← Back
Two family brick
1376 EAST 92 STREET
BROOKLYN · Canarsie · BIN 3429183
💬 Discuss this project
2022Year Built
2Stories
B1Building Class
R4-1Zoning
2,312 sfGross Floor Area
2Units
2 Open Violations ▸FDNY Report ↗
Two family brick · Owner of record: CANARSIE HEIGHTS #3 LLC · 2,864 sf lot · 0.81 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralPlumbingCivilGeneral
Floor 211p · 3 filings · 20 docs
Floor 113p · 4 filings · 20 docs
Cellar13p · 3 filings · 20 docs
Site & exterior3p · 2 filings · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1372 E 92 STREET BROOKLYN NY1607/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/07/2023$1.1M—1372 GROUP CORP. → Private party$497/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SION CONSULTING ENGINEERING PC908/04/2023
AUTOMATED DESIGN ENGINEERING, PLLC110/13/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SION CONSULTING ENGINEERING1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ATOMIC CONTRACTING INCGeneral Contractor1107/08/2026
RENEW PLUMBING CORPPlumbing407/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SION CONSULTING ENG. PC1108607/10/2023
BIG APPLE GROUP NY A RMA9168211/15/2022
Building Lifecycle
All (87)Filed (10)Permit Issued (5)Signed Off (4)Violation (1)Inspection (11)Objection (26)Special Inspection (30)
11/25/2025
Violation issued (HPD, open)
I
12/29/2023
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
08/16/2023
Signed off — Alteration
THIS APPLICATION IS FILED TO ADD A NEW 10' PAIRED CURB CUT. RELATED JOB NUMBERS ARE # B00603844, # B00602500 AND # B00613610
B00676366-I1
08/15/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
08/08/2023
Objection raised — Admin
08/08/2023
Objection resolved — Addressed
08/04/2023
Filed — Alteration
THIS APPLICATION IS FILED TO ADD A NEW 10' PAIRED CURB CUT. RELATED JOB NUMBERS ARE # B00603844, # B00602500 AND # B00613610
B00676366-P1
08/03/2023
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
08/02/2023
Signed off — Alteration
Install 30 or less sprinkler heads in conjunction with NB B00603???. The system is hydraulically calculated. There is no change in use occupancy or egress.
B00730547-I1
07/31/2023
Signed off — Alteration
THIS APPLICATION IS BEING FILED FOR A TEMPORARY FENCE
B00712570-I1
07/28/2023
Signed off — Alteration
INSTALLATION OF 5 THREE PIECE BATHROOM, 2 KITCHEN SINK , 2 DISHWASHER , 2 GAS RANGE , 2 HOT WATER HEATER, WASHING MACHNE , 2 DRYER, 1 SLOP SINKI
B00611235-I1
07/21/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
sion hourizadeh
07/21/2023
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
sion hourizadeh
07/21/2023
Special inspection requirement — Structural Cold-Formed Steel
sion hourizadeh
07/21/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Soorjbally Harilall
07/21/2023
Special inspection requirement — Concrete - Cast-In-Place
sion hourizadeh
07/21/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
sion hourizadeh
07/21/2023
Special inspection requirement — Subgrade Inspections
sion hourizadeh
07/21/2023
Special inspection requirement — Structural Wood Frame
sion hourizadeh
07/21/2023
Special inspection requirement — Energy Code Compliance Inspections
sion hourizadeh
07/21/2023
Special inspection requirement — Fire-Resistance Rated Construction
sion hourizadeh
07/21/2023
Special inspection requirement — Final
sion hourizadeh
07/21/2023
Special inspection requirement — Footing and Foundation
sion hourizadeh
07/21/2023
Special inspection requirement — Permanent certificate
sion hourizadeh
07/21/2023
Special inspection requirement — Maintenance information
sion hourizadeh
07/21/2023
Special inspection requirement — Interior lighting power
sion hourizadeh
07/21/2023
Special inspection requirement — Insulation placement and R values
sion hourizadeh
07/21/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
sion hourizadeh
07/21/2023
Special inspection requirement — Electric vehicle service equipment requirements
