY1407/08/2026
1372 GROUP CORP103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/15/2023$1.2M—1372 GROUP CORP. → Private party$444/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SION CONSULTING ENGINEERING PC709/28/2023
AUTOMATED DESIGN ENGINEERING, PLLC110/13/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SION CONSULTING ENGINEERING803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ATOMIC CONTRACTING INCGeneral Contractor907/08/2026
RENEW PLUMBING CORPPlumbing307/08/2026
POWER SURGE ELECTRIC, INCElectrical103/22/2026
RENEW PLUMBING CORPFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SION CONSULTING ENG. PC1108409/28/2023
AUTOMATED DESIGN CONSULTA895110/13/2022
BIG APPLE GROUP NY A RMA9168106/21/2022
Building Lifecycle
All (97)Filed (8)Permit Issued (5)Signed Off (4)Inspection (10)Objection (40)Special Inspection (30)
09/28/2023
Filed — New Building
2 STORY AND CELLAR , 2 FAMILY NEW BUILDING
B00603865-P2
08/09/2023
Signed off — Alteration
INSTALLATION OF 8 FEET WIDE CURB-CUT ON GRADE
B00610905-I1
08/08/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
08/04/2023
Filed — Alteration
INSTALLATION OF 8 FEET WIDE CURB-CUT ON GRADE
B00610905-P1
08/03/2023
Signed off — Alteration
Install sprinkler system per the plans filed herewith and in conjunction with NB#B00603865. The system is hydraulically calculated. There is no change in use occupancy or egress.
B00638842-I1
08/03/2023
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
07/18/2023
Signed off — Alteration
INSTALLATION OF 5 THREE PIECE BATHROOM , 2 KITCHEN SINK , 2 GAS RANGE ,2 DISHWASHER , 2 HOT WATER HEATER , 2 WASHING MACHINE ,2 GAS DRYER , 1 SLOP SINK
B00610926-I1
07/07/2023
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
06/28/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/20/2023
Objection resolved — Addressed
06/20/2023
Objection resolved — Addressed
06/19/2023
Signed off — Alteration
INSTALLATION OF 8' HIGH TEMPORARY CONSTRUCTION FENCE AROUND JOB SITE
B00684032-I1
06/16/2023
Objection raised — Scope
06/16/2023
Objection raised — Scope
06/09/2023
Filed — New Building
2 STORY AND CELLAR , 2 FAMILY NEW BUILDING
B00603865-P1
05/31/2023
Special inspection requirement — Concrete - Cast-In-Place
sion hourizadeh
05/31/2023
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
sion hourizadeh
05/31/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
sion hourizadeh
05/31/2023
Special inspection requirement — Masonry
sion hourizadeh
05/31/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
sion hourizadeh
05/31/2023
Special inspection requirement — Subgrade Inspections
sion hourizadeh
05/31/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Soorjbally Harilall
05/31/2023
Special inspection requirement — Energy Code Compliance Inspections
sion hourizadeh
05/31/2023
Special inspection requirement — Final
sion hourizadeh
05/31/2023
Special inspection requirement — Fire-Resistance Rated Construction
sion hourizadeh
05/31/2023
Special inspection requirement — Footing and Foundation
sion hourizadeh
05/31/2023
Special inspection requirement — Structural Wood Frame
sion hourizadeh
05/31/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
sion hourizadeh
05/31/2023
Special inspection requirement — Insulation placement and R values
sion hourizadeh
05/31/2023
Special inspection requirement — Interior lighting power
sion hourizadeh
05/31/2023
Special inspection requirement — Air barrier - visual inspection
sion hourizadeh
05/31/2023
Special inspection requirement — Fenestration areas
sion hourizadeh
05/31/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
sion hourizadeh
05/31/2023
Special inspection requirement — Lighting controls
sion hourizadeh
05/31/2023
Special inspection requirement — Metering
sion hourizadeh
05/31/2023
Special inspection requirement — Maintenance information
sion hourizadeh
05/31/2023
Special inspection requirement — Electric vehicle service equipment requirements
sion hourizadeh
05/31/2023
Special inspection requirement — Protection of exposed foundation insulation
sion hourizadeh
05/31/2023
Special inspection requirement — Fenestration air leakage
sion hourizadeh
05/31/2023
Special inspection requirement — Permanent certificate
sion hourizadeh
05/10/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/02/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/27/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/27/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
12/14/2022
Permit issued — Sprinklers
B00638842-I1-EW-SP
10/13/2022
Filed — Alteration
Install sprinkler system per the plans filed herewith and in conjunction with NB#B00603865. The system is hydraulically calculated. There is no change in use occupancy or egress.
