Elevator apt, fireproof without stores
The Haru
138-25 BARCLAY AVENUE · BIN 4114292
💬 Discuss this project
2023Year Built
7Stories
D3Building Class
R7-1Zoning
40,976 sfGross Floor Area
48Units
Rent Stabilized3 Open Violations ▸
Elevator apt, fireproof without stores · 12,400 sf lot · 3.3 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingFire Protection
Floor 517p · 1 filing · 20 docs
Floor 417p · 1 filing · 20 docs
Floor 317p · 1 filing · 20 docs
Floor 218p · 1 filing · 20 docs
Floor 121p · 1 filing · 20 docs
Cellar21p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WATERMARK3607/08/2026
OWNERS REP1003/22/2026
WMCM203/22/2026
WATERMARK CAPITAL203/22/2026
BARCLAY USA LLC203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE DESIGN SOLUTION1403/21/2026
WMCM1803/21/2026
ND ARCHITECTURE DESIGN603/21/2026
BUILDINGS REPRISENTATIVE LLC803/21/2026
IOR DESIGN & CONSULTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WMCM LLCGeneral Contractor3107/08/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor603/21/2026
PRIME PIPING & HEATING INFire Protection107/08/2026
PRIME PIPING & HEATING INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
REGIONAL TESTING CORP.3941406/10/2024
Building Lifecycle
All (121)Filed (25)Permit Issued (19)Signed Off (11)Violation (12)Inspection (10)Objection (14)Special Inspection (30)
07/18/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/21/2024
Violation issued (HPD, closed)
A
06/21/2024
Violation issued (HPD, closed)
A
06/21/2024
Violation issued (HPD, closed)
A
06/21/2024
Violation issued (HPD, closed)
A
06/21/2024
Violation issued (HPD, closed)
A
06/21/2024
Violation issued (HPD, closed)
A
06/21/2024
Violation issued (HPD, closed)
C
06/12/2024
Special inspection requirement — Duct leakage testing, insulation and design
Paul Raymond
06/12/2024
Special inspection requirement — Vestibules
Paul Raymond
06/12/2024
Special inspection requirement — Protection of exposed foundation insulation
Paul Raymond
06/12/2024
Special inspection requirement — Air barrier continuity plan testing
Paul Raymond
06/12/2024
Special inspection requirement — Electrical motors and elevators
Paul Raymond
06/12/2024
Special inspection requirement — Insulation placement and R values
Paul Raymond
06/12/2024
Special inspection requirement — Fenestration areas
Paul Raymond
06/12/2024
Special inspection requirement — Permanent certificate
Paul Raymond
06/12/2024
Special inspection requirement — HVAC-R and service water heating system controls
Paul Raymond
06/12/2024
Special inspection requirement — Interior lighting power
Paul Raymond
06/12/2024
Special inspection requirement — Electric vehicle service equipment requirements
Paul Raymond
06/12/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Paul Raymond
06/12/2024
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
Paul Raymond
06/12/2024
Special inspection requirement — HVAC-R and service water heating equipment
Paul Raymond
06/12/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
06/12/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Paul Raymond
06/12/2024
Special inspection requirement — Exterior lighting power
Paul Raymond
06/12/2024
Special inspection requirement — Air barrier - visual inspection
Paul Raymond
06/12/2024
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Paul Raymond
06/12/2024
Special inspection requirement — Maintenance information
Paul Raymond
06/12/2024
Special inspection requirement — Lighting in dwelling units
Paul Raymond
06/12/2024
Special inspection requirement — Lighting controls
Paul Raymond
06/12/2024