sion hourizadeh
07/21/2023
Special inspection requirement — Fenestration air leakage
sion hourizadeh
07/21/2023
Special inspection requirement — Metering
sion hourizadeh
07/21/2023
Special inspection requirement — Air barrier - visual inspection
sion hourizadeh
07/21/2023
Special inspection requirement — Fenestration areas
sion hourizadeh
07/19/2023
Objection resolved — Addressed
07/14/2023
Objection raised — Zoning
07/14/2023
Objection raised — Scope
07/14/2023
Objection resolved — Addressed
07/12/2023
Inspection — Certified Sprinkler (PL)-SP-Fixtures (PL)-Finish
Certified
View inspection ↗
07/10/2023
Filed — New Building
2 STORY AND CELLAR 2 FAMILY NEW BUILDING
B00602500-P3
07/09/2023
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
06/28/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/23/2023
Objection resolved — Addressed
06/23/2023
Objection resolved — Addressed
06/15/2023
Objection resolved — Addressed
06/14/2023
Objection raised — Zoning
06/14/2023
Objection raised — Zoning
06/14/2023
Objection raised — Scope
06/08/2023
Filed — New Building
2 STORY AND CELLAR 2 FAMILY NEW BUILDING
B00602500-P2
02/24/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/14/2022
Permit issued — Plumbing
B00730547-I1-PL
12/01/2022
Special inspection requirement — Maintenance information
sion hourizadeh
12/01/2022
Special inspection requirement — On-Site Private Sewage Disposal Systems Installation
sion hourizadeh
12/01/2022
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
SOORJBALLY HARILALL
12/01/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
sion hourizadeh
12/01/2022
Special inspection requirement — Energy Code Compliance Inspections
sion hourizadeh
12/01/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
sion hourizadeh
12/01/2022
Special inspection requirement — Permanent certificate
sion hourizadeh
12/01/2022
Special inspection requirement — Metering
sion hourizadeh
11/30/2022
Objection resolved — Addressed
11/15/2022
Filed — Alteration
INSTALLATION OF 5 THREE PIECE BATHROOM, 2 KITCHEN SINK , 2 DISHWASHER , 2 GAS RANGE , 2 HOT WATER HEATER, WASHING MACHNE , 2 DRYER, 1 SLOP SINKI
B00611235-P1
Latest 60 of 87 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offRENEW PLUMBING CORP12/14/2022
DOB NOWCurb CutSigned-offATOMIC CONTRACTING INC09/29/2022
DOB NOWPlumbingSigned-offRENEW PLUMBING CORP09/20/2022
DOB NOWConstruction FenceSigned-offATOMIC CONTRACTING INC07/13/2022
DOB NOWFoundationPermit IssuedATOMIC CONTRACTING INC07/12/2022
1 project · most recent 07/20/2023
General Wiring
FiledStatusContractorScope
07/20/2023CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
1 project · most recent 07/10/2023
Concrete Wood
FiledStatusContractorScope
07/10/2023Permit IssuedATOMIC CONTRACTING INCConcrete, Wood
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
12/29/2023Fail-Final CND-Occupancy InspectionFailView ↗
08/15/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
08/03/2023Fail-Final Curb Cut Non-Directive 14FailView ↗
07/12/2023Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
07/09/2023Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
06/28/2023Pass-Final CND-Occupancy InspectionPassView ↗
02/24/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/28/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/28/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/25/2022Pass-Final CND-Occupancy InspectionPassView ↗
07/20/2022Fail-Final CND-Occupancy InspectionFailView ↗
▾Special Inspection Requirements (DOB NOW) — 60
DateRequirementInspectorRole
07/21/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationsion hourizadehspecial
07/21/2023Excavations - Sheeting, Shoring, and Bracingsion hourizadehspecial
07/21/2023Structural Cold-Formed Steelsion hourizadehspecial
07/21/2023Subsurface Investigations (Borings/Test Pits)Soorjbally Harilallspecial
07/21/2023Concrete - Cast-In-Placesion hourizadehspecial
