← Back
Condo, residential unit in elevator building
Loft 124 Condominium
138 WEST 124 STREET · BIN 1087462
💬 Discuss this project
2006Year Built
12Stories
R4Building Class
C4-4Zoning
35,483 sfGross Floor Area
21Units
LL97 CoveredRent Stabilized0 Open ViolationsFISP: SWARMPFDNY Report ↗
Condo, residential unit in elevator building · 5,046 sf lot · 7.03 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Floor 12p · 2 filings · 10 docs
Cellar2p · 1 filing · 8 docs
Sub-Cellar1p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DERMER MANAGEMENT1607/08/2026
UNIVERSAL SYSTEMS INC.503/22/2026
LOFT 124203/22/2026
Z BARCLAY GROUP NYC103/22/2026
LOFT 124 CONDOMINIUM603/22/2026
BLESSO PROPERTIES703/22/2026
LENOX 1241303/22/2026
OWNER OF 140 WEST 124 ST203/22/2026
LENOX 124 LLC SIG103/22/2026
OWNER OF PREMISES 138 W.103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ASHRAF CORP205/08/2025
LANE ENGINEERING CONSULTING, P.C.303/04/2025
NAVI STRUCTURAL ENGINEERING, PLLC111/07/2023
ENTHINK ENGINEERS LLC204/15/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS303/21/2026
EUROCELT EXPEDITING, INC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JK RESTORATION CORPGeneral Contractor304/09/2026
UNIVERSAL SYSTEMS INCGeneral Contractor303/21/2026
PHOENIX SUTTON STR INCGeneral Contractor307/08/2026
ELPO ELECTRICAL CONTG INCElectrical203/22/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor207/08/2026
GREGORY PAPANTONIOUElectrical103/21/2026
MANZUR FLORES, JORGEElectrical103/21/2026
JOSEPH SORTINOElectrical103/21/2026
VICTOR, ALLANElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AK CONSULTING SERVICES, I6198203/04/2025
LANE ENGINEERING CONSULTI2967201/29/2025
ENTHINK ENGINEERS LLC6247104/15/2022
Building Lifecycle
All (101)Filed (8)Permit Issued (7)Signed Off (5)Facade (FISP) (13)Violation (60)Special Inspection (8)
01/27/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01219727-I1
01/27/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY PLYWOOD ENCLOSURE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE.
M01219728-I1
05/09/2025
Permit issued — Sidewalk Shed
M01219727-I1-SH
05/09/2025
Permit issued — Protection and Mechanical Methods
M01219728-I1-PMM
05/08/2025
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01219727-I1
05/08/2025
Filed — Alteration
INSTALLATION OF TEMPORARY PLYWOOD ENCLOSURE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE.
M01219728-I1
04/08/2025
Permit issued — General Construction
M01152700-I1-GC-CX
03/04/2025
Filed — Alteration
SIDEWALK VAULT REPLACEMENT AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01152700-P1
02/28/2025
Special inspection requirement — Concrete - Cast-In-Place
MAHFUZAR RAHMAN
02/28/2025
Special inspection requirement — Masonry
MAHFUZAR RAHMAN
02/28/2025
Special inspection requirement — Structural Steel - Details
MAHFUZAR RAHMAN
02/28/2025
Special inspection requirement — Structural Steel - High Strength Bolting
MAHFUZAR RAHMAN
02/28/2025
Special inspection requirement — Structural Steel - Welding
MAHFUZAR RAHMAN
02/28/2025
Special inspection requirement — Tenant Protection Plan Compliance
02/28/2025
Special inspection requirement — Final
Douglas Lane
01/29/2025
Filed — Alteration
SIDEWALK VAULT REPLACEMENT AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01152700-I1
01/25/2025
Violation issued (FDNY_NOV, closed)
01/25/2025
Violation issued (FDNY_NOV, closed)
01/25/2025
Violation issued (FDNY_NOV, closed)
09/12/2024
Violation issued (HPD, closed)
A
08/02/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/24/2024
Signed off — Alteration
M00932918-I1
05/02/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/06/2023
Permit issued — General Construction
M00932918-I1-GC
11/08/2023
Permit issued — Sidewalk Shed
M00958563-I1-SH
11/07/2023
Filed — Alteration
M00958563-I1
10/09/2023
Filed — Alteration
M00932918-I1
02/21/2023
Cycle 9 facade report submitted
02/21/2023
Cycle 9 facade report signed — SWARMP
02/20/2023
