1375 COLLEGE AVENUE
BRONX · BIN 2007278
💬 Discuss this project
1910Year Built
2Stories
C1Building Class
R7-1Zoning
4,549 sfGross Floor Area
10Units
Rent Stabilized7 Active Violations ▸FDNY Report ↗
Over six families without stores · Owner of record: 1375 SZ · 2,803 sf lot · 1.62 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofProposed interior work2p · 1 filing · 20 docs
Floor 2Proposed interior work59p · 1 filing · 20 docs
Floor 1Proposed interior work57p · 1 filing · 20 docs
BasementProposed interior work61p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1375 SZ103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/29/2023$1.2M—— → —$264/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Adb Associates803/26/2024
Vasilios Artemiou PE111/20/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYC Design File903/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MJH ConstructionGeneral Contractor307/08/2026
Prime Piping & HeatingPlumbing107/08/2026
Prime Piping & HeatingFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF Services5616903/26/2024
Building Lifecycle
All (111)Filed (9)Permit Issued (4)Signed Off (3)Violation (16)Inspection (9)Objection (40)Special Inspection (30)
05/04/2025
Violation issued (HPD, open)
C
05/04/2025
Violation issued (HPD, closed)
A
05/04/2025
Violation issued (HPD, closed)
A
05/04/2025
Violation issued (HPD, closed)
A
05/04/2025
Violation issued (HPD, closed)
A
05/04/2025
Violation issued (HPD, closed)
A
05/04/2025
Violation issued (HPD, closed)
A
04/11/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
04/11/2024
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
04/11/2024
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
04/11/2024
Special inspection requirement — Metering
FAHAD FATEH
04/11/2024
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
04/11/2024
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
04/11/2024
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
FAHAD FATEH
04/11/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
04/11/2024
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
04/11/2024
Special inspection requirement — Permanent certificate
FAHAD FATEH
04/11/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
04/11/2024
Special inspection requirement — Fenestration areas
FAHAD FATEH
04/11/2024
Special inspection requirement — Maintenance information
FAHAD FATEH
04/11/2024
Special inspection requirement — Interior lighting power
FAHAD FATEH
04/08/2024
Objection resolved — Addressed
04/02/2024
Signed off — Alteration CO
Filing to install a new plumbing system subsequent to primary approved application X00947311-I1
X00947311-S2
03/29/2024
Objection raised — Other
03/26/2024
Filed — Alteration CO
Filing to install a new plumbing system subsequent to primary approved application X00947311-I1
X00947311-P4
03/25/2024
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
03/25/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
03/25/2024
Special inspection requirement — Permanent certificate
FAHAD FATEH
03/25/2024
Special inspection requirement — Maintenance information
FAHAD FATEH
03/25/2024
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
03/25/2024
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
03/25/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
03/21/2024
Filed — Alteration CO
Filing to install a new plumbing system subsequent to primary approved application X00947311-I1
X00947311-P5
03/21/2024
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
03/21/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
03/21/2024
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
03/21/2024
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
03/21/2024
Special inspection requirement — Maintenance information
FAHAD FATEH
03/21/2024
Special inspection requirement — Permanent certificate
FAHAD FATEH
03/21/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
03/18/2024
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
03/18/2024
Special inspection requirement — Interior lighting power
FAHAD FATEH
02/28/2024
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
02/28/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/26/2024
Signed off — Alteration CO
Filing to install a new plumbing system subsequent to primary approved application X00947311-I1
X00947311-S1
02/26/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
02/21/2024
Signed off — Alteration CO
Filing to install a new plumbing system subsequent to primary approved application X00947311-I1
X00947311-S3
02/20/2024
Filed — Alteration CO
Filing to install a new plumbing system subsequent to primary approved application X00947311-I1
X00947311-P3
02/20/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/19/2024
Filed — Alteration CO
Filing to install a new plumbing system subsequent to primary approved application X00947311-I1
X00947311-P2
02/15/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/13/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/12/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