B00638842-I1
09/29/2022
Permit issued — Curb Cut
B00610905-I1-CC
09/29/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
09/29/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/22/2022
Permit issued — Plumbing
B00610926-I1-PL
07/27/2022
Permit issued — Structural
B00603865-I1-GC-CX
07/21/2022
Objection resolved — Addressed
07/20/2022
Objection raised — Other
07/20/2022
Objection resolved — Addressed
07/13/2022
Permit issued — Construction Fence
B00684032-I1-FN
07/13/2022
Objection resolved — Addressed
07/07/2022
Objection raised — Zoning
07/05/2022
Objection resolved — Addressed
07/05/2022
Objection resolved — Addressed
06/28/2022
Filed — Alteration
INSTALLATION OF 8 FEET WIDE CURB-CUT ON GRADE
B00610905-I1
Latest 60 of 97 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offRENEW PLUMBING CORP12/14/2022
DOB NOWCurb CutSigned-offATOMIC CONTRACTING INC09/29/2022
DOB NOWPlumbingSigned-offRENEW PLUMBING CORP09/22/2022
DOB NOWStructuralPermit IssuedATOMIC CONTRACTING INC07/27/2022
DOB NOWConstruction FenceSigned-offATOMIC CONTRACTING INC07/13/2022
1 project · most recent 07/20/2023
General Wiring
FiledStatusContractorScope
07/20/2023CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
1 project · most recent 09/28/2023
Concrete Masonry Wood
FiledStatusContractorScope
09/28/2023Permit IssuedATOMIC CONTRACTING INCConcrete, Masonry, Wood
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
08/08/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
08/03/2023Fail-Final Curb Cut Non-Directive 14FailView ↗
07/07/2023Pass-Final SP - Up to 3 Requested FloorsPassView ↗
06/28/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/10/2023Pass-Final CND-Occupancy InspectionPassView ↗
03/02/2023Pass-Final CND-Occupancy InspectionPassView ↗
01/27/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/27/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/29/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/29/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
05/31/2023Concrete - Cast-In-Placesion hourizadehspecial
05/31/2023Excavations - Sheeting, Shoring, and Bracingsion hourizadehspecial
05/31/2023Fire-Resistant Penetrations and Jointssion hourizadehspecial
05/31/2023Masonrysion hourizadehspecial
05/31/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationsion hourizadehspecial
05/31/2023Subgrade Inspectionssion hourizadehspecial
05/31/2023Subsurface Investigations (Borings/Test Pits)Soorjbally Harilallspecial
05/31/2023Energy Code Compliance Inspectionssion hourizadehprogress
05/31/2023Finalsion hourizadehprogress
05/31/2023Fire-Resistance Rated Constructionsion hourizadehprogress
05/31/2023Footing and Foundationsion hourizadehprogress
05/31/2023Structural Wood Framesion hourizadehprogress
05/31/2023Fenestration and door U-factor and product ratingssion hourizadehenergy_progress
05/31/2023Insulation placement and R valuession hourizadehenergy_progress
05/31/2023Interior lighting powersion hourizadehenergy_progress
05/31/2023Air barrier - visual inspectionsion hourizadehenergy_progress
05/31/2023Fenestration areassion hourizadehenergy_progress
05/31/2023HVAC-R and service water piping design and insulationsion hourizadehenergy_progress
05/31/2023Lighting controlssion hourizadehenergy_progress
05/31/2023Meteringsion hourizadehenergy_progress
05/31/2023Maintenance informationsion hourizadehenergy_progress
05/31/2023Electric vehicle service equipment requirementssion hourizadehenergy_progress
05/31/2023Protection of exposed foundation insulationsion hourizadehenergy_progress
05/31/2023Fenestration air leakagesion hourizadehenergy_progress
05/31/2023Permanent certificatesion hourizadehenergy_progress
Latest 25 of 33.
▾Documents — 59 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/29/2026B00684032-I1Request digital key ↗
08/29/2026B00610905-I1Request digital key ↗
08/29/2026B00610905-P1Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026B00603865-P1Open ↗
08/13/2026B00603865-P2Open ↗
08/13/2026B00603865-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026B00603865-I1Open ↗
08/13/2026B00603865-P2Open ↗
08/13/2026B00603865-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00603865-I1Open ↗
▸Seals & Professional Certifications18
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/29/2026B00610926-I1Open ↗
08/29/2026B00610905-P1Open ↗
08/29/2026B00610905-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/02/2026B00603865-P1Open ↗
09/02/2026B00603865-P1Open ↗
08/25/2026B00610926-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/02/2026B00603865-P1Open ↗
09/02/2026B00603865-P1Open ↗
09/02/2026B00603865-P1Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026B00603865-P2Open ↗
08/13/2026B00603865-P1Open ↗
08/13/2026B00603865-I1Open ↗
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist3
08/15/2026B00603865-P1Open ↗
08/15/2026B00603865-I1Open ↗
08/13/2026B00603865-P2Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00603865-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B00603865-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00603865-I1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/14/2026B00610926-I1Open ↗
08/13/2026B00603865-I1Open ↗
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT3
08/13/2026B00603865-P2Open ↗
08/13/2026B00603865-P1Open ↗
08/13/2026B00603865-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00603865-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026B00603865-I1Open ↗
▸Other Documents10
▸DOB NOWSite Survey: Initial3
08/13/2026B00603865-I1Open ↗
08/13/2026B00603865-P2Open ↗
08/13/2026B00603865-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026B00603865-P2Open ↗
08/13/2026B00603865-P1Open ↗
08/13/2026B00603865-I1Open ↗
▸DOB NOWProperty Ownership Certification3
08/15/2026B00603865-P1Open ↗
08/15/2026B00603865-I1Open ↗
08/13/2026B00603865-P2Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00603865-I1Open ↗