← Back
Converted dwellings or rooming house
138 WEST 129 STREET
MANHATTAN · Harlem (North) · BIN 1057960
💬 Discuss this project
1910Year Built
5Stories
C5Building Class
R7-2Zoning
10,125 sfGross Floor Area
11Units
Rent Stabilized30 Open Violations ▸
Converted dwellings or rooming house · Owner of record: AMSTERDAM GARVEY HOUSING DEVELOPMENT FUN D CORP. · 2,498 sf lot · 4.05 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipment
Roof13p · 1 filing · 20 docs
Floor 513p · 1 filing · 20 docs
Floor 413p · 1 filing · 20 docs
Floor 313p · 1 filing · 20 docs
Floor 213p · 1 filing · 20 docs
Floor 120p · 3 filings · 20 docs
Cellar22p · 2 filings · 20 docs
Site & exterior7p · 2 filings · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WEST HARLEM GROUP ASSISTANCE4207/08/2026
METRO CONTRACTING NY903/22/2026
AMSTERDAM GARVEY HOUSING DEVELOPMENT FUN D CORP.203/22/2026
WHGA GARVEY HDFC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
P. M. ARCHITECTURE, PC1505/20/2025
MSM ENGINEERING SERVICES, PLLC210/03/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PM ARCHITECTURE PC3003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HORIZON CONSTRUCTION INCGeneral Contractor404/09/2026
METRO CONTRACTING NY, INC.General Contractor403/21/2026
AMERICAN STANDARD P&H CORORP.Plumbing407/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SOCOTEC ENGINEERING49831405/20/2025
Building Lifecycle
All (134)Filed (17)Permit Issued (10)Signed Off (8)Violation (60)Inspection (9)Special Inspection (30)
04/07/2026
Signed off — Alteration
New Boiler installation, subsequent filing to add 2nd boiler. No change to use egress or occupancy.
M01047498-S2
04/07/2026
Signed off — Alteration
New Boiler installation, subsequent filing to add 2nd boiler. No change to use egress or occupancy.
M01047498-I1
03/30/2026
Violation issued (HPD, open)
B
03/30/2026
Violation issued (HPD, open)
A
03/30/2026
Violation issued (HPD, open)
A
03/30/2026
Violation issued (HPD, open)
C
03/30/2026
Violation issued (HPD, open)
B
03/30/2026
Violation issued (HPD, open)
A
03/30/2026
Violation issued (HPD, closed)
C
03/30/2026
Violation issued (HPD, open)
B
03/30/2026
Violation issued (HPD, open)
B
03/30/2026
Violation issued (HPD, open)
B
03/30/2026
Violation issued (HPD, open)
B
03/30/2026
Violation issued (HPD, open)
B
03/30/2026
Violation issued (HPD, open)
B
03/30/2026
Violation issued (HPD, open)
A
03/30/2026
Violation issued (HPD, open)
B
03/30/2026
Violation issued (HPD, open)
A
03/30/2026
Violation issued (HPD, open)
C
03/23/2026
Violation issued (HPD, open)
B
03/23/2026
Violation issued (HPD, open)
B
03/23/2026
Violation issued (HPD, open)
B
03/23/2026
Violation issued (HPD, open)
B
03/23/2026
Violation issued (HPD, open)
B
03/23/2026
Violation issued (HPD, open)
C
03/23/2026
Violation issued (HPD, open)
B
03/23/2026
Violation issued (HPD, closed)
C
12/02/2025
Signed off — Alteration
New Boiler installation, subsequent filing to add 2nd boiler. No change to use egress or occupancy.
M01047498-S1
12/02/2025
Signed off — Alteration
Renovated bathrooms and kitchens at apts. 1A and 1B for ADA compliance no change to use egress or occupancy.
M00830458-I1
11/04/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/04/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/17/2025
Signed off — Alteration
Replace and relocate plumbing fixtures at kitchen bath per revised layout at apt. 1A, and apt. 1B. No change in use egress or occupancy.
