← Back
QUEENS
Le Tour Condominium
138-28 QUEENS BOULEVARD · BIN 4611483
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
LL97 Covered15 Open Violations ▸FDNY Report ↗
Flood zone X
Locations of Work
ArchitecturePlumbingFire Protection
Floor 13p · 2 filings · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RELIABLE ENTERPRISES2207/08/2026
HKS CONSTRUCTION607/08/2026
SHELTEROCK DEVELOPMENT GROUP103/22/2026
WHITE ROCK MANAGEMENT1603/21/2026
JFV ENTERPRISE103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/14/2016$6.1M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
FRANK PETRUSORA AOL COM803/21/2026
SNR EXPEDITING DESIGN403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RELIABLE ENTERPRISES INCGeneral Contractor1207/08/2026
SDBOV CONSTRUCTION INCGeneral Contractor303/21/2026
UPRIGHT FIRE PROTCTN LLCFire Protection207/08/2026
FLUID MECHANICS CORPPlumbing107/08/2026
HKS CONSTRUCTION CORPGeneral Contractor107/08/2026
PHOENIX PLMBG & MECH CORPFire Protection107/08/2026
RONART ELECTRIC COElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FRANK PETRUSO ARCHITECT,P993312/07/2022
ALL CITY ENGINEERING PC7115105/25/2022
Building Lifecycle
All (106)Filed (12)Permit Issued (12)Signed Off (6)Violation (60)Inspection (6)Special Inspection (10)
11/21/2025
Violation issued (HPD, closed)
I
04/02/2025
Violation issued (HPD, open)
A
04/02/2025
Violation issued (HPD, open)
A
04/02/2025
Violation issued (HPD, open)
A
04/02/2025
Violation issued (HPD, open)
A
04/02/2025
Violation issued (HPD, open)
A
04/02/2025
Violation issued (HPD, open)
A
11/19/2024
Violation issued (ECB, closed)
Construction
04/18/2024
Violation issued (HPD, closed)
A
11/27/2023
Violation issued (HPD, closed)
I
05/12/2023
Violation issued (HPD, open)
A
05/12/2023
Violation issued (HPD, open)
A
05/12/2023
Violation issued (HPD, open)
A
05/12/2023
Violation issued (HPD, open)
A
05/12/2023
Violation issued (HPD, open)
A
05/12/2023
Violation issued (HPD, open)
A
05/12/2023
Violation issued (HPD, open)
B
05/12/2023
Violation issued (HPD, open)
A
05/12/2023
Violation issued (HPD, open)
A
02/09/2023
Signed off — Alteration
INSTALL PLUMBING FIXTURES, MODIFY SPRINKLER SYSTEM BY RELOCATING AND ADDING SPRINKLER HEADS.
Q00727209-I1
01/12/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/04/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/03/2023
Permit issued — Plumbing
Q00727209-I1-EW-SP
12/21/2022
Signed off — Alteration
INTERIOR RENOVATION OF TENANT SAPCE (USE GROUP 6) HAIR SALON. INSTALL PARTITIONS, FIXTURES AND FINISHES.
Q00727123-I1
12/20/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
12/08/2022
Special inspection requirement — Energy Code Compliance Inspections
Frank Petruso
12/08/2022
Special inspection requirement — Energy Code Compliance Inspections
Frank Petruso
12/08/2022
Special inspection requirement — Interior lighting power
Frank Petruso
12/08/2022
Special inspection requirement — Lighting controls
Frank Petruso
12/08/2022
Special inspection requirement — Sprinkler Systems
Liangkai Xia
12/08/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Frank Petruso
12/07/2022
Filed — Alteration
INTERIOR RENOVATION OF TENANT SAPCE (USE GROUP 6) HAIR SALON. INSTALL PARTITIONS, FIXTURES AND FINISHES.
Q00727123-P1
12/07/2022
Filed — Alteration
INSTALL PLUMBING FIXTURES, MODIFY SPRINKLER SYSTEM BY RELOCATING AND ADDING SPRINKLER HEADS.
