← Back
BuildNYC
Miscellaneous and old-style bank buildings
138-30 NORTHERN BOULEVARD
QUEENS · BIN 4624489
💬 Discuss this project
2023Year Built
—Stories
O9Building Class
R6Zoning
190,703 sfGross Floor Area
69Units
0 Active Violations
Miscellaneous and old-style bank buildings · Owner of record: Jingang Northern · 43,313 sf lot · 4.4 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsPersonnel and material hoist installation2 filings
RoofTemporary mini crane installation1 filing
Floor 10/4-'4- 458:.+84 22)1 filing
Site & exteriorTemporary sidewalk shed installation2 filings
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/14/2022$48.0M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
H Z Building NY4603/21/2026
Lombardo Professional Engineering103/21/2026
Howard I Shapiro Associates203/21/2026
AE Design Solution403/21/2026
Patuxent Engineering203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Construction MNGT. AAGeneral Contractor2407/08/2026
Construction MNGT. AAScaffold804/09/2026
Core Scaffold SystemsScaffold407/08/2026
Full Circle PlumbingFire Protection407/08/2026
Full Circle PlumbingPlumbing407/08/2026
Windham RestorationScaffold203/21/2026
JRL SkylineScaffold104/09/2026
DoriaScaffold107/08/2026
Doria ScaffoldingScaffold104/09/2026
KJK ElectricElectrical103/22/2026
S & Q ElevatorScaffold107/08/2026
Dynamic Plumbing & SprinklerFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Royal Construction P.E. S4622310/15/2026
Skyline Rigging7880203/26/2025
Building Lifecycle
All (163)Filed (32)Permit Issued (38)Signed Off (13)Violation (5)Inspection (11)Objection (34)Special Inspection (30)
10/15/2026
Filed — New Building
PROPOSED NEW BUILDING FOR COMMUNITY FACILITY USE. OBTAIN NEW C OF O.
Q08026751-B2
07/28/2026
Objection resolved — Addressed
07/17/2026
Signed off — New Building
PROPOSED NEW BUILDING FOR COMMUNITY FACILITY USE. OBTAIN NEW C OF O.
Q08026751-S4
07/17/2026
Signed off — New Building
PROPOSED NEW BUILDING FOR COMMUNITY FACILITY USE. OBTAIN NEW C OF O.
Q08026751-S6
07/16/2026
Signed off — New Building
PROPOSED NEW BUILDING FOR COMMUNITY FACILITY USE. OBTAIN NEW C OF O.
Q08026751-S5
07/16/2026
Signed off — New Building
PROPOSED NEW BUILDING FOR COMMUNITY FACILITY USE. OBTAIN NEW C OF O.
Q08026751-S7
05/06/2026
Objection raised — Other
05/04/2026
Filed — New Building
PROPOSED NEW BUILDING FOR COMMUNITY FACILITY USE. OBTAIN NEW C OF O.
