| Owner | Filings | Most Recent |
|---|---|---|
| DORIA | 4 | 07/08/2026 |
| OWNERS REP | 18 | 07/08/2026 |
| SUNLIGHT DEVELOPMENT GROUP | 11 | 04/09/2026 |
| Date | Price | Unit | Seller → Buyer | $/sf |
|---|---|---|---|---|
| 10/14/2022 | $48.0M | — | — → — | — not available |
| Firm | Filings | Most Recent |
|---|---|---|
| LEE ENGINEERING & CONSULTING LLC | 10 | 06/18/2026 |
| HPL ENGINEERING P.C. | 22 | 05/21/2026 |
| YOU GAO | 2 | 02/26/2026 |
| SONI ENGINEERING CONSULTING | 1 | 11/18/2025 |
| WJY ELECTRIC INC. | 7 | 09/26/2025 |
| HRM ENGINEERING SERVICES, PC | 7 | 03/18/2025 |
| SKYLINE RIGGING | 1 | 01/10/2025 |
| HOWARD SHAPIRO & ASSOCIATES, P.C. | 1 | 10/22/2024 |
| PHILIP HABIB & ASSOCIATES | 1 | 07/26/2024 |
| PAUL PERDEK, PROF. ENG. PLLC | 10 | 07/22/2024 |
| LU ENGINEERING SERVICE PC | 3 | 07/26/2023 |
| JIAN ENGINEERING PLLC | 4 | 02/22/2023 |
| Representative | Filings | Most Recent |
|---|---|---|
| H Z BUILDING NY | 62 | 03/21/2026 |
| HOWARD I SHAPIRO ASSOCIATES | 2 | 03/21/2026 |
| AE DESIGN SOLUTION | 22 | 03/21/2026 |
| G PLAN BUILDING CONSULTING | 10 | 03/21/2026 |
| INDESIGN STUDIO | 4 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| CONSTRUCTION MNGT. AA,LLC | General Contractor | 62 | 07/08/2026 |
| CORE SCAFFOLD SYSTEMS INC. | General Contractor | 8 | 07/08/2026 |
| FULL CIRCLE PLUMBING CORP. | Plumbing | 3 | 07/08/2026 |
| TOP BUILD CONTRACTORS INC | General Contractor | 2 | 04/09/2026 |
| DYNAMIC PLBNG & SPRKR COR | Fire Protection | 2 | 07/08/2026 |
| NEPTUNE SIGNS AWNINGS | Scaffold | 2 | 07/08/2026 |
| PIPESTYLISTS, INC | Plumbing | 1 | 07/08/2026 |
| TRI CITY MECHANICAL GROUP CORP | Plumbing | 1 | 07/08/2026 |
| DORIA, INC | General Contractor | 1 | 07/08/2026 |
| ROBIN ELECTRICAL CO., INC | Electrical | 1 | 03/22/2026 |
| AVON PLBG & HTG INC | Fire Protection | 1 | 07/08/2026 |
| JEM FIRE PREVENTION INC | Fire Protection | 1 | 07/08/2026 |
| RIGHTWAY ELECTRICAL INC | Electrical | 1 | 03/22/2026 |
| I DO PLUMBING & HTG INC | Plumbing | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| NIC DESIGN INC | 9758 | 10 | 06/18/2026 |
| HPL ENGINEERING PC | 5613 | 32 | 05/21/2026 |
| YOU GAO | 9407 | 2 | 02/26/2026 |
| ROYAL CONSTRUCTION P.E. S | 462 | 4 | 03/18/2025 |
| SKYLINE RIGGING | 7880 | 1 | 01/10/2025 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Sign | Signed-off | DESTHERS, JOSEPH | 04/09/2026 |
| DOB NOW | Sign | Signed-off | DESTHERS, JOSEPH | 03/24/2026 |
| DOB NOW | Curb Cut | Signed-off | CONSTRUCTION MNGT. AA,LLC | 03/12/2026 |
| DOB NOW | Plumbing | Signed-off | FLAVIO MECHANICAL CORP | 02/24/2026 |
| DOB NOW | Sprinklers | Signed-off | JEM FIRE PREVENTION INC | 01/29/2026 |
| DOB NOW | Mechanical Systems | Signed-off | TOP BUILD CONTRACTORS INC | 12/26/2025 |
| DOB NOW | Supported Scaffold | Signed-off | CORE SCAFFOLD SYSTEMS INC | 11/18/2025 |
| DOB NOW | Plumbing | Signed-off | T & T PLUMBING INC | 10/01/2025 |
| DOB NOW | General Construction | Permit Issued | TOP BUILD CONTRACTORS INC | 09/29/2025 |