Cycle 9 facade inspection completed
11/10/2022
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00719906-I1
11/10/2022
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M00717801-I1
04/15/2022
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00719906-I1
04/15/2022
Permit issued — Supported Scaffold
M00719906-I1-SF
04/15/2022
Special inspection requirement — Post-installed Anchors
Sunil Saigal
04/13/2022
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M00717801-I1
04/13/2022
Permit issued — Sidewalk Shed
M00717801-I1-SH
06/23/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/02/2021
Violation issued (HPD, closed)
A
03/25/2021
Violation issued (ECB, closed)
Construction
08/03/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/03/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/22/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/06/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/02/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/07/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/17/2017
Violation issued (ECB, closed)
Elevators
09/18/2017
Violation issued (ECB, closed)
Local Law
03/15/2017
Cycle 8 facade report signed — SAFE
03/13/2017
Cycle 8 facade inspection completed
02/08/2017
Cycle 8 facade report submitted
01/03/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/29/2016
Cycle 7 facade report submitted
12/08/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/26/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/09/2012
Cycle 7 facade report submitted
08/09/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/06/2012
Cycle 7 facade report signed — UNSAFE
07/18/2012
Violation issued (ECB, closed)
Unknown
Latest 60 of 101 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC05/09/2025
DOB NOWProtection and Mechanical MethodsSigned-offANDAMIO SCAFFOLDING LLC05/09/2025
DOB NOWGeneral ConstructionPermit IssuedJK RESTORATION04/08/2025
DOB NOWGeneral ConstructionSigned-offJK RESTORATION12/06/2023
DOB NOWSidewalk ShedPermit IssuedUNIVERSAL SYSTEMS INC11/08/2023
DOB NOWSupported ScaffoldSigned-offPHOENIX SUTTON STR INC04/15/2022
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC04/13/2022
BISOTISSUEDZ BARCLAY GROUP NYC CORP10/12/2021
BISOTISSUEDZ BARCLAY GROUP NYC CORP01/29/2021
BISOTISSUEDZ BARCLAY GROUP NYC CORP11/24/2020
BISEQISSUEDSPRING SCAFFOLDING LLC11/07/2016
BISOTISSUEDROMO CONSTRUCTION CORP04/12/2016
BISEQISSUEDSPRING SCAFFOLDING LLC12/28/2015
BISOTISSUEDROMO CONSTRUCTION CORP04/22/2015
BISEQISSUEDSPRING SCAFFOLDING LLC12/30/2014
BISOTISSUEDROMO CONSTRUCTION CORP11/12/2014
BISEQISSUEDSPRING SCAFFOLDING LLC12/27/2013
BISEQISSUEDSPRING SCAFFOLDING LLC01/16/2013
BISEQISSUEDSPRING SCAFFOLDING LLC08/14/2012
BISEQISSUEDREPUBLIC SCAFFOLD CORP11/03/2011
BISEQISSUEDADVANCED CONSTRUCTION EQUIPMENT01/31/2011
BISEQISSUEDADVANCED INSTALLATIONS IN09/24/2010
BISPLISSUEDTMS PLMBG & HTG CORP11/15/2007
BISPLISSUEDMARATHON MECHANICAL LLC11/02/2007
BISEQISSUEDVERTICLE DESIGN CONST. CORP08/10/2007
BIS—ISSUEDVERTICLE DESIGN CONST. CORP08/10/2007
BISEQISSUEDPERIMETER BRIDGE SCAFF.02/08/2007
BIS—ISSUEDVERTICLE DESIGN CONST. CORP12/01/2006
BISEQISSUEDVERTICLE DESIGN CONST. CORP12/01/2006
BISEQRE-ISSUEDVERTICAL DESIGN CONST CORP11/29/2006
BISPLISSUEDMARATHON MECHANICAL LLC10/06/2006
BISEQISSUEDPERIMETER BRIDGE SCAFF.01/26/2006
BISEQISSUEDVERTICLE DESIGN CONST. CORP01/20/2006
BIS—ISSUEDVERTICLE DESIGN CONST. CORP01/20/2006
BISPLISSUEDMARATHON MECHANICAL LLC08/12/2005
BIS—ISSUEDVERTICLE DESIGN CONST. CORP06/13/2005
BISEQISSUEDVERTICLE DESIGN CONST. CORP06/13/2005
BISEQISSUEDPERIMETER BRIDGE SCAFF.12/17/2004
BISOTISSUEDBRENNAN OPERATING INC04/13/2004
BISOTISSUEDBRENNAN OPERATING INC04/13/2004
+ 12 more permits on file
4 projects · most recent 05/15/2025
FiledStatusContractorScope
05/15/2025CompleteBOROWIDE ELECT'L CONTR'S—
11/02/2023Permit IssuedTOP SHELF ELECTRIC CORP—
04/06/2022CompleteELPO ELECTRICAL CONTG INC—
10/04/2021CompleteELPO ELECTRICAL CONTG INC—