Q08026751-B1
03/10/2026
Special inspection requirement — Concrete - Cast-In-Place
EBRAHIM MIANDOABI
03/10/2026
Special inspection requirement — Air barrier - visual inspection
EBRAHIM MIANDOABI
03/10/2026
Special inspection requirement — Vestibules
EBRAHIM MIANDOABI
03/10/2026
Special inspection requirement — Fenestration air leakage
EBRAHIM MIANDOABI
03/10/2026
Special inspection requirement — Subgrade Inspections
EBRAHIM MIANDOABI
03/10/2026
Special inspection requirement — Electrical motors and elevators
EBRAHIM MIANDOABI
03/10/2026
Special inspection requirement — Air barrier — testing
EBRAHIM MIANDOABI
03/10/2026
Special inspection requirement — Electrical motors and elevators
EBRAHIM MIANDOABI
03/10/2026
Special inspection requirement — Insulation placement and R values
EBRAHIM MIANDOABI
03/10/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
EBRAHIM MIANDOABI
03/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
EBRAHIM MIANDOABI
03/10/2026
Special inspection requirement — Masonry
EBRAHIM MIANDOABI
03/10/2026
Special inspection requirement — Energy Code Compliance Inspections
EBRAHIM MIANDOABI
03/10/2026
Special inspection requirement — Lowest Floor Elevation
EBRAHIM MIANDOABI
03/10/2026
Special inspection requirement — Air barrier - visual inspection
EBRAHIM MIANDOABI
03/10/2026
Special inspection requirement — Lighting controls
EBRAHIM MIANDOABI
03/10/2026
Special inspection requirement — Exterior lighting power
EBRAHIM MIANDOABI
03/10/2026
Special inspection requirement — Protection of exposed foundation insulation
EBRAHIM MIANDOABI
03/10/2026
Special inspection requirement — Interior lighting power
EBRAHIM MIANDOABI
03/10/2026
Special inspection requirement — Metering
EBRAHIM MIANDOABI
03/10/2026
Special inspection requirement — Fenestration areas
EBRAHIM MIANDOABI
03/10/2026
Special inspection requirement — Maintenance information
EBRAHIM MIANDOABI
03/10/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
EBRAHIM MIANDOABI
03/10/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
EBRAHIM MIANDOABI
03/10/2026
Special inspection requirement — Fenestration air leakage
EBRAHIM MIANDOABI
03/10/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
EBRAHIM MIANDOABI
03/10/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
SAMER ABOU-GHAIDA
03/10/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
EBRAHIM MIANDOABI
03/10/2026
Special inspection requirement — Fire-Resistance Rated Construction
EBRAHIM MIANDOABI
03/10/2026
Special inspection requirement — Metering
EBRAHIM MIANDOABI
01/21/2026
Signed off — New Building
PROPOSED NEW BUILDING FOR COMMUNITY FACILITY USE. OBTAIN NEW C OF O.
Q08026751-S1
01/21/2026
Signed off — New Building
PROPOSED NEW BUILDING FOR COMMUNITY FACILITY USE. OBTAIN NEW C OF O.
Q08026751-S2
01/21/2026
Signed off — New Building
PROPOSED NEW BUILDING FOR COMMUNITY FACILITY USE. OBTAIN NEW C OF O.
Q08026751-S3
01/07/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLDS PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS AND/OR OCCUPANCY WITH THIS APPLICATION.
Q01166383-I1
01/02/2026
Permit issued — Sprinklers
Q08026751-S5-EW-SD
12/31/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
12/31/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/16/2025
Signed off — Alteration
Q08021612-I1
12/15/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/15/2025
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
11/26/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01044320-I1
11/26/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/26/2025
Inspection — Pass-Final PL - More than 10 Requested Floors
Pass
View inspection ↗
11/24/2025
Inspection — Fail-Final PL - More than 10 Requested Floors
Fail
View inspection ↗
11/24/2025
Objection resolved — Addressed
11/20/2025
Objection raised — Other
11/20/2025
Objection resolved — Addressed
11/20/2025
Objection raised — Other
11/18/2025
Signed off — Alteration
Use of temporary telehandler construction equipment as per plans filed herewith. This application is filed in conjunction with NB-Q08026751.
Q01130620-I1
11/18/2025
Signed off — Alteration
INSTALLATION AND USE OF TEMPORARY MINI CRANE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
Q01235318-I1
11/11/2025
Filed — New Building
PROPOSED NEW BUILDING FOR COMMUNITY FACILITY USE. OBTAIN NEW C OF O.
Q08026751-A7
10/29/2025
Filed — New Building
PROPOSED NEW BUILDING FOR COMMUNITY FACILITY USE. OBTAIN NEW C OF O.