| DOB NOW | Sprinklers | Signed-off | AVON PLBG & HTG INC | 06/25/2025 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | CORE SCAFFOLD SYSTEMS INC | 05/30/2025 |
| DOB NOW | General Construction | Permit Issued | CONSTRUCTION MNGT. AA,LLC | 05/21/2025 |
| DOB NOW | Mechanical Systems | Signed-off | CONSTRUCTION MNGT. AA,LLC | 05/13/2025 |
| DOB NOW | Plumbing | Signed-off | FULL CIRCLE PLUMBING CORP | 05/12/2025 |
| DOB NOW | Plumbing | Signed-off | I DO PLUMBING & HTG INC | 05/09/2025 |
| DOB NOW | Sprinklers | Signed-off | CITYWIDE PLBG, HTG &SPRKL | 02/24/2025 |
| DOB NOW | Mechanical Systems | Signed-off | CONSTRUCTION MNGT. AA,LLC | 02/19/2025 |
| DOB NOW | Suspended Scaffold | Permit Issued | DORIA, INC | 01/10/2025 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | CONSTRUCTION MNGT. AA,LLC | 10/22/2024 |
| DOB NOW | General Construction | Signed-off | CONSTRUCTION MNGT. AA,LLC | 10/10/2024 |
| DOB NOW | General Construction | Permit Issued | CONSTRUCTION MNGT. AA,LLC | 10/10/2024 |
| DOB NOW | Construction Fence | Signed-off | CONSTRUCTION MNGT. AA,LLC | 10/07/2024 |
| DOB NOW | Structural | Signed-off | CONSTRUCTION MNGT. AA,LLC | 10/07/2024 |
| DOB NOW | Standpipe | Signed-off | CITYWIDE PLBG, HTG &SPRKL | 06/13/2024 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | CORE SCAFFOLD SYSTEMS INC | 06/03/2024 |
| DOB NOW | Plumbing | Signed-off | FULL CIRCLE PLUMBING CORP | 05/07/2024 |
| DOB NOW | Sidewalk Shed | Signed-off | CORE SCAFFOLD SYSTEMS INC | 03/11/2024 |
| DOB NOW | Foundation | Signed-off | CONSTRUCTION MNGT. AA,LLC | 02/22/2024 |
| DOB NOW | Structural | Signed-off | CONSTRUCTION MNGT. AA,LLC | 02/21/2024 |
| DOB NOW | Plumbing | Signed-off | FULL CIRCLE PLUMBING CORP | 01/08/2024 |
| DOB NOW | General Construction | Signed-off | CONSTRUCTION MNGT. AA,LLC | 11/13/2023 |
| DOB NOW | Foundation | Signed-off | CONSTRUCTION MNGT. AA,LLC | 11/08/2023 |
| DOB NOW | Foundation | Signed-off | CONSTRUCTION MNGT. AA,LLC | 11/03/2023 |
| DOB NOW | Construction Fence | Signed-off | CONSTRUCTION MNGT. AA,LLC | 11/03/2023 |
| DOB NOW | Structural | Signed-off | CONSTRUCTION MNGT. AA,LLC | 11/01/2023 |
| DOB NOW | Support of Excavation | Signed-off | CONSTRUCTION MNGT. AA,LLC | 11/01/2023 |
| DOB NOW | General Construction | Permit Issued | CONSTRUCTION MNGT. AA,LLC | 11/01/2023 |
| DOB NOW | Structural | Signed-off | CONSTRUCTION MNGT. AA,LLC | 10/17/2023 |
| DOB NOW | Foundation | Signed-off | CONSTRUCTION MNGT. AA,LLC | 10/17/2023 |
| DOB NOW | Construction Fence | Signed-off | CONSTRUCTION MNGT. AA,LLC | 10/16/2023 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 06/18/2026 | Signed-off | TOP BUILD CONTRACTORS INC | Heating and Air Conditioning Systems, Refrigeration Systems, Ventilation Systems | Heat / Cool Mitsubishi Electric PEFY-P96NMHSU-E 96,000 BTU · Vrf Indoor ×6 PLFY-P05NFMU-ER1.TH 5,000 BTU · Vrf Indoor ×2 PUHY-EP288TSNU-A1 (PUHY-EP120TNU-A1, PUHY-EP96TNU-AI, PUHY-EP72TNU-A) 288,000 BTU · Heat Pump Outdoor ×2 MUZ-GS12NA 12,000 BTU · Heat Pump Outdoor ×1 MXZ-SM60NAM2 