Q00727209-P1
12/07/2022
Special inspection requirement — Sprinkler Systems
Frank Petruso
12/07/2022
Special inspection requirement — Energy Code Compliance Inspections
Frank Petruso
10/20/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/12/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
07/07/2022
Permit issued — Sprinklers
Q00727209-I1-EW-SP
06/29/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
06/13/2022
Permit issued — Plumbing
Q00727209-I1-PL
06/13/2022
Permit issued — Sprinklers
Q00727209-I1-EW-SP
06/01/2022
Permit issued — General Construction
Q00727123-I1-GC
05/25/2022
Filed — Alteration
INSTALL PLUMBING FIXTURES, MODIFY SPRINKLER SYSTEM BY RELOCATING AND ADDING SPRINKLER HEADS.
Q00727209-I1
05/19/2022
Filed — Alteration
INTERIOR RENOVATION OF TENANT SAPCE (USE GROUP 6) HAIR SALON. INSTALL PARTITIONS, FIXTURES AND FINISHES.
Q00727123-I1
01/10/2022
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Q00270395-I1
10/27/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/13/2021
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Q00314606-I1
08/05/2021
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Q00330716-I1
08/04/2021
Signed off — Alteration
Q00532383-I1
07/26/2021
Violation issued (ECB, closed)
Unknown
07/26/2021
Violation issued (ECB, closed)
Unknown
07/26/2021
Violation issued (ECB, closed)
Unknown
06/08/2021
Permit issued — Sidewalk Shed
Q00532383-I1-SH
06/03/2021
Filed — Alteration
Q00532383-I1
05/28/2021
Special inspection requirement — Final
Sunil Saigal
05/27/2021
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Q00330716-P2
05/11/2021
Violation issued (ECB, closed)
Construction
05/11/2021
Violation issued (ECB, closed)
Construction
05/11/2021
Violation issued (ECB, closed)
Construction
05/11/2021
Violation issued (ECB, closed)
Construction
Latest 60 of 106 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offH.J. FLOOD INC.01/03/2023
DOB NOWSprinklersSigned-offH.J. FLOOD INC.07/07/2022
DOB NOWPlumbingSigned-offFLUID MECHANICS CORP06/13/2022
DOB NOWSprinklersSigned-offGW MECHANICAL CORP06/13/2022
DOB NOWGeneral ConstructionSigned-offSDBOV CONSTRUCTION INC06/01/2022
DOB NOWSidewalk ShedSigned-offRELIABLE ENTERPRISES INC06/08/2021
DOB NOWSupported ScaffoldSigned-offRELIABLE ENTERPRISES INC03/08/2021
DOB NOWSidewalk ShedSigned-offRELIABLE ENTERPRISES INC03/08/2021
DOB NOWSupported ScaffoldSigned-offRELIABLE ENTERPRISES INC03/17/2020
DOB NOWSidewalk ShedSigned-offRELIABLE ENTERPRISES INC03/12/2020
DOB NOWSidewalk ShedSigned-offRELIABLE ENTERPRISES INC02/19/2020
DOB NOWSidewalk ShedSigned-offHKS CONSTRUCTION CORP11/25/2019
BISEQISSUEDHYPER STRUCTURE CORP04/13/2021
BIS—ISSUEDHYPER STRUCTURE CORP04/13/2021
BISEQISSUEDHYPER STRUCTURE CORP01/06/2021
BIS—ISSUEDHYPER STRUCTURE CORP12/22/2020
BISPLISSUEDWATER DYNAMIC P & H CORP10/30/2020
BISPLISSUEDWATER DYNAMIC P & H CORP10/16/2020
BIS—ISSUEDHYPER STRUCTURE CORP05/11/2020
BIS—ISSUEDHYPER STRUCTURE CORP02/10/2020
BIS—ISSUEDHYPER STRUCTURE CORP02/10/2020
BIS—ISSUEDDCD CONSTRUCTION LLC02/04/2019
BIS—ISSUEDDCD CONSTRUCTION LLC02/04/2019
BISEQISSUEDDCD CONSTRUCTION LLC02/01/2019
BISPLISSUEDCOPPER SERVICES, LLC03/21/1994
BISOTISSUEDFLAGSHIP DINER INC01/28/1994
BISFPISSUEDLUND FIRE PRODUCTS11/29/1991
8 projects · most recent 01/25/2024
General Wiring
FiledStatusContractorScope
01/25/2024CompleteOHR CHODOSH ELEC'L CONT IGeneral Wiring
10/17/2022CompleteJANON ELECTRIC CORPGeneral Wiring
12/29/2021CompleteRONART ELECTRIC COGeneral Wiring
12/29/2021CompleteRONART ELECTRIC COGeneral Wiring
12/27/2021CompleteRONART ELECTRIC COGeneral Wiring
06/03/2021CompleteRICHARD NEU—
12/03/2020CompleteCAPUTEK ELEC'L SERVICES,—
11/22/2019CompleteWCK ELECTRIC CORP.—
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