Q08026751-A4
Latest 60 of 163 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStandpipeSigned-offFull Circle Plumbing01/02/2026
DOB NOWPlumbingSigned-offFull Circle Plumbing10/24/2025
DOB NOWConstruction FenceSigned-offConstruction MNGT. AA09/30/2025
DOB NOWStandpipeSigned-offFull Circle Plumbing09/03/2025
DOB NOWGeneral ConstructionPermit IssuedConstruction MNGT. AA08/04/2025
DOB NOWProtection and Mechanical MethodsSigned-offJRL Skyline06/24/2025
DOB NOWSuspended ScaffoldPermit IssuedDoria Scaffolding06/11/2025
DOB NOWStandpipeSigned-offFull Circle Plumbing05/21/2025
DOB NOWSprinklersSigned-offFull Circle Plumbing05/19/2025
DOB NOWMechanical SystemsSigned-offConstruction MNGT. AA05/13/2025
DOB NOWPlumbingSigned-offFull Circle Plumbing05/08/2025
DOB NOWSidewalk ShedSigned-offCore Scaffold Systems04/29/2025
DOB NOWSuspended ScaffoldPermit IssuedWindham Restoration04/01/2025
DOB NOWGeneral ConstructionPermit IssuedConstruction MNGT. AA02/18/2025
DOB NOWGeneral ConstructionPermit IssuedConstruction MNGT. AA02/07/2025
DOB NOWSuspended ScaffoldPermit IssuedDoria01/14/2025
DOB NOWGeneral ConstructionPermit IssuedConstruction MNGT. AA12/26/2024
DOB NOWProtection and Mechanical MethodsSigned-offConstruction MNGT. AA10/22/2024
DOB NOWConstruction FenceSigned-offConstruction MNGT. AA10/08/2024
DOB NOWStandpipeSigned-offCitywide Plumbing, Heating & Sprinkler08/28/2024
DOB NOWProtection and Mechanical MethodsSigned-offS & Q Elevator08/05/2024
DOB NOWStructuralSigned-offConstruction MNGT. AA07/22/2024
DOB NOWGeneral ConstructionPermit IssuedConstruction MNGT. AA07/22/2024
DOB NOWPlumbingSigned-offFull Circle Plumbing05/07/2024
DOB NOWSidewalk ShedSigned-offCore Scaffold Systems05/01/2024
DOB NOWPlumbingSigned-offFull Circle Plumbing01/05/2024
DOB NOWEarth WorkSigned-offConstruction MNGT. AA11/16/2023
DOB NOWSupport of ExcavationSigned-offConstruction MNGT. AA11/16/2023
DOB NOWConstruction FenceSigned-offConstruction MNGT. AA11/03/2023
DOB NOWStructuralSigned-offConstruction MNGT. AA11/02/2023
DOB NOWGeneral ConstructionPermit IssuedConstruction MNGT. AA11/01/2023
DOB NOWStructuralSigned-offConstruction MNGT. AA10/23/2023
DOB NOWConstruction FenceSigned-offConstruction MNGT. AA10/19/2023
DOB NOWGeneral ConstructionPermit IssuedConstruction MNGT. AA10/12/2023
DOB NOWFoundationSigned-offConstruction MNGT. AA10/06/2023
DOB NOWGeneral ConstructionPermit IssuedConstruction MNGT. AA10/06/2023
DOB NOWSupport of ExcavationSigned-offConstruction MNGT. AA10/05/2023
DOB NOWConstruction FenceSigned-offConstruction MNGT. AA10/18/2022
1 project · most recent 10/15/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
10/15/2026Permit IssuedConstruction MNGT. AAHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Gree GMV-48WL/C-T(U) 4 tons · Vrf Outdoor ×33
GMV-VQ120WM/C-F(U) 8 tons · Vrf Outdoor ×7
GMV-V48WL/C-T(U) (2); GMV-V36WL/C-T(U) (2) 8 tons · Heat Pump Outdoor ×2
GMV-24WL/C-T(U) 2 tons · Vrf Outdoor ×1
GMV-V60WL/C-T(U) 5 tons · Vrf Outdoor ×1
Mitsubishi Electric PURY-EP168TNU-A 14 tons · Vrf Outdoor ×2
Ventilation
Fantech FG 4XL EC 80 CFM · Exhaust Fan ×58
FG 8 EC 150 CFM · Exhaust Fan ×3
Greenheck CSP-B110 70 CFM · Exhaust Fan ×27
AX-72-190- 0420-A75 14,000 CFM · Exhaust Fan ×2
CUE-140-VG 1,890 CFM · Exhaust Fan ×2