60,000 BTU · Heat Pump Outdoor ×1 PEFY-P18NMAU-E5 18,000 BTU · Vrf Indoor ×1 PEFY-P36NMAU-E4 36,000 BTU · Vrf Indoor ×1 PEFY-P72NMHSU-E 72,000 BTU · Vrf Indoor ×1 PKA-A12LA1 12,000 BTU · Heat Pump Outdoor ×1 PKFY-P12NLMU-ER1.TH 12,000 BTU · Vrf Indoor ×1 PLFY-EP18NEMU-E1R1 18,000 BTU · Vrf Indoor ×1 PUHY-HP96TNU-A1 96,000 BTU · Vrf Outdoor ×1 Ventilation Mitsubishi Electric MXZ-SM48NL-U1 72,000 BTU · Heat Pump Outdoor ×1 PEFY-P48NMHU-E-OA 48,000 BTU · Vrf Indoor ×1 PEFY-P96NMHU-E-OA 96,000 BTU · Vrf Indoor ×1 PUHY-EP96TNU-A1 96,000 BTU · Vrf Outdoor ×1 Captiveaire SIF13DD 1,000 CFM · Exhaust Fan ×1 Refrigeration Trenton TQZD050H8-HT3D 50,100 BTU · Condensing Unit ×3 TEZA020H8-HT3D 18,200 BTU · Condensing Unit ×2 TEZA035L8-HT3D 15,900 BTU · Condensing Unit ×2 TEZA040H8-HT3D 49,900 BTU · Condensing Unit ×2 TQZD030H8-HT3D 28,400 BTU · Condensing Unit ×2 TQZD040H8-HT3D 41,300 BTU · Condensing Unit ×2 TEZA 055L8-HT3D 33,900 BTU · Condensing Unit ×1 TEZA015H8-HT3D 15,840 BTU · Condensing Unit ×1 TEZA025H8-HT3D 24,400 BTU · Condensing Unit ×1 TEZA045H8-HT3D 53,600 BTU · Condensing Unit ×1 TEZA045L8-HT3D 27,200 BTU · Condensing Unit ×1 TEZA060L8-HT3D 39,200 BTU · Condensing Unit ×1 |
| 05/21/2026 | Signed-off | CONSTRUCTION MNGT. AA,LLC | Heating and Air Conditioning Systems, Ventilation Systems | Heat / Cool General Electric AZ45E12DBM 1 tons · Ptac ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/21/2026 | Signed-off | DYNAMIC PLBNG & SPRKR COR | Sprinkler System |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/21/2026 | Signed-off | SUNLIGHT PLUMBING INC | Gas, Storm, Water/Sanitary |
| 04/15/2026 | Signed-off | TRI CITY MECHANICAL GROUP | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/01/2026 | Complete | RIGHTWAY ELECTRICAL INC | General Wiring |
| 11/11/2025 | Complete | ROBIN ELECTRICAL CO., INC | General Wiring |
| 10/28/2025 | Complete | KJK ELECTRIC INC | — |
| 10/25/2024 | Complete | RIGHTWAY ELECTRICAL INC | 1 meters, 1 new_meters |
| 08/05/2024 | Complete | KJK ELECTRIC INC | — |
| 08/05/2024 | Complete | KJK ELECTRIC INC | — |
| 07/16/2024 | Cancelled | KJK ELECTRIC INC | — |
| 03/03/2023 | Complete | SOLAS ELECTRICAL CORP | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/21/2026 | Signed-off | CONSTRUCTION MNGT. AA,LLC | Steel, Concrete, Masonry |
| 02/22/2023 | Permit Issued | CONSTRUCTION MNGT. AA,LLC | 1 scope_items |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 11/18/2025 | Signed-off | CORE SCAFFOLD SYSTEMS INC | Scaffold |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/21/2026 | Signed-off | CONSTRUCTION MNGT. AA,LLC | Earthwork |
| Date | Type | Result | Report |
|---|---|---|---|
| 09/03/2026 | Pass-Final General Construction Non-Directive 14 | Pass | View ↗ |
| 02/09/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 01/30/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 12/19/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 07/28/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 07/08/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 07/07/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 07/01/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 06/20/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 06/09/2025 | Pass-Final SD - Up to 3 Requested Floors | Pass | View ↗ |