1 project · most recent 03/04/2025
Steel Concrete
FiledStatusContractorScope
03/04/2025Permit IssuedJK RESTORATION CORPSteel, Concrete
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
02/28/2025Concrete - Cast-In-PlaceMAHFUZAR RAHMANspecial
02/28/2025MasonryMAHFUZAR RAHMANspecial
02/28/2025Structural Steel - DetailsMAHFUZAR RAHMANspecial
02/28/2025Structural Steel - High Strength BoltingMAHFUZAR RAHMANspecial
02/28/2025Structural Steel - WeldingMAHFUZAR RAHMANspecial
02/28/2025Tenant Protection Plan Compliance—special
02/28/2025FinalDouglas Laneprogress
04/15/2022Post-installed AnchorsSunil Saigalspecial
▾Documents — 105 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
09/02/2026M00717801-I1Request digital key ↗
09/02/2026M00719906-I1Request digital key ↗
08/29/2026M00932918-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits26
▸BISWORK PERMIT APPLICATION14
11/24/2020140970787Open ↗
11/17/2016121341501Open ↗
04/21/2016122121195Open ↗
Showing 3 of 14 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION12
10/28/2020140970787Open ↗
12/12/2016122121195Open ↗
09/15/2016122121195Open ↗
Showing 3 of 12 on file for this type
▸Seals & Professional Certifications27
▸DOB NOWDPL-1: Design Professional Seal & Signature8
09/02/2026M00717801-I1Open ↗
09/02/2026M00719906-I1Open ↗
08/29/2026M00932918-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
01/04/2017122121195Open ↗
01/04/2017122121195Open ↗
09/08/2014122121195Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
09/08/2014122121195Open ↗
08/16/2012121341501Open ↗
11/04/2011120883222Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
08/16/2012121341501Open ↗
11/04/2011120883222Open ↗
09/29/2010120482405Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/31/2026M00719906-I1Open ↗
08/24/2026M01152700-P1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
09/08/2014122121195Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
10/28/2020140970787Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/24/2026M01152700-P1Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes2
09/15/2016122121195Open ↗
10/28/2020140970787Open ↗
▸Environmental & Asbestos9
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
11/04/2011120883222Open ↗
09/29/2010120482405Open ↗
04/21/2008110147868Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/29/2026M00932918-I1Open ↗
08/13/2026M01152700-P1Open ↗
08/13/2026M01152700-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
10/28/2020140970787Open ↗
09/16/2014122121195Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
08/21/2010120448195Open ↗
▸Energy Compliance5
▸BISAS-BUILT ENERGY ANALYSIS2
01/04/2017122121195Open ↗
09/08/2014122121195Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
01/04/2017122121195Open ↗
09/08/2014122121195Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
10/28/2020140970787Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY1
10/28/2020140970787Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
01/26/2017121341501Open ↗
▸Approvals, Objections & Sign-offs12
▸BISADMINISTRATIVE OBJECTIONS5
08/16/2012121341501Open ↗
11/04/2011120883222Open ↗
09/29/2010120482405Open ↗
Showing 3 of 5 on file for this type
▸BISSHED LETTER3
11/17/2016121341501Open ↗
01/07/2016121341501Open ↗
01/17/2013121341501Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
01/08/2015121341501Open ↗
03/22/2011120482405Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
01/26/2017121341501Open ↗
01/04/2017122121195Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
10/28/2020140970787Open ↗
01/04/2017122121195Open ↗
09/15/2016122121195Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms9
▸BISEFILING COVER SHEET6
09/08/2014122121195Open ↗
08/16/2012121341501Open ↗
11/04/2011120883222Open ↗
Showing 3 of 6 on file for this type
▸BISADDITIONAL INFORMATION2
09/15/2016122121195Open ↗
12/02/2014121341501Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
10/28/2020140970787Open ↗