QEI-30 20,000 CFM · Exhaust Fan ×2
CUE-200-VG 4,500 CFM · Exhaust Fan ×1
1 project · most recent 10/15/2026
Sprinkler System
FiledStatusContractorScope
10/15/2026Signed-offFull Circle PlumbingSprinkler System
1 project · most recent 10/15/2026
Storm Water/Sanitary
FiledStatusContractorScope
10/15/2026Signed-offSunlight PlumbingStorm, Water/Sanitary
5 projects · most recent 03/14/2026
General Wiring
FiledStatusContractorScope
03/14/2026CompleteRightway ElectricalGeneral Wiring
03/17/2025CompleteKJK Electric—
09/11/2024CompleteRightway Electrical1 meters, 1 new_meters
07/29/2024CompleteKJK Electric—
05/22/2024CompleteSolas Electrical—
1 project · most recent 10/15/2026
Concrete Masonry
FiledStatusContractorScope
10/15/2026Signed-offFull Circle PlumbingConcrete, Masonry
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
12/31/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
12/31/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/15/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/15/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
11/26/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/26/2025Pass-Final PL - More than 10 Requested FloorsPassView ↗
11/24/2025Fail-Final PL - More than 10 Requested FloorsFailView ↗
08/07/2025Pass-Final PL - More than 10 Requested FloorsPassView ↗
11/29/2024Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)CertifiedView ↗
10/04/2024Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
10/04/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
03/10/2026VestibulesEBRAHIM MIANDOABIenergy_progress
03/10/2026Maintenance informationEBRAHIM MIANDOABIenergy_progress
03/10/2026Fenestration areasEBRAHIM MIANDOABIenergy_progress
03/10/2026Insulation placement and R valuesEBRAHIM MIANDOABIenergy_progress
03/10/2026MeteringEBRAHIM MIANDOABIenergy_progress
03/10/2026Interior lighting powerEBRAHIM MIANDOABIenergy_progress
03/10/2026Electrical motors and elevatorsEBRAHIM MIANDOABIenergy_progress
03/10/2026Protection of exposed foundation insulationEBRAHIM MIANDOABIenergy_progress
03/10/2026Exterior lighting powerEBRAHIM MIANDOABIenergy_progress
03/10/2026Air barrier — testingEBRAHIM MIANDOABIenergy_progress
03/10/2026Lighting controlsEBRAHIM MIANDOABIenergy_progress
03/10/2026Air barrier - visual inspectionEBRAHIM MIANDOABIenergy_progress
03/10/2026Fenestration and door U-factor and product ratingsEBRAHIM MIANDOABIenergy_progress
03/10/2026Interior lighting powerEBRAHIM MIANDOABIenergy_progress
03/10/2026VestibulesEBRAHIM MIANDOABIenergy_progress
03/10/2026Insulation placement and R valuesEBRAHIM MIANDOABIenergy_progress
03/10/2026Protection of exposed foundation insulationEBRAHIM MIANDOABIenergy_progress
03/10/2026Fenestration areasEBRAHIM MIANDOABIenergy_progress
03/10/2026Exterior lighting powerEBRAHIM MIANDOABIenergy_progress
03/10/2026Maintenance informationEBRAHIM MIANDOABIenergy_progress
03/10/2026Air barrier — testing EBRAHIM MIANDOABIenergy_progress
03/10/2026Lighting controlsEBRAHIM MIANDOABIenergy_progress
03/10/2026MeteringEBRAHIM MIANDOABIenergy_progress
03/10/2026Air barrier - visual inspectionEBRAHIM MIANDOABIenergy_progress
03/10/2026Electrical motors and elevatorsEBRAHIM MIANDOABIenergy_progress
Latest 25 of 150.