| 06/09/2025 | Pass-Final SP - Up to 3 Requested Floors | Pass | View ↗ |
| 06/04/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/02/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 03/14/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 03/11/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 03/11/2025 | Pass-Final SD - Up to 3 Requested Floors | Pass | View ↗ |
| 03/11/2025 | Pass-Final SP - Up to 3 Requested Floors | Pass | View ↗ |
| 03/07/2025 | Fail-Final CND-Occupancy Inspection | Fail | View ↗ |
| 03/04/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 03/04/2025 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 02/03/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 02/13/2024 | Pass-Final PL - Underground | Pass | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 06/30/2026 | Mechanical Systems | Eric Sun | special |
| 06/30/2026 | Energy Code Compliance Inspections | Eric Sun | progress |
| 06/30/2026 | HVAC-R and service water heating equipment | Eric Sun | energy_progress |
| 06/30/2026 | HVAC-R and service water heating system controls | Eric Sun | energy_progress |
| 06/30/2026 | HVAC-R and service water piping design and insulation | Eric Sun | energy_progress |
| 06/30/2026 | Final | Yuxuan Liu | progress |
| 06/09/2026 | HVAC-R and service water piping design and insulation | Eric Sun | energy_progress |
| 06/09/2026 | Mechanical Systems | Eric Sun | special |
| 06/09/2026 | HVAC-R and service water heating equipment | Eric Sun | energy_progress |
| 06/09/2026 | HVAC-R and service water heating system controls | Eric Sun | energy_progress |
| 06/09/2026 | Final | Eric Sun | progress |
| 06/09/2026 | Energy Code Compliance Inspections | Eric Sun | progress |
| 04/24/2026 | Sprinkler Systems | Eric Sun | special |
| 04/15/2026 | Fenestration air leakage | Eric Sun | energy_progress |
| 04/15/2026 | HVAC-R and service water heating system controls | Eric Sun | energy_progress |
| 04/15/2026 | Energy Code Compliance Inspections | Eric Sun | progress |
| 04/15/2026 | Interior lighting power | Eric Sun | energy_progress |
| 04/15/2026 | Fire-Resistant Penetrations and Joints | Eric Sun | special |
| 04/15/2026 | HVAC-R and service water heating equipment | Eric Sun | energy_progress |
| 04/15/2026 | HVAC-R and service water piping design and insulation | Eric Sun | energy_progress |
| 04/15/2026 | Energy Code Compliance Inspections | Eric Sun | progress |
| 04/15/2026 | Vestibules | Eric Sun | energy_progress |
| 04/15/2026 | Fenestration and door U-factor and product ratings | Eric Sun | energy_progress |
| 04/15/2026 | Air barrier - visual inspection | Eric Sun | energy_progress |
| 04/15/2026 | Structural Stability – Alterations of existing buildings | Eric Sun | special |