← Back
Two stories - detached, small or mid-size
138-21 LINDEN BOULEVARD
QUEENS · South Jamaica · BIN 4258478
💬 Discuss this project
1925Year Built
2Stories
A1Building Class
R3AZoning
882 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 1,900 sf lot · 0.46 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 7 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/11/2019$460K—— → —$522/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TOM PETERSEN ARCHITECT, LLC111/28/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TRIANGLE ELECTRIC INC.Electrical103/22/2026
THE GREEN PLUG LLCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
THOMAS PETERSEN ARCHITECT7854111/28/2025
Building Lifecycle
All (6)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (3)
05/14/2026
Signed off — Alteration
INSTALLATION OF PV SYSTEM ON EXISTING ROOFTOP. NO CHANGES TO EGRESS OR USE OF OCCUPANCY.
Q01326008-I1
12/02/2025
Permit issued — Solar
Q01326008-I1-SL
11/28/2025
Filed — Alteration
INSTALLATION OF PV SYSTEM ON EXISTING ROOFTOP. NO CHANGES TO EGRESS OR USE OF OCCUPANCY.
Q01326008-I1
11/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
TOM PETERSEN
11/28/2025
Special inspection requirement — Energy Code Compliance Inspections
TOM PETERSEN
11/28/2025
Special inspection requirement — Final
TOM PETERSEN
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offTHE GREEN PLUG LLC12/02/2025
3 projects · most recent 11/21/2025
FiledStatusContractorScope
11/21/2025CompleteL.D.M. ELECTL CONTRS INC—
11/21/2025CompleteL.D.M. ELECTL CONTRS INC1 meters
02/28/2019Permit IssuedTRIANGLE ELECTRIC INC.1 meters
1 project · most recent 11/28/2025
FiledStatusContractorScope
11/28/2025Signed-offTHE GREEN PLUG LLC34 panels, 14.62 kw, 665.6 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
11/28/2025Fire-Resistant Penetrations and JointsTOM PETERSENspecial
11/28/2025Energy Code Compliance InspectionsTOM PETERSENprogress
11/28/2025FinalTOM PETERSENprogress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/18/2026Q01326008-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
09/23/2026Q01326008-I1Open ↗
09/23/2026Q01326008-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/18/2026Q01326008-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/23/2026Q01326008-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/18/2026Q01326008-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/18/2026Q01326008-I1Open ↗