1 Active Violation 0 unresolved · 1 paperwork only ▸
Church, synagogue, chapel · 35,000 sf lot · 0.52 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof2 filings
Site & exterior2 filings
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Rocklyn Asset1407/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KZ Engineering104/10/2024
Zaskorski & Associates Architects108/23/2023
JWM Group107/15/2022
Kems Engineering and Construction103/16/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Archetype Consultants203/21/2026
Lewsan Consulting203/21/2026
Synergy Building Consultants103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Victoria Consulting & DevelopmentGeneral Contractor407/08/2026
Victoria Consulting & DevelopmentScaffold307/08/2026
Pittelli Electric ContElectrical103/21/2026
Craine Air Conditioningspecialty_contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JWM Group3550107/15/2022
CL Engineering6781103/16/2022
Building Lifecycle
All (57)Filed (4)Permit Issued (4)Signed Off (4)Violation (8)Objection (6)Special Inspection (14)
08/11/2026
Boiler inspection report filed
Subsequent · no defects · Accepted
05/29/2026
Boiler inspection report filed
Initial · defects found · Accepted
05/05/2026
Closed: Local law 62/91 - boilers: boiler (DOB violation)
DOB violation · closed on the city's record
04/15/2026
Boiler inspection report filed
Initial · no defects · Accepted
02/27/2025
Boiler inspection report filed
Initial · defects found · Accepted
02/27/2025
Boiler inspection report filed
Initial · no defects · Accepted
12/30/2024
Signed off — Alteration
ARCHITECTURAL ALTERATION AT 1ST FLOOR FLOOR ASSOCIATED WITH NEW STAIR AND RAMP ENTRANCE. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
Q00915312-I1
11/20/2024
Signed off — Alteration
Installation of temporary construction fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q01025436-I1
06/17/2024
Boiler inspection report filed
Initial · defects found · Accepted
05/06/2024
Permit renewed — General Construction
Renewed without changes
Q00915312-I1-GC
05/06/2024
Permit renewed — Construction Fence
Renewed without changes
Q01025436-I1-FN
04/10/2024
Filed — Alteration
Installation of temporary construction fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q01025436-I1
04/10/2024
Permit issued — Construction Fence
Q01025436-I1-FN
03/20/2024
@active exterior grade level alt site observe open pit excavation with excavator adjacent to temporary pedestrian walkway with no job fence in…
ECB violation · closed
12/28/2023
Permit issued — General Construction
Q00915312-I1-GC
11/17/2023
Boiler inspection report filed
Initial · no defects · Accepted
09/22/2023
Objection resolved — Addressed
09/14/2023
Objection resolved — Addressed
09/14/2023
Special inspection requirement — Exterior lighting power
CARLO ZASKORSKI
08/30/2023
Objection raised — Scope
08/30/2023
Objection raised — Energy
08/23/2023
Filed — Alteration
ARCHITECTURAL ALTERATION AT 1ST FLOOR FLOOR ASSOCIATED WITH NEW STAIR AND RAMP ENTRANCE. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
Q00915312-I1
08/07/2023
Special inspection requirement — Final
CARLO ZASKORSKI
09/14/2022
Signed off — Alteration
Install new two (2) AC units and new ducts on roof.
Q00673437-I1
08/18/2022
Signed off — Alteration
Installation of steel dunnage and parapet railing on the roof as indicated on drawings.
Q00746282-I1
08/09/2022
Permit issued — Curb Cut
Q00746282-I1-ST
07/19/2022
Objection raised — Scope
07/19/2022
Objection resolved — Addressed
07/15/2022
Filed — Alteration
Installation of steel dunnage and parapet railing on the roof as indicated on drawings.
Q00746282-I1
05/26/2022
Special inspection requirement — Masonry
JERRY MISIEWICZ
05/26/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
JERRY MISIEWICZ
05/26/2022
Special inspection requirement — Structural Steel - Details
JERRY MISIEWICZ
05/26/2022
Special inspection requirement — Structural Steel - High Strength Bolting
JERRY MISIEWICZ
05/26/2022
Special inspection requirement — Final
JERRY MISIEWICZ
03/18/2022
Permit issued — Mechanical Systems
Q00673437-I1-MS
03/16/2022
Filed — Alteration
Install new two (2) AC units and new ducts on roof.
