← Back
BuildNYC
Two stories - detached, small or mid-size
138 PRESCOTT AVENUE
STATEN ISLAND · BIN 5052021
💬 Discuss this project
1920Year Built
1.67Stories
A1Building Class
R3XZoning
788 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 4,000 sf lot · 0.2 FAR built · Flood zone X
Locations of Work
ArchitectureGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Floor 1Plumbing and extensionUnder Construction5p · 2 filings · 20 docs
Filed — no permit issued1p · 1 filing · 2 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Steven R. Savino Architect308/11/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Christian ConstructionGeneral Contractor107/10/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Steven R. Savino1216103/04/2026
Building Lifecycle
08/11/2026
Filed — Alteration
PLUMBING WORK IN CONJUNCTION TO THE 1ST STORY HORIZONTAL EXTENSION.
S01312116-I1
07/08/2026
Permit issued — General Construction
S01312073-I1-GC
03/31/2026
Objection resolved — Resolved
03/30/2026
Objection raised — Cost
03/04/2026
Filed — Alteration
CONSTRUCTION OF A HORIZONTAL EXTENSION TO THE FIRST FLOOR AT THE REAR OF THE HOUSE.
S01312073-I1
21 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedChristian Construction07/08/2026
1 project · most recent 08/11/2026
Gas Water/Sanitary
FiledStatusContractorScope
08/11/2026——Gas, Water/Sanitary
1 project · most recent 08/11/2026
FiledStatusContractorScope
08/11/2026———
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
02/03/2026Air barrier - visual inspectionSteven Savinoenergy_progress
02/03/2026Subsurface Investigations (Borings/Test Pits)anthony santorospecial
11/06/2025Permanent certificateSteven Savinoenergy_progress
11/06/2025Insulation placement and R valuesSteven Savinoenergy_progress
11/06/2025Fenestration air leakageSteven Savinoenergy_progress
11/06/2025Fenestration areasSteven Savinoenergy_progress
11/06/2025Lighting in dwelling unitsSteven Savinoenergy_progress
11/06/2025Fenestration and door U-factor and product ratingsSteven Savinoenergy_progress
10/31/2025Fire-Resistance Rated ConstructionSteven Savinoprogress
10/31/2025Fire-Resistant Penetrations and JointsSteven Savinospecial
10/31/2025Structural Stability – Alterations of existing buildingsSteven Savinospecial
10/31/2025Subgrade InspectionsSteven Savinospecial
10/31/2025FinalSteven Savinoprogress
10/31/2025Energy Code Compliance InspectionsSteven Savinoprogress
10/31/2025Concrete - Cast-In-PlaceSteven Savinospecial
24 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account