Special inspection requirement — Metering
Paul Raymond
06/12/2024
Special inspection requirement — Fenestration air leakage
Paul Raymond
06/10/2024
Filed — New Building
Soe system drawings in conjunction with NB application Q00692280-I1
Q00692280-P6
06/10/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Paul Raymond
06/10/2024
Special inspection requirement — Air barrier - visual inspection
Paul Raymond
06/10/2024
Special inspection requirement — Fenestration areas
Paul Raymond
06/10/2024
Special inspection requirement — Metering
Paul Raymond
06/10/2024
Special inspection requirement — Interior lighting power
Paul Raymond
06/10/2024
Special inspection requirement — HVAC-R and service water heating equipment
Paul Raymond
05/21/2024
Signed off — New Building
Soe system drawings in conjunction with NB application Q00692280-I1
Q00692280-S4
05/21/2024
Signed off — New Building
Soe system drawings in conjunction with NB application Q00692280-I1
Q00692280-S3
05/15/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/18/2024
Violation issued (HPD, closed)
A
01/09/2024
Permit issued — Mechanical Systems
Q00692280-S4-MS
01/03/2024
Signed off — New Building
Soe system drawings in conjunction with NB application Q00692280-I1
Q00692280-S5
01/03/2024
Signed off — Alteration
Foundation system drawings in conjunction with NB application Q00692280-I1
Q00737275-I1
01/03/2024
Permit issued — Earth Work
Q00737275-I1-FO-EA
01/02/2024
Signed off — New Building
Soe system drawings in conjunction with NB application Q00692280-I1
Q00692280-S2
01/02/2024
Signed off — Alteration
Q00739736-I1
01/02/2024
Signed off — New Building
Soe system drawings in conjunction with NB application Q00692280-I1
Q00692280-S1
12/26/2023
Signed off — New Building
Soe system drawings in conjunction with NB application Q00692280-I1
Q00692280-S8
12/14/2023
Permit issued — Support of Excavation
Q00692280-S3-SE
12/05/2023
Signed off — Alteration
PROPOSED CONSTRUCTION FENCE NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00732267-I1
12/05/2023
Permit issued — Foundation
Q00692280-S1-FO
12/04/2023
Inspection — Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test
Certified
View inspection ↗
12/04/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/01/2023
Permit issued — Structural
Q00692280-S2-ST
12/01/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
11/30/2023
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
Latest 60 of 121 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offWMCM LLC01/09/2024
DOB NOWEarth WorkSigned-offWMCM LLC01/03/2024
DOB NOWSupport of ExcavationSigned-offWMCM LLC12/14/2023
DOB NOWFoundationSigned-offWMCM LLC12/05/2023
DOB NOWStructuralSigned-offWMCM LLC12/01/2023
DOB NOWCurb CutSigned-offWMCM LLC11/17/2023
DOB NOWConstruction FenceSigned-offWMCM LLC10/18/2023
DOB NOWGeneral ConstructionPermit IssuedWMCM LLC06/28/2023
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC06/17/2023
DOB NOWFoundationSigned-offWMCM LLC06/01/2023
DOB NOWGeneral ConstructionPermit IssuedWMCM LLC05/23/2023
DOB NOWGeneral ConstructionPermit IssuedWMCM LLC03/21/2023
DOB NOWSprinklersSigned-offA M B MECHANICAL INC03/20/2023
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC03/10/2023
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN02/15/2023
DOB NOWConstruction FenceSigned-offWMCM LLC11/03/2022
DOB NOWFoundationSigned-offWMCM LLC11/03/2022
DOB NOWFoundationSigned-offWMCM LLC06/09/2022
DOB NOWConstruction FenceSigned-offWMCM LLC05/25/2022
BIS—ISSUEDXOLLE DEMO LLC09/20/2022
BIS—ISSUEDXOLLE DEMO LLC08/30/2022
1 project · most recent 06/10/2024