01/12/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/04/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/20/2022Pass-Final General Construction Non-Directive 14PassView ↗
10/20/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/12/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/29/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
12/08/2022Energy Code Compliance InspectionsFrank Petrusoprogress
12/08/2022Energy Code Compliance InspectionsFrank Petrusoprogress
12/08/2022Interior lighting powerFrank Petrusoenergy_progress
12/08/2022Lighting controlsFrank Petrusoenergy_progress
12/08/2022Sprinkler SystemsLiangkai Xiaspecial
12/08/2022Fire-Resistant Penetrations and JointsFrank Petrusospecial
12/07/2022Sprinkler SystemsFrank Petrusospecial
12/07/2022Energy Code Compliance InspectionsFrank Petrusoprogress
05/28/2021FinalSunil Saigalprogress
03/04/2020FinalSunil Saigalprogress
▾Documents — 276 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch5
08/27/2026Q00532383-I1Request digital key ↗
08/26/2026Q00727123-I1Request digital key ↗
08/26/2026Q00727123-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed4
08/28/2026Q00270395-I1Request digital key ↗
08/28/2026Q00270395-P1Request digital key ↗
08/28/2026Q00314606-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold3
08/27/2026Q00330716-I1Request digital key ↗
08/15/2026Q00330716-P1Request digital key ↗
08/15/2026Q00330716-P2Request digital key ↗
▸Applications & Permits55
▸BISPLAN / WORK APPROVAL APPLICATION42
10/04/2023421838426Open ↗
03/02/2023421348624Open ↗
03/01/2023421348624Open ↗
Showing 3 of 42 on file for this type
▸BISWORK PERMIT APPLICATION12
01/07/2021421348624Open ↗
02/18/2020421348624Open ↗
02/18/2020421348624Open ↗
Showing 3 of 12 on file for this type
▸BISINTENT TO REVOKE APPROVAL/PERMIT1
07/12/2017421486804Open ↗
▸Zoning, Tax Lot & Property Records10
▸BISZONING DIAGRAM4
03/01/2022421348624Open ↗
10/21/2021421348624Open ↗
07/14/2021421348624Open ↗
Showing 3 of 4 on file for this type
▸BISADDRESS: NEW HOUSE NUMBER APPROVED2
08/10/2023421838426Open ↗
Showing 1 of 2 on file for this type
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
08/10/2023421838426Open ↗
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
08/10/2023421838426Open ↗
▸BISVERIFY TAX LOT1
07/22/2022421348624Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
03/22/2022421348624Open ↗
▸Seals & Professional Certifications30
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/28/2026Q00270395-I1Open ↗
08/28/2026Q00270395-P1Open ↗
08/28/2026Q00314606-P1Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
01/09/2019421348624Open ↗
01/09/2019421348624Open ↗
01/03/2019421348624Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026Q00727123-I1Open ↗
09/01/2026Q00727123-I1Open ↗
08/29/2026Q00727209-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026Q00727123-I1Open ↗
08/29/2026Q00727209-I1Open ↗
08/24/2026Q00727209-P1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment15
▸BISSCHEDULE B - PLUMBING4
12/16/2021421348624Open ↗
11/05/2021421348624Open ↗
10/26/2021421348624Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
10/23/2019421348624Open ↗
Showing 1 of 3 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
02/24/2022421576798Open ↗
02/24/2022421576805Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
02/08/2022421348624Open ↗
▸BISFIRE ALARM/SIGNAL SYSTEM (FA) SIGNOFF1
07/22/2022421348624Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
02/08/2022421348624Open ↗
▸BISSPRINKLER SYSTEMS1
02/08/2022421348624Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
03/22/2022421348624Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
03/22/2022421348624Open ↗
▸Safety & Tenant Protection5
▸BISSTREET TREE CHECKLIST2
08/10/2023421838426Open ↗
Showing 1 of 2 on file for this type
▸BISSTREET TREE SIGNOFF2
07/22/2022421348624Open ↗
