1996Year Built
6Stories
D1Building Class
R7-1Zoning
65,313 sfGross Floor Area
66Units
LL97 CoveredRent Stabilized12 Open Violations ▸FDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: BARCLAY #2 REALTY CO · 15,620 sf lot · 4.18 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Cellar6p · 1 filing · 9 docs
Filed — no permit issued5p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BARCLAY 2 REALTY303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BAZINI ENGINEERING, P.C.212/04/2024
SIDERIS KEFALAS ENGINEERS PC109/25/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CHAMP PLUMBING & HTG CORPPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BAZINI ENGINEERING, P.C.1808212/04/2024
Building Lifecycle
All (80)Filed (3)Permit Issued (2)Signed Off (2)Violation (60)Inspection (2)Special Inspection (11)
07/06/2026
Violation issued (HPD, closed)
C
05/07/2026
Violation issued (HPD, closed)
A
03/02/2026
Violation issued (ECB, closed)
Elevators
12/29/2025
Violation issued (HPD, closed)
C
09/14/2025
Violation issued (HPD, open)
C
08/04/2025
Signed off — Alteration
CONNECT TO EXISTING GAS PIPING FOR REPLACEMENT GAS BURNER ON EXISTING BOILER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01142594-I1
07/23/2025
Signed off — Alteration
CONNECT TO EXISTING GAS PIPING FOR REPLACEMENT GAS BURNER ON EXISTING BOILER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01142594-S1
05/16/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/14/2025
Violation issued (HPD, closed)
A
05/14/2025
Violation issued (HPD, open)
B
05/12/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
05/07/2025
Violation issued (HPD, closed)
B
05/07/2025
Violation issued (HPD, closed)
B
05/07/2025
Violation issued (HPD, closed)
B
03/12/2025
Violation issued (HPD, open)
B
12/09/2024
Permit issued — Boiler Equipment
Q01142594-I1-BE
12/06/2024
Permit issued — Plumbing
Q01142594-S1-PL
12/04/2024
Filed — Alteration
CONNECT TO EXISTING GAS PIPING FOR REPLACEMENT GAS BURNER ON EXISTING BOILER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01142594-I1
12/04/2024
Filed — Alteration
CONNECT TO EXISTING GAS PIPING FOR REPLACEMENT GAS BURNER ON EXISTING BOILER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01142594-S1
12/03/2024
Special inspection requirement — HVAC-R and service water heating equipment
Joseph Bazini
12/03/2024
Special inspection requirement — HVAC-R and service water heating system controls
Joseph Bazini
12/03/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Joseph Bazini
11/14/2024
Special inspection requirement — Tenant Protection Plan Compliance
Joseph Bazini
11/14/2024
Special inspection requirement — Tenant Protection Plan Compliance
Joseph Bazini
09/25/2024
Filed — Alteration
Removal of existing gas-fired boiler, water heater, and abandoned oil tank. Installation of new gas-fired boilers and indirect water heaters. No change to use, occupancy or egress associated with this application.
Q01108099-I1
09/25/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/24/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
09/24/2024
Special inspection requirement — Tenant Protection Plan Compliance
09/24/2024
Special inspection requirement — HVAC-R and service water heating system controls
09/24/2024
Special inspection requirement — HVAC-R and service water heating equipment
09/24/2024
Special inspection requirement — Maintenance information
05/16/2024
Violation issued (HPD, closed)
A
05/16/2024
Violation issued (HPD, closed)
A
04/19/2024
Violation issued (HPD, closed)
C
03/27/2024
Violation issued (HPD, closed)
A
03/27/2024
Violation issued (HPD, closed)
A
02/19/2024
Violation issued (HPD, closed)
C
02/19/2024
Violation issued (HPD, closed)
C
02/19/2024
Violation issued (HPD, closed)
C
12/31/2023
Violation issued (HPD, open)
B
12/31/2023
Violation issued (HPD, open)
C
12/31/2023
Violation issued (HPD, closed)
A
11/08/2023
Violation issued (ECB, closed)
Elevators
11/02/2023
Violation issued (ECB, closed)
Elevators
10/27/2023
Violation issued (ECB, closed)
Elevators
09/23/2023
Violation issued (ECB, closed)
Elevators
09/15/2023
Violation issued (ECB, closed)
Elevators
08/29/2023
