← Back
BuildNYC
Elevator apt, fireproof without stores
The Haru
138-25 BARCLAY AVENUE · BIN 4114292
💬 Discuss this project
2023Year Built
7Stories
D3Building Class
R7-1Zoning
40,976 sfGross Floor Area
48Units
Rent Stabilized3 Active Violations ▸
Elevator apt, fireproof without stores · 12,400 sf lot · 3.3 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof66p · 1 filing · 20 docs
Bulkhead2p · 1 filing · 20 docs
Floor 7Temporary pipe scaffold installation78p · 2 filings · 20 docs
Floor 6Temporary pipe scaffold installation78p · 2 filings · 20 docs
Floor 5Temporary pipe scaffold installation86p · 2 filings · 20 docs
Floor 4Temporary pipe scaffold installation86p · 2 filings · 20 docs
Floor 3Temporary pipe scaffold installation86p · 2 filings · 20 docs
Floor 2Temporary pipe scaffold installation87p · 2 filings · 20 docs
Floor 1New curb cut90p · 3 filings · 20 docs
Cellar79p · 2 filings · 20 docs
Site & exteriorConstruction fence installation65p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Watermark3807/08/2026
Barclay USA203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE Design Solution1403/21/2026
WMCM1803/21/2026
ND Architecture Design603/21/2026
Buildings Reprisentative803/21/2026
Ior Design & Consulting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WMCMGeneral Contractor2607/08/2026
Core Scaffold SystemsScaffold603/21/2026
WMCMScaffold507/08/2026
Prime Piping & HeatingPlumbing107/08/2026
Prime Piping & HeatingFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Regional Testing3941406/10/2024
Building Lifecycle
12/17/2025
Elevator Category 1 inspection report filed
04/16/2025
Closed: Failure to file 2023 external low pressure inspection
DOB violation · closed on the city's record
09/23/2024
Failure to file 2023 external low pressure inspection
DOB violation · closed
06/28/2024
Permit expired, never signed off — General Construction
The city's record still shows this permit as issued, with no sign-off on its filing
Q00692280-I1-GC
06/27/2024
Closed: Failure to file 2022 external low pressure inspection
DOB violation · closed on the city's record
123 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offWMCM01/09/2024
DOB NOWEarth WorkSigned-offWMCM01/03/2024
DOB NOWSupport of ExcavationSigned-offWMCM12/14/2023
DOB NOWFoundationSigned-offWMCM12/05/2023
DOB NOWStructuralSigned-offWMCM12/01/2023
DOB NOWCurb CutSigned-offWMCM11/17/2023
DOB NOWConstruction FenceSigned-offWMCM10/18/2023
DOB NOWGeneral ConstructionPermit IssuedWMCM06/28/2023
DOB NOWSidewalk ShedSigned-offCore Scaffold Systems06/17/2023
DOB NOWEarth WorkSigned-offWMCM06/01/2023
DOB NOWGeneral ConstructionPermit IssuedWMCM05/23/2023
DOB NOWGeneral ConstructionPermit IssuedWMCM03/21/2023
DOB NOWSprinklersSigned-offAmb Mechanical03/20/2023
DOB NOWSupported ScaffoldSigned-offCore Scaffold Systems03/10/2023
DOB NOWPlumbingSigned-offPrime Piping & Heating02/15/2023
DOB NOWFoundationSigned-offWMCM11/03/2022
DOB NOWConstruction FenceSigned-offWMCM11/03/2022
DOB NOWEarth WorkSigned-offWMCM06/09/2022
DOB NOWConstruction FenceSigned-offWMCM05/25/2022
BIS—ISSUEDXolle Demo09/20/2022
BIS—ISSUEDXolle Demo08/30/2022
1 project · most recent 06/10/2024
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScope
06/10/2024Signed-offWMCMHeating and Air Conditioning Systems, Ventilation Systems
1 project · most recent 06/10/2024
Sprinkler System
FiledStatusContractorScope
06/10/2024Signed-offPrime Piping & HeatingSprinkler System
1 project · most recent 06/10/2024
Storm Water/Sanitary
FiledStatusContractorScope
06/10/2024Signed-offPrime Piping & HeatingStorm, Water/Sanitary
5 projects · most recent 05/31/2024
General Wiring
FiledStatusContractorScope
05/31/2024CompleteHivolts ElectricalGeneral Wiring
11/28/2023CompleteHivolts ElectricalGeneral Wiring
11/07/2023CompleteUxedo Electrical Contracting—
03/02/2023CompleteHivolts Electrical—
06/14/2022CompleteSolas Electrical—
1 project · most recent 06/10/2024
FiledStatusContractorScope
06/10/2024Signed-offWMCM—
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
12/04/2023Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
12/04/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/01/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
11/30/2023Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
11/30/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/30/2023Pass-Final CND-Occupancy InspectionPassView ↗
03/07/2023Pass-Final PL - UndergroundPassView ↗
03/01/2023Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 113
DateRequirementInspectorRole
06/12/2024Fire-Resistant Penetrations and JointsPaul Raymondspecial
06/12/2024Wall Panels, Curtain Walls, and VeneersPaul Raymondspecial
06/12/2024Exterior Insulation and Finish Systems (EIFS)Paul Raymondspecial
06/12/2024HVAC-R and service water heating equipmentPaul Raymondenergy_progress
06/12/2024MeteringPaul Raymondenergy_progress
06/12/2024HVAC-R and service water piping design and insulationPaul Raymondenergy_progress
06/12/2024Fenestration areasPaul Raymondenergy_progress
06/12/2024Exterior lighting powerPaul Raymondenergy_progress
06/12/2024Air barrier - visual inspectionPaul Raymondenergy_progress
06/12/2024Permanent certificatePaul Raymondenergy_progress
06/12/2024Protection of exposed foundation insulationPaul Raymondenergy_progress
06/12/2024Maintenance informationPaul Raymondenergy_progress
06/12/2024HVAC-R and service water heating system controlsPaul Raymondenergy_progress
06/12/2024Lighting in dwelling unitsPaul Raymondenergy_progress
06/12/2024Lighting controlsPaul Raymondenergy_progress
06/12/2024Interior lighting powerPaul Raymondenergy_progress
06/12/2024Air barrier continuity plan testingPaul Raymondenergy_progress
06/12/2024Duct leakage testing, insulation and designPaul Raymondenergy_progress
06/12/2024Fenestration air leakagePaul Raymondenergy_progress
06/12/2024Electric vehicle service equipment requirementsPaul Raymondenergy_progress
06/12/2024VestibulesPaul Raymondenergy_progress
06/12/2024Insulation placement and R valuesPaul Raymondenergy_progress
06/12/2024Fenestration and door U-factor and product ratingsPaul Raymondenergy_progress
06/12/2024Electrical motors and elevatorsPaul Raymondenergy_progress
06/10/2024Exterior Insulation and Finish Systems (EIFS)Paul Raymondspecial
Latest 25 of 113.
230 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account