04/14/2022421486804Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
01/09/2019421348624Open ↗
▸Environmental & Asbestos14
▸DOB NOWOER: Notice to Proceed9
08/28/2026Q00270395-I1Open ↗
08/28/2026Q00270395-P1Open ↗
08/13/2026Q00330716-P1Open ↗
Showing 3 of 9 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION2
03/31/2022421486804Open ↗
03/15/2022421348624Open ↗
▸DOB NOWOER: Notice of Satisfaction2
08/13/2026Q00330716-I1Open ↗
08/13/2026Q00314606-I1Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance16
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
01/09/2019421348624Open ↗
01/03/2019421348624Open ↗
01/03/2019421348624Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
08/10/2023421838426Open ↗
12/03/2021421348624Open ↗
10/20/2021421348624Open ↗
▸BIS* DUCT LEAKAGE TESTING1
02/08/2022421348624Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
03/22/2022421348624Open ↗
▸BISFENESTRATION AREAS1
03/22/2022421348624Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
03/22/2022421348624Open ↗
▸BISLIGHTING IN DWELLING UNITS1
02/08/2022421348624Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
03/22/2022421348624Open ↗
▸BISLIGHTING CONTROLS1
02/08/2022421348624Open ↗
▸BIS* HVAC INSULATION AND SEALING1
02/08/2022421348624Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026Q00727123-I1Open ↗
▸Inspections & Test Reports16
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX5
11/21/2019421348624Open ↗
08/20/2019421348624Open ↗
08/20/2019421348624Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY4
08/10/2023421838426Open ↗
02/14/2022421348624Open ↗
12/03/2021421348624Open ↗
Showing 3 of 4 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
03/22/2022421348624Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
03/22/2022421348624Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
03/22/2022421348624Open ↗
▸BISMASONRY1
03/22/2022421348624Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
03/22/2022421348624Open ↗
▸BISBORINGS / TEST PITS (TR-4) 27-7201
03/30/2019421348624Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
03/22/2022421348624Open ↗
▸Approvals, Objections & Sign-offs20
▸BISSCHEDULE A - OCCUPANCY / USE16
03/02/2023421348624Open ↗
03/01/2023421348624Open ↗
02/24/2023421348624Open ↗
Showing 3 of 16 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
10/23/2025421576805Open ↗
03/25/2022421576798Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Cost, Insurance & Ownership11
▸BISCOST AFFIDAVIT7
03/11/2022421576798Open ↗
03/11/2022421576805Open ↗
03/11/2022421576805Open ↗
Showing 3 of 7 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE2
02/18/2020421348624Open ↗
02/05/2019421348624Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW32
03/24/2022421576805Open ↗
03/24/2022421576798Open ↗
▸Filing & Intake Forms36
▸BISADDITIONAL INFORMATION25
08/10/2023421838426Open ↗
02/27/2023421348624Open ↗
02/16/2023421348624Open ↗
Showing 3 of 25 on file for this type
▸BISEFILING COVER SHEET8
10/04/2023421838426Open ↗
08/05/2021421486804Open ↗
11/22/2017421576798Open ↗
Showing 3 of 8 on file for this type
▸BISBOROUGH INTAKE FORM3
03/25/2021421348624Open ↗
01/07/2021421348624Open ↗
02/12/2018421348624Open ↗
▸Other Documents11
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION5
08/10/2023421838426Open ↗
03/24/2022421576805Open ↗
03/24/2022421576805Open ↗
Showing 3 of 5 on file for this type
▸BISSHUTOFF DAMPERS1
02/08/2022421348624Open ↗
▸BISMAINTENANCE INFORMATION1
02/08/2022421348624Open ↗
▸BISPERMANENT CERTIFICATE1
02/08/2022421348624Open ↗
▸BISON-SITE STORM WATER DRAIN. DISP. /DETENT INSTALL (DRYWELL)1
07/22/2022421348624Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
03/22/2022421348624Open ↗
▸BISENVIRONMENTAL "E" DEP NOTICE TO PROCEED1
On file, but not among the 200 most recently loaded documents for this source.