Violation issued (ECB, closed)
Elevators
04/17/2023
Violation issued (HPD, closed)
B
04/17/2023
Violation issued (HPD, closed)
A
02/24/2023
Violation issued (HPD, closed)
C
02/04/2023
Violation issued (HPD, closed)
C
02/04/2023
Violation issued (HPD, closed)
A
02/04/2023
Violation issued (HPD, closed)
A
02/04/2023
Violation issued (HPD, closed)
A
02/04/2023
Violation issued (HPD, closed)
A
02/04/2023
Violation issued (HPD, closed)
C
02/04/2023
Violation issued (HPD, closed)
C
10/14/2022
Violation issued (HPD, closed)
B
10/14/2022
Violation issued (HPD, closed)
A
Latest 60 of 80 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offCHAMP PLUMBING & HTG CORP12/09/2024
DOB NOWPlumbingSigned-offCHAMP PLUMBING & HTG CORP12/06/2024
BISOTISSUEDBEST ENERGY POWER 2015 LL10/04/2016
BISPLISSUEDMEDCO PLUMBING INC05/09/1996
BIS—ISSUEDBANTA HOMES CORP04/12/1996
BISEQISSUEDBANTA HOMES CORP.04/12/1996
BISPLISSUEDMEDCO PLUMBING INC11/01/1995
BISEQISSUEDBANIA HOMES CORP05/31/1995
BIS—ISSUEDBANIA HOMES CORP05/31/1995
BISEQISSUEDZZI MANAGEMENT CORP03/17/1995
BIS—ISSUEDZZI MANAGEMENT CORP03/17/1995
BISEQRE-ISSUEDBANTA HOMES CORP.01/24/1995
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
05/16/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/12/2025Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
12/03/2024HVAC-R and service water heating equipmentJoseph Bazinienergy_progress
12/03/2024HVAC-R and service water heating system controlsJoseph Bazinienergy_progress
12/03/2024HVAC-R and service water piping design and insulationJoseph Bazinienergy_progress
11/14/2024Tenant Protection Plan ComplianceJoseph Bazinispecial
11/14/2024Tenant Protection Plan ComplianceJoseph Bazinispecial
09/25/2024Fire-Resistant Penetrations and Joints—special
09/24/2024HVAC-R and service water piping design and insulation—energy_progress
09/24/2024Tenant Protection Plan Compliance—special
09/24/2024HVAC-R and service water heating system controls—energy_progress
09/24/2024HVAC-R and service water heating equipment—energy_progress
09/24/2024Maintenance information—energy_progress
▾Documents — 34 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/21/2026Q01108099-I1Request digital key ↗
08/21/2026Q01142594-I1Request digital key ↗
08/21/2026Q01142594-S1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
05/19/2016440310361Open ↗
▸BISWORK PERMIT APPLICATION1
10/04/2016440310361Open ↗
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/21/2026Q01108099-I1Open ↗
08/13/2026Q01142594-I1Open ↗
08/13/2026Q01142594-S1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/23/2026Q01142594-I1Open ↗
09/23/2026Q01142594-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/23/2026Q01142594-I1Open ↗
08/25/2026Q01142594-S1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
05/19/2016440310361Open ↗
▸Trade Schedules & Equipment1
▸BISFA - FDNY APPROVAL : FD-FAA1
09/29/2016440310361Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
05/19/2016440310361Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
05/19/2016440310361Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
03/16/2017440310361Open ↗
05/19/2016440310361Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
03/16/2017440310361Open ↗
▸BISSOLAR TAX ABATEMENT APPLICATION1
03/16/2017440310361Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
05/19/2016440310361Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026Q01142594-I1Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY4
03/16/2017440310361Open ↗
10/04/2016440310361Open ↗
10/04/2016440310361Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs3
▸BISLETTERS - SUPPORTING DOCUMENTATION1
03/16/2017440310361Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
03/16/2017440310361Open ↗
▸BISUtility Company PV System Interconnection Acknowledgement Letter1
03/16/2017440310361Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
03/16/2017440310361Open ↗
05/19/2016440310361Open ↗
▸Filing & Intake Forms2
▸BISADDITIONAL INFORMATION1
09/29/2016440310361Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
05/19/2016440310361Open ↗
▸Other Documents1
▸BISTax Abatement Miscellaneous1
03/16/2017440310361Open ↗