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/10/2024Signed-offWMCM LLCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric PUMY-P36NKMU3(-BS) (non-ducted) 3 tons · Vrf Outdoor ×49
PUMY-P36NKMU(-BS) ( Ducted) 3 tons · Vrf Outdoor ×1
PUY_A12NKA7 ( non-ducted) 1 tons · Condensing Unit ×1
Daikin RXSQ24TAVJU 2 tons · Vrf Outdoor ×1
Lg ARUN038GSS4 3 tons · Vrf Outdoor ×1
Ventilation
Renewaire HE1.5RTV 960 CFM · Erv ×1
1 project · most recent 06/10/2024
Sprinkler System
FiledStatusContractorScope
06/10/2024Signed-offPRIME PIPING & HEATING INSprinkler System
1 project · most recent 06/10/2024
Storm Water/Sanitary
FiledStatusContractorScope
06/10/2024Signed-offPRIME PIPING & HEATING INStorm, Water/Sanitary
5 projects · most recent 05/31/2024
General Wiring
FiledStatusContractorScope
05/31/2024CompleteHIVOLTS ELECTRICAL INCGeneral Wiring
11/28/2023CompleteHIVOLTS ELECTRICAL INCGeneral Wiring
11/07/2023Complete.UXEDO ELEC'L CONTR'G INC—
03/02/2023CompleteHIVOLTS ELECTRICAL INC—
06/14/2022CompleteSOLAS ELECTRICAL CORP—
1 project · most recent 06/10/2024
FiledStatusContractorScope
06/10/2024Signed-offWMCM LLC2 scope_items
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
07/18/2025Fail-Final General Construction Non-Directive 14FailView ↗
05/15/2024Pass-Final General Construction Non-Directive 14PassView ↗
12/04/2023Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
12/04/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/01/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
11/30/2023Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
11/30/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/30/2023Pass-Final CND-Occupancy InspectionPassView ↗
03/07/2023Pass-Final PL - UndergroundPassView ↗
03/01/2023Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 113
DateRequirementInspectorRole
06/12/2024Exterior Insulation and Finish Systems (EIFS)Paul Raymondspecial
06/12/2024Electrical motors and elevatorsPaul Raymondenergy_progress
06/12/2024Fenestration and door U-factor and product ratingsPaul Raymondenergy_progress
06/12/2024Insulation placement and R valuesPaul Raymondenergy_progress
06/12/2024VestibulesPaul Raymondenergy_progress
06/12/2024Electric vehicle service equipment requirementsPaul Raymondenergy_progress
06/12/2024Fenestration air leakagePaul Raymondenergy_progress
06/12/2024Duct leakage testing, insulation and designPaul Raymondenergy_progress
06/12/2024Air barrier continuity plan testingPaul Raymondenergy_progress
06/12/2024Interior lighting powerPaul Raymondenergy_progress
06/12/2024Lighting controlsPaul Raymondenergy_progress
06/12/2024Lighting in dwelling unitsPaul Raymondenergy_progress
06/12/2024HVAC-R and service water heating system controlsPaul Raymondenergy_progress
06/12/2024Maintenance informationPaul Raymondenergy_progress
06/12/2024Protection of exposed foundation insulationPaul Raymondenergy_progress
06/12/2024Permanent certificatePaul Raymondenergy_progress
06/12/2024Air barrier - visual inspectionPaul Raymondenergy_progress
06/12/2024Exterior lighting powerPaul Raymondenergy_progress
06/12/2024Fenestration areasPaul Raymondenergy_progress
06/12/2024HVAC-R and service water piping design and insulationPaul Raymondenergy_progress
06/12/2024MeteringPaul Raymondenergy_progress
06/12/2024HVAC-R and service water heating equipmentPaul Raymondenergy_progress
06/12/2024Wall Panels, Curtain Walls, and VeneersPaul Raymondspecial
06/12/2024Fire-Resistant Penetrations and JointsPaul Raymondspecial
06/10/2024Air barrier - visual inspectionPaul Raymondenergy_progress
Latest 25 of 113.