01/02/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/26/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/20/2023
Permit issued — Sprinklers
X00947311-S3-EW-SP
12/19/2023
Permit issued — Plumbing
X00947311-S2-PL
12/19/2023
Permit issued — Mechanical Systems
X00947311-S1-MS
12/06/2023
Permit issued — General Construction
X00947311-I1-GC
12/03/2023
Filed — Alteration CO
Filing to install a new plumbing system subsequent to primary approved application X00947311-I1
X00947311-P1
Latest 60 of 111 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offAmb Mechanical12/20/2023
DOB NOWPlumbingSigned-offPrime Piping & Heating12/19/2023
DOB NOWMechanical SystemsSigned-offMJH Construction12/19/2023
DOB NOWGeneral ConstructionPermit IssuedMJH Construction12/06/2023
1 project · most recent 03/26/2024
Associated Ducts and Piping Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/26/2024Signed-offMJH ConstructionAssociated Ducts and Piping, Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin RXB12BXVJU 156,100 BTU · Condensing Unit ×14
4MXS36WMVJU9 216,000 BTU · Heat Pump Outdoor ×6
Ventilation
Nutone AEN110 50 CFM · Exhaust Fan ×20
QTXEN150 100 CFM · Exhaust Fan ×20
Ducts & Piping
Masterflow MASTERFLOW 10 BTU ×4
1 project · most recent 03/26/2024
Sprinkler System
FiledStatusContractorScope
03/26/2024Signed-offPrime Piping & HeatingSprinkler System
1 project · most recent 03/26/2024
Storm Water/Sanitary
FiledStatusContractorScope
03/26/2024Signed-offAmb MechanicalStorm, Water/Sanitary
1 project · most recent 02/28/2024
General Wiring
FiledStatusContractorScope
02/28/2024CompleteS&R Electrical & MechanicalGeneral Wiring
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
02/28/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
02/28/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/26/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
02/20/2024Pass-Final CND-Occupancy InspectionPassView ↗
02/15/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/13/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/12/2024Fail-Final CND-Occupancy InspectionFailView ↗
01/02/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/26/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 52
DateRequirementInspectorRole
04/11/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
04/11/2024Insulation placement and R valuesFAHAD FATEHenergy_progress
04/11/2024Air barrier - visual inspectionFAHAD FATEHenergy_progress
04/11/2024MeteringFAHAD FATEHenergy_progress
04/11/2024Energy Code Compliance InspectionsFAHAD FATEHprogress
04/11/2024Fire-Resistance Rated ConstructionFAHAD FATEHprogress
04/11/2024Exterior Insulation and Finish Systems (EIFS)FAHAD FATEHspecial
04/11/2024Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
04/11/2024Fenestration air leakageFAHAD FATEHenergy_progress
04/11/2024Permanent certificateFAHAD FATEHenergy_progress
04/11/2024Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
04/11/2024Fenestration areasFAHAD FATEHenergy_progress
04/11/2024Maintenance informationFAHAD FATEHenergy_progress
04/11/2024Interior lighting powerFAHAD FATEHenergy_progress
03/25/2024HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
03/25/2024HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
03/25/2024Permanent certificateFAHAD FATEHenergy_progress
03/25/2024Maintenance informationFAHAD FATEHenergy_progress
03/25/2024HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
03/25/2024Energy Code Compliance InspectionsFAHAD FATEHprogress
03/25/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
03/21/2024HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
03/21/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
03/21/2024Energy Code Compliance InspectionsFAHAD FATEHprogress
03/21/2024HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
Latest 25 of 52.
▾Documents — 72 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/22/2026X00947311-S1Request digital key ↗
08/22/2026X00947311-P5Request digital key ↗
08/22/2026X00947311-P4Request digital key ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications45
▸DOB NOWProgress Inspector Seal & Signature24
09/01/2026X00947311-S2Open ↗
09/01/2026X00947311-S2Open ↗
09/01/2026X00947311-S2Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/01/2026X00947311-S2Open ↗
08/31/2026X00947311-I1Open ↗
08/31/2026X00947311-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/22/2026X00947311-P5Open ↗
08/22/2026X00947311-P4Open ↗
08/22/2026X00947311-P3Open ↗
Showing 3 of 9 on file for this type
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist3
08/22/2026X00947311-P4Open ↗
08/22/2026X00947311-P1Open ↗
08/15/2026X00947311-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026X00947311-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026X00947311-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026X00947311-I1Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/22/2026X00947311-P5Open ↗
08/22/2026X00947311-P4Open ↗
08/22/2026X00947311-P3Open ↗
Showing 3 of 9 on file for this type
▸Other Documents3
▸DOB NOWProperty Ownership Certification3
08/22/2026X00947311-P4Open ↗
08/22/2026X00947311-P1Open ↗
08/15/2026X00947311-I1Open ↗