← Back
Car wash or lubritorium facility
138-77 QUEENS BOULEVARD
QUEENS · BIN 4206501
💬 Discuss this project
1939Year Built
1Stories
GWBuilding Class
R6BZoning
6,658 sfGross Floor Area
1Units
1 Open Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Car wash or lubritorium facility · Owner of record: 138-77 QUEENS BLVD LLC · 6,658 sf lot · 1 FAR built · Flood zone X
Locations of Work
Structural
Roof10p · 1 filing · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
113-31 SPRINGFIELD BLVD1407/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ASR ENGINEERING PC111/14/2024
STRUCTURAL ENGINEERING SYSTEMS, PLL209/30/2024
CD ARCHITECT STUDIO, LLP201/28/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CD ARCHITECT STUDIO803/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FANTASTIC RENOVATIONS &General Contractor407/08/2026
RICHARD NEUElectrical103/22/2026
TOPLINE NYC INCGeneral Contractor107/08/2026
PLUMB-IT MECHANICAL INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519102/17/2024
CD ARCHITECT STUDIO, LLP2573201/28/2024
Building Lifecycle
All (41)Filed (5)Permit Issued (4)Signed Off (2)Violation (8)Inspection (3)Objection (10)Special Inspection (9)
09/17/2025
Signed off — Alteration
REMOVE ONE BAY OF ROOF JOISTS AND INSTALL NEW METAL ROOF JOISTS. N CHANGE IN USE, EGRESS NOR OCCUPANCY.
Q00995388-S1
03/17/2025
Signed off — Alteration
REMOVE ONE BAY OF ROOF JOISTS AND INSTALL NEW METAL ROOF JOISTS. N CHANGE IN USE, EGRESS NOR OCCUPANCY.
Q00995388-I1
03/10/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/05/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
01/17/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
12/11/2024
Permit issued — Plumbing
Q00995388-S1-PL
12/03/2024
Permit issued — Structural
Q00995388-S2-ST
11/15/2024
Permit issued — Sidewalk Shed
Q01138107-I1-SH
11/14/2024
Filed — Alteration
Q01138107-I1
11/12/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
11/12/2024
Special inspection requirement — Structural Cold-Formed Steel
Younes Abouyaala
11/12/2024
Special inspection requirement — Structural Steel - Details
Younes Abouyaala
11/12/2024
Special inspection requirement — Final
NAVEEN KUMAR
11/04/2024
Objection resolved — Addressed
11/04/2024
Objection resolved — Addressed
10/10/2024
Objection raised — Admin
10/10/2024
Objection raised — Structural
10/08/2024
Permit issued — General Construction
Q00995388-I1-GC
09/30/2024
Filed — Alteration
REMOVE ONE BAY OF ROOF JOISTS AND INSTALL NEW METAL ROOF JOISTS. N CHANGE IN USE, EGRESS NOR OCCUPANCY.
Q00995388-P1
09/26/2024
Special inspection requirement — Structural Cold-Formed Steel
09/26/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
09/26/2024
Special inspection requirement — Structural Steel - Details
09/26/2024
Special inspection requirement — Final
09/12/2024
Objection resolved — Addressed
09/12/2024
Objection resolved — Addressed
03/10/2024
Objection resolved — Addressed
02/26/2024
Objection raised — Other
02/26/2024
Objection raised — Other
02/17/2024
Filed — Alteration
REMOVE ONE BAY OF ROOF JOISTS AND INSTALL NEW METAL ROOF JOISTS. N CHANGE IN USE, EGRESS NOR OCCUPANCY.
Q00995388-S2
02/09/2024
Objection raised — Other
01/28/2024
Filed — Alteration
REMOVE ONE BAY OF ROOF JOISTS AND INSTALL NEW METAL ROOF JOISTS. N CHANGE IN USE, EGRESS NOR OCCUPANCY.
Q00995388-S1
01/28/2024
Filed — Alteration
REMOVE ONE BAY OF ROOF JOISTS AND INSTALL NEW METAL ROOF JOISTS. N CHANGE IN USE, EGRESS NOR OCCUPANCY.
Q00995388-I1
01/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Peter D'Angelo
06/15/2021
Violation issued (FDNY_NOV, closed)
06/14/2021
Violation issued (FDNY_NOV, closed)
10/30/2019
Violation issued (FDNY_NOV, closed)
10/30/2019
Violation issued (FDNY_NOV, closed)
10/30/2019
Violation issued (FDNY_NOV, closed)
04/16/2019
Violation issued (FDNY_NOV, closed)
09/16/1999
Violation issued (ECB, open)
Construction
05/24/1988
Violation issued (FDNY_NOV, closed)
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offJVR PLBG AND HEATING INC12/11/2024
DOB NOWStructuralPermit IssuedFANTASTIC RENOVATIONS &12/03/2024
DOB NOWSidewalk ShedPermit IssuedTOPLINE NYC INC11/15/2024
DOB NOWGeneral ConstructionSigned-offFANTASTIC RENOVATIONS &10/08/2024
2 projects · most recent 11/16/2024
General Wiring
FiledStatusContractorScope
11/16/2024Permit IssuedRICHARD NEU—
09/19/2019CompleteACCURATE ELEC'L CORP.General Wiring
1 project · most recent 09/30/2024
Steel
FiledStatusContractorScope
09/30/2024Signed-offJVR PLBG AND HEATING INCSteel
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
03/10/2025Pass-Final General Construction Non-Directive 14PassView ↗
02/05/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
01/17/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
11/12/2024Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
11/12/2024Structural Cold-Formed SteelYounes Abouyaalaspecial
11/12/2024Structural Steel - DetailsYounes Abouyaalaspecial
11/12/2024FinalNAVEEN KUMARprogress
09/26/2024Structural Cold-Formed Steel—special
09/26/2024Structural Stability – Alterations of existing buildings—special
09/26/2024Structural Steel - Details—special
09/26/2024Final—progress
01/26/2024Fire-Resistant Penetrations and JointsPeter D'Angelospecial
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/23/2026Q00995388-S1Request digital key ↗
08/23/2026Q00995388-I1Request digital key ↗
08/23/2026Q00995388-S2Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/13/2026Q00995388-S1Open ↗
08/13/2026Q00995388-P1Open ↗
08/13/2026Q00995388-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/26/2026Q00995388-S1Open ↗
08/22/2026Q00995388-S2Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/22/2026Q00995388-S2Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/13/2026Q00995388-P1Open ↗
08/13/2026Q00995388-I1Open ↗
08/13/2026Q00995388-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/13/2026Q00995388-S1Open ↗
08/13/2026Q00995388-S2Open ↗