▾Documents — 230 on file (BIS + DOB NOW)
▸Plans & Drawings25
▸DOB NOWPlans/Sketch25
08/26/2026Q00692280-S4Request digital key ↗
08/26/2026Q00692280-S2Request digital key ↗
08/26/2026Q00692280-I1Request digital key ↗
Showing 3 of 25 on file for this type
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION2
05/24/2022440727206Open ↗
05/12/2022421805559Open ↗
▸BISWORK PERMIT APPLICATION2
11/07/2022421805559Open ↗
10/20/2022421805559Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
05/24/2022440727206Open ↗
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026Q00692280-P6Open ↗
08/13/2026Q00692280-P4Open ↗
08/13/2026Q00692280-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026Q00692280-P6Open ↗
08/13/2026Q00692280-P4Open ↗
08/13/2026Q00692280-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00692280-I1Open ↗
▸Seals & Professional Certifications138
▸DOB NOWProgress Inspector Seal & Signature89
09/25/2026Q00692280-P1Open ↗
09/25/2026Q00692280-P1Open ↗
09/25/2026Q00692280-P1Open ↗
Showing 3 of 89 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature25
08/26/2026Q00692280-S3Open ↗
08/26/2026Q00692280-S2Open ↗
08/26/2026Q00692280-S1Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature23
09/25/2026Q00692280-P1Open ↗
09/05/2026Q00692280-S5Open ↗
09/02/2026Q00692280-S4Open ↗
Showing 3 of 23 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
05/24/2022440727206Open ↗
▸Trade Schedules & Equipment5
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026Q00692280-I1Open ↗
08/13/2026Q00692280-P4Open ↗
08/13/2026Q00692280-P6Open ↗
▸BISGAS CUT-OFF1
10/20/2022421805559Open ↗
▸BISSEWER CUT-OFF1
10/20/2022421805559Open ↗
▸Safety & Tenant Protection14
▸DOB NOWStreet Tree Checklist3
08/13/2026Q00692280-I1Open ↗
08/13/2026Q00692280-P6Open ↗
08/13/2026Q00692280-P4Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE2
11/07/2022421805559Open ↗
10/20/2022421805559Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
10/20/2022421805559Open ↗
▸BISBPP: STREET TREES SITE PLAN1
11/15/2022440727206Open ↗
▸BISSTREET TREE CHECKLIST1
11/15/2022440727206Open ↗
▸BISSTREET TREE SIGNOFF1
01/29/2024440727206Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
10/20/2022421805559Open ↗
▸BISSTREET TREES SITE PLAN1
01/29/2024440727206Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q00692280-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026Q00692280-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00692280-I1Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/20/2022421805559Open ↗
▸Energy Compliance3
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026Q00692280-S5Open ↗
08/13/2026Q00692280-S4Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026Q00692280-I1Open ↗
▸Approvals, Objections & Sign-offs9
▸BISLETTERS - SUPPORTING DOCUMENTATION7
11/07/2022421805559Open ↗
11/07/2022421805559Open ↗
10/20/2022421805559Open ↗
Showing 3 of 7 on file for this type
▸BISTAP LETTER - DOM SVC : DEP-DOM1
10/20/2022421805559Open ↗
▸BISCURB CUT (CC) SIGNOFF1
01/29/2024440727206Open ↗
▸Cost, Insurance & Ownership4
▸BISDEPT OF FINANCE VERIFICATION2
11/07/2022421805559Open ↗
10/20/2022421805559Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE2
11/07/2022421805559Open ↗
10/20/2022421805559Open ↗
▸Filing & Intake Forms6
▸BISBOROUGH INTAKE FORM2
11/07/2022421805559Open ↗
10/20/2022421805559Open ↗
▸BISEFILING COVER SHEET1
05/12/2022421805559Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
05/24/2022440727206Open ↗
▸BISADDITIONAL INFORMATION1
11/07/2022421805559Open ↗
▸DOB NOWAI1 Form (from plan PDF)1
08/16/2026Q00758537-P3Open ↗
▸Other Documents13
▸DOB NOWSite Survey: Initial3
08/13/2026Q00692280-P6Open ↗
08/13/2026Q00692280-P4Open ↗
08/13/2026Q00692280-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026Q00692280-I1Open ↗
08/13/2026Q00692280-P4Open ↗
08/13/2026Q00692280-P6Open ↗
▸DOB NOWProperty Ownership Certification3
08/26/2026Q00692280-I1Open ↗
08/26/2026Q00692280-P4Open ↗
08/26/2026Q00692280-P6Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026Q00692280-S3Open ↗
08/13/2026Q00737275-I1Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
05/24/2022440727206Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00692280-I1Open ↗