Q00673437-I1
03/16/2022
Special inspection requirement — Maintenance information
Steven Bendoraitis
03/16/2022
Special inspection requirement — Energy Code Compliance Inspections
Steven Bendoraitis
03/16/2022
Special inspection requirement — HVAC-R and service water heating system controls
Steven Bendoraitis
03/16/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Bendoraitis
03/16/2022
Special inspection requirement — HVAC-R and service water heating equipment
Steven Bendoraitis
02/09/2022
Boiler inspection report filed
Initial · no defects · Accepted
02/02/2022
Special inspection requirement — Final
Steven Bendoraitis
02/02/2022
Special inspection requirement — Mechanical Systems
CHRISTIAN LOZADA
01/26/2021
Boiler inspection report filed
Initial · no defects · Accepted
08/26/2020
Boiler inspection report filed
Subsequent · no defects · Accepted
07/07/2020
Boiler inspection report filed
Initial · no defects · Accepted
06/16/2020
Boiler inspection report filed
Initial · defects found · Accepted
04/11/2019
Boiler inspection report filed
Initial · no defects · Accepted
02/05/2019
Boiler inspection report filed
Initial · no defects · Accepted
02/02/2018
Boiler inspection report filed
Initial · no defects · Accepted
08/05/2015
Closed: Violation issued for failure to file annual boiler 2012 inspection report
DOB violation · closed on the city's record
05/15/2014
Violation issued for failure to file annual boiler 2012 inspection report
DOB violation · closed · Issued 2014; DOB's record still lists it as active
03/26/2013
Closed: Local law 62/91 - boilers: boiler (DOB violation)
DOB violation · closed on the city's record
07/12/2007
Failure to comply w/ the commissioner's order to correct the violatingcondition & file a certificate of correction w/ the NYC DOB for noticeof…
ECB violation · open
02/27/2001
Local law 62/91 - boilers: boiler (DOB violation)
DOB violation · closed · Issued 2001; DOB's record still lists it as active
05/04/1998
Local law 62/91 - boilers: boiler (DOB violation)
DOB violation · closed · Issued 1998; DOB's record still lists it as active
Nothing on file for this building.
Nothing on file for this building.
▾Documents — 93 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/26/2026Q00673437-I1Request the plans ↗
08/24/2026Q00915312-I1Request the plans ↗
08/23/2026Q01025436-I1Request the plans ↗
Showing 3 of 4 on file for this type
▸Applications & Permits19
▸BISWORK PERMIT APPLICATION15
09/25/2019421358266Open ↗
04/02/2014420786876Open ↗
04/02/2014420517079Open ↗
Showing 3 of 15 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION4
08/28/2019421358266Open ↗
11/15/2012420786876Open ↗
12/21/2011420517079Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications27
▸DOB NOWProgress Inspector Seal & Signature9
08/25/2026Q00915312-I1Open ↗
08/25/2026Q00915312-I1Open ↗
08/24/2026Q00673437-I1Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
08/28/2019421358266Open ↗
09/26/2017420511510Open ↗
10/09/2014420517079Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/24/2026Q00673437-I1Open ↗
08/23/2026Q00746282-I1Open ↗
08/23/2026Q00746282-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/26/2026Q00673437-I1Open ↗
08/13/2026Q00915312-I1Open ↗
08/13/2026Q01025436-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
11/15/2012420786876Open ↗
12/21/2011420517079Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
11/15/2012420786876Open ↗
12/21/2011420517079Open ↗
▸Environmental & Asbestos9
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
08/28/2019421358266Open ↗
11/15/2012420786876Open ↗
11/15/2012420786876Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/26/2026Q00673437-I1Open ↗
08/13/2026Q00915312-I1Open ↗
08/13/2026Q00746282-I1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
12/21/2011420517079Open ↗
12/09/2011420511510Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
09/25/2019421358266Open ↗
08/28/2019421358266Open ↗
09/26/2017420511510Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
03/28/2025421358266Open ↗
09/26/2017420511510Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
03/28/2025421358266Open ↗
▸BISTECHNICAL REPORT: ENERGY1
12/09/2011420511510Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026Q00673437-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026Q00673437-I1Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
03/28/2025421358266Open ↗
▸Approvals, Objections & Sign-offs14
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter4
08/13/2026Q00673437-I1Open ↗
08/13/2026Q00915312-I1Open ↗
08/13/2026Q00746282-I1Open ↗
Showing 3 of 4 on file for this type
▸BISSUPERSEDING LETTER3
09/24/2013420786876Open ↗
09/24/2013420517079Open ↗
09/24/2013420511510Open ↗
▸BISADMINISTRATIVE OBJECTIONS3
11/15/2012420786876Open ↗
12/21/2011420517079Open ↗
12/09/2011420511510Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
08/28/2019421358266Open ↗
11/15/2012420786876Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
03/31/2025421358266Open ↗
10/09/2014420517079Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
03/28/2025421358266Open ↗
08/28/2019421358266Open ↗
09/26/2017420511510Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms6
▸BISEFILING COVER SHEET4
08/28/2019421358266Open ↗
11/15/2012420786876Open ↗
12/21/2011420517079Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM1
10/26/2017420511510Open ↗
▸BISADDITIONAL INFORMATION1
09/11/2019421358266Open ↗