▾Documents — 286 on file (BIS + DOB NOW)
▸Plans & Drawings31
▸DOB NOWPlans/Sketch31
08/25/2026Q08021612-I1Request digital key ↗
08/21/2026Q01086850-I1Request digital key ↗
08/21/2026Q01130620-I1Request digital key ↗
Showing 3 of 31 on file for this type
▸Applications & Permits9
▸DOB NOWDEP Stormwater Construction Permit7
08/17/2026Q08026751-P2Open ↗
08/17/2026Q08026751-A1Open ↗
08/17/2026Q08026751-A3Open ↗
Showing 3 of 7 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
09/11/2024440818395Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
09/06/2024440818395Open ↗
▸Zoning, Tax Lot & Property Records15
▸DOB NOWZD1: DOB Zoning Diagram7
08/17/2026Q08026751-A3Open ↗
Showing 1 of 7 on file for this type
▸DOB NOWZoning Exhibit form (1-5)7
08/17/2026Q08026751-A1Open ↗
08/17/2026Q08026751-P2Open ↗
08/17/2026Q08026751-A3Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications165
▸DOB NOWSpecial Inspector Seal & Signature84
09/02/2026Q08026751-S3Open ↗
09/02/2026Q08026751-S3Open ↗
09/02/2026Q08026751-S3Open ↗
Showing 3 of 84 on file for this type
▸DOB NOWProgress Inspector Seal & Signature48
09/02/2026Q08026751-S3Open ↗
09/01/2026Q08026751-A1Open ↗
09/01/2026Q08026751-A1Open ↗
Showing 3 of 48 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature31
08/25/2026Q08021612-I1Open ↗
08/21/2026Q01130620-I1Open ↗
08/20/2026Q01166383-I1Open ↗
Showing 3 of 31 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
09/06/2024440818395Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/06/2024440818395Open ↗
▸Trade Schedules & Equipment8
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)7
08/17/2026Q08026751-A1Open ↗
08/17/2026Q08026751-I1Open ↗
08/17/2026Q08026751-A3Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWStandpipe Alarms Drawings1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection11
▸DOB NOWStreet Tree Checklist7
08/17/2026Q08026751-A1Open ↗
08/17/2026Q08026751-P2Open ↗
08/17/2026Q08026751-A3Open ↗
Showing 3 of 7 on file for this type
▸BISSTREET TREE CHECKLIST1
09/06/2024440818395Open ↗
▸DOB NOWStreet Tree Sign Off1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWStreet Trees Site Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance2
▸DOB NOWPreliminary Commissioning Report Certification2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Inspections & Test Reports14
▸DOB NOWSOIL REPORT11
08/17/2026Q08026751-A3Open ↗
08/17/2026Q08026751-P2Open ↗
08/17/2026Q08026751-P4Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
09/06/2024440818395Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
09/06/2024440818395Open ↗
▸Other Documents29
▸DOB NOWSite Survey: Initial7
08/17/2026Q08026751-P2Open ↗
08/17/2026Q08026751-A5Open ↗
Showing 2 of 7 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone7
08/17/2026Q08026751-A1Open ↗
08/17/2026Q08026751-A3Open ↗
08/17/2026Q08026751-A5Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProperty Ownership Certification7
08/17/2026Q08026751-A5Open ↗
08/17/2026Q08026751-A1Open ↗
08/17/2026Q08026751-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWCalculations2
08/20/2026Q01166383-I1Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWAdjoining Owners Notification2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWManufacturer's Specifications2
08/20/2026Q01166383-I1Open ↗
Showing 1 of 2 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION1
09/06/2024440818395Open ↗
▸DOB NOWFinal Survey1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type