← Back
Building
138-16 243 STREET
BIN 4625942
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Locations of Work
Architecture
Cellar1p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MEDALLION CONSTRUCTION804/09/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JAHMAL SABAHA PE CONSULTING ENGR301/27/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KMS DRAFTING603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AXENNT LLCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TRIANGLE INSPECTION & TES7495110/21/2025
Building Lifecycle
All (45)Filed (3)Permit Issued (1)Signed Off (1)Objection (10)Special Inspection (30)
06/05/2026
Signed off — Full Demolition
PROPOSE FULL DEMOLITION OF TWO STORY, ONE FAMILY FRAME BUILDING WITH CELLAR AND ATTIC LEVEL.
Q01288370-I1
04/16/2026
Objection resolved — Resolved
04/16/2026
Objection resolved — Resolved
04/10/2026
Objection resolved — Resolved
04/10/2026
Objection resolved — Resolved
04/10/2026
Objection resolved — Resolved
03/19/2026
Permit issued — Full Demolition
Q01288370-I1-FD
03/10/2026
Objection raised — Scope
03/10/2026
Objection raised — Inspections
02/12/2026
Objection raised — Admin
02/12/2026
Objection raised — Scope
02/12/2026
Objection raised — Structural
01/27/2026
Filed — New Building
Propose two story framed building as per plans. Obtain certificate of occupancy for one family dwelling.
Q01342340-S1
01/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
01/26/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
01/26/2026
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
01/26/2026
Special inspection requirement — Energy Code Compliance Inspections
01/26/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
01/26/2026
Special inspection requirement — HVAC-R and service water heating equipment
01/26/2026
Special inspection requirement — Maintenance information
01/26/2026
Special inspection requirement — HVAC-R and service water heating system controls
01/26/2026
Special inspection requirement — Permanent certificate
01/09/2026
Filed — New Building
Propose two story framed building as per plans. Obtain certificate of occupancy for one family dwelling.
Q01342340-I1
01/05/2026
Special inspection requirement — Energy Code Compliance Inspections
01/05/2026
Special inspection requirement — Fire-Resistance Rated Construction
01/05/2026
Special inspection requirement — Structural Wood Frame
01/05/2026
Special inspection requirement — Electric vehicle service equipment requirements
01/05/2026
Special inspection requirement — Metering
01/05/2026
Special inspection requirement — Fenestration air leakage
01/05/2026
Special inspection requirement — Permanent certificate
01/05/2026
Special inspection requirement — Insulation placement and R values
01/05/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
01/05/2026
Special inspection requirement — Protection of exposed foundation insulation
01/05/2026
Special inspection requirement — Fenestration areas
01/05/2026
Special inspection requirement — Interior lighting power
01/05/2026
Special inspection requirement — Air barrier — testing
01/05/2026
Special inspection requirement — Air barrier - visual inspection
01/05/2026
Special inspection requirement — Concrete - Cast-In-Place
01/05/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
01/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
01/05/2026
Special inspection requirement — Masonry
01/05/2026
Special inspection requirement — Maintenance information
01/05/2026
Special inspection requirement — Subgrade Inspections
01/05/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
10/21/2025
Filed — Full Demolition
PROPOSE FULL DEMOLITION OF TWO STORY, ONE FAMILY FRAME BUILDING WITH CELLAR AND ATTIC LEVEL.
Q01288370-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFull DemolitionSigned-offAXENNT LLC03/19/2026
1 project · most recent 01/27/2026
Concrete Wood
FiledStatusContractorScope
01/27/2026——Concrete, Wood
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
01/26/2026Fire-Resistant Penetrations and Joints—special
01/26/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
01/26/2026Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities—special
01/26/2026Energy Code Compliance Inspections—progress
01/26/2026HVAC-R and service water piping design and insulation—energy_progress
01/26/2026HVAC-R and service water heating equipment—energy_progress
01/26/2026Maintenance information—energy_progress
01/26/2026HVAC-R and service water heating system controls—energy_progress
01/26/2026Permanent certificate—energy_progress
01/05/2026Energy Code Compliance Inspections—progress
01/05/2026Fire-Resistance Rated Construction—progress
01/05/2026Structural Wood Frame—progress
01/05/2026Electric vehicle service equipment requirements—energy_progress
01/05/2026Metering—energy_progress
01/05/2026Fenestration air leakage—energy_progress
01/05/2026Permanent certificate—energy_progress
01/05/2026Insulation placement and R values—energy_progress
01/05/2026Fenestration and door U-factor and product ratings—energy_progress
01/05/2026Protection of exposed foundation insulation—energy_progress
01/05/2026Fenestration areas—energy_progress
01/05/2026Interior lighting power—energy_progress
01/05/2026Air barrier — testing —energy_progress
01/05/2026Air barrier - visual inspection—energy_progress
01/05/2026Concrete - Cast-In-Place—special
01/05/2026Excavations - Sheeting, Shoring, and Bracing—special
Latest 25 of 33.
▾Documents — 29 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/18/2026Q01288370-I1Request digital key ↗
08/15/2026Q01342340-I1Request digital key ↗
08/15/2026Q01342340-S1Request digital key ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q01342340-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q01342340-I1Open ↗
▸DOB NOWRestrictive Declaration/Easement 11
08/15/2026Q01342340-I1Open ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/18/2026Q01288370-I1Open ↗
08/13/2026Q01342340-S1Open ↗
08/13/2026Q01342340-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/30/2026Q01288370-I1Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWElectric Cut-Off1
08/13/2026Q01288370-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026Q01288370-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026Q01288370-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026Q01288370-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/15/2026Q01342340-I1Open ↗
08/13/2026Q01342340-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/18/2026Q01288370-I1Open ↗
▸DOB NOWRodent Control1
08/13/2026Q01288370-I1Open ↗
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/15/2026Q01342340-I1Open ↗
08/13/2026Q01342340-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/15/2026Q01342340-I1Open ↗
▸Other Documents8
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/15/2026Q01342340-I1Open ↗
08/13/2026Q01342340-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/18/2026Q01288370-I1Open ↗
08/13/2026Q01342340-I1Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026Q01288370-I1Open ↗
▸DOB NOWStructure Photographs1
08/13/2026Q01288370-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026Q01342340-I1Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026Q01288370-I1Open ↗