07/21/2023Fire-Resistant Penetrations and Jointssion hourizadehspecial
07/21/2023Subgrade Inspectionssion hourizadehspecial
07/21/2023Structural Wood Framesion hourizadehprogress
07/21/2023Energy Code Compliance Inspectionssion hourizadehprogress
07/21/2023Fire-Resistance Rated Constructionsion hourizadehprogress
07/21/2023Finalsion hourizadehprogress
07/21/2023Footing and Foundationsion hourizadehprogress
07/21/2023Permanent certificatesion hourizadehenergy_progress
07/21/2023Maintenance informationsion hourizadehenergy_progress
07/21/2023Interior lighting powersion hourizadehenergy_progress
07/21/2023Insulation placement and R valuession hourizadehenergy_progress
07/21/2023HVAC-R and service water piping design and insulationsion hourizadehenergy_progress
07/21/2023Electric vehicle service equipment requirementssion hourizadehenergy_progress
07/21/2023Fenestration air leakagesion hourizadehenergy_progress
07/21/2023Meteringsion hourizadehenergy_progress
07/21/2023Air barrier - visual inspectionsion hourizadehenergy_progress
07/21/2023Fenestration areassion hourizadehenergy_progress
12/01/2022Maintenance informationsion hourizadehenergy_progress
12/01/2022On-Site Private Sewage Disposal Systems Installationsion hourizadehspecial
12/01/2022Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesSOORJBALLY HARILALLspecial
Latest 25 of 60.
▾Documents — 81 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/29/2026B00611235-P1Request digital key ↗
08/28/2026B00730547-I1Request digital key ↗
08/27/2026B00602500-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸Zoning, Tax Lot & Property Records13
▸DOB NOWZD1: DOB Zoning Diagram4
08/13/2026B00602500-P3Open ↗
08/13/2026B00602500-P1Open ↗
08/13/2026B00602500-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)4
08/13/2026B00602500-P3Open ↗
08/13/2026B00602500-P2Open ↗
08/13/2026B00602500-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWRestrictive Declaration/Easement 14
08/13/2026B00602500-I1Open ↗
08/13/2026B00602500-P3Open ↗
08/13/2026B00602500-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00602500-I1Open ↗
▸Seals & Professional Certifications26
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/29/2026B00611235-I1Open ↗
08/29/2026B00611235-P1Open ↗
08/27/2026B00602500-P2Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/29/2026B00602500-I1Open ↗
09/29/2026B00602500-I1Open ↗
08/29/2026B00611235-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/29/2026B00602500-I1Open ↗
09/29/2026B00602500-I1Open ↗
08/29/2026B00611235-I1Open ↗
Showing 3 of 8 on file for this type
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/13/2026B00602500-P3Open ↗
08/13/2026B00602500-P2Open ↗
08/13/2026B00602500-P1Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection7
▸DOB NOWStreet Tree Checklist4
08/27/2026B00602500-I1Open ↗
08/14/2026B00602500-P2Open ↗
08/14/2026B00602500-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWStreet Tree Sign Off1
08/13/2026B00602500-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00602500-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00602500-I1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/15/2026B00611235-I1Open ↗
08/13/2026B00602500-I1Open ↗
▸Inspections & Test Reports6
▸DOB NOWSOIL REPORT4
08/13/2026B00602500-P1Open ↗
08/13/2026B00602500-P2Open ↗
08/13/2026B00602500-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00602500-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026B00602500-I1Open ↗
▸Other Documents13
▸DOB NOWSite Survey: Initial4
08/13/2026B00602500-P3Open ↗
08/13/2026B00602500-P2Open ↗
08/13/2026B00602500-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026B00602500-P2Open ↗
08/13/2026B00602500-P3Open ↗
08/13/2026B00602500-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/27/2026B00602500-I1Open ↗
08/14/2026B00602500-P2Open ↗
08/14/2026B00602500-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFinal Survey1
08/13/2026B00602500-I1Open ↗