M00829272-I1
10/09/2025
Signed off — Alteration
M00826765-I1
09/19/2025
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY LIGHT DUTY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01116427-I1
08/04/2025
Special inspection requirement — Insulation placement and R values
ALEXIS SCHLESSINGERMAN
08/04/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
ALEXIS SCHLESSINGERMAN
08/04/2025
Special inspection requirement — Interior lighting power
ALEXIS SCHLESSINGERMAN
08/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEXIS SCHLESSINGERMAN
08/04/2025
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
08/04/2025
Special inspection requirement — Final
ALEXIS SCHLESSINGERMAN
08/04/2025
Special inspection requirement — Energy Code Compliance Inspections
ALEXIS SCHLESSINGERMAN
08/04/2025
Special inspection requirement — Fenestration air leakage
ALEXIS SCHLESSINGERMAN
08/04/2025
Special inspection requirement — Exterior lighting power
ALEXIS SCHLESSINGERMAN
08/04/2025
Special inspection requirement — Air barrier - visual inspection
ALEXIS SCHLESSINGERMAN
08/04/2025
Special inspection requirement — Lighting controls
ALEXIS SCHLESSINGERMAN
07/24/2025
Permit issued — General Construction
M00826765-I1-GC
07/24/2025
Permit issued — General Construction
M00830458-I1-GC
06/09/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/20/2025
Filed — Alteration
Replace and relocate plumbing fixtures at kitchen bath per revised layout at apt. 1A, and apt. 1B. No change in use egress or occupancy.
M00829272-P4
05/20/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
05/19/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
ALEXIS SCHLESSINGERMAN
05/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEXIS SCHLESSINGERMAN
05/19/2025
Special inspection requirement — Tenant Protection Plan Compliance
05/19/2025
Special inspection requirement — Energy Code Compliance Inspections
ALEXIS SCHLESSINGERMAN
05/15/2025
Permit issued — Boiler Equipment
M01047498-S2-BE
05/08/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
04/29/2025
Filed — Alteration
New Boiler installation, subsequent filing to add 2nd boiler. No change to use egress or occupancy.
M01047498-S2
04/29/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/28/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/08/2025
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
Latest 60 of 134 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offHORIZON CONSTRUCTION INC07/24/2025
DOB NOWGeneral ConstructionSigned-offHORIZON CONSTRUCTION INC07/24/2025
DOB NOWBoiler EquipmentSigned-offAMERICAN STANDARD P&H CORORP.05/15/2025
DOB NOWSupported ScaffoldSigned-offMETRO CONTRACTING NY, INC.10/03/2024
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.09/04/2024
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.09/04/2024
DOB NOWBoiler EquipmentSigned-offAMERICAN STANDARD P&H CORORP.09/04/2024
DOB NOWSidewalk ShedSigned-offMETRO CONTRACTING NY, INC.07/23/2024
DOB NOWGeneral ConstructionSigned-offHORIZON CONSTRUCTION INC07/18/2024
DOB NOWGeneral ConstructionSigned-offHORIZON CONSTRUCTION INC07/18/2024
BISOTISSUEDAP. TEK RESTORATION INC08/05/2010
2 projects · most recent 10/23/2024
General Wiring
FiledStatusContractorScope
10/23/2024CompleteHI-RITE ELECTRIC CORPGeneral Wiring
07/23/2024CompleteRICHARD NEU—
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
11/04/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/04/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/09/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/20/2025Pass-Final Boiler Equipment InspectionPassView ↗
05/08/2025Pass-Final Boiler Equipment InspectionPassView ↗
04/29/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/28/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/21/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
12/18/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 59
DateRequirementInspectorRole
08/04/2025Insulation placement and R valuesALEXIS SCHLESSINGERMANenergy_progress
08/04/2025Fenestration and door U-factor and product ratingsALEXIS SCHLESSINGERMANenergy_progress
08/04/2025Interior lighting powerALEXIS SCHLESSINGERMANenergy_progress
08/04/2025Fire-Resistant Penetrations and JointsALEXIS SCHLESSINGERMANspecial
08/04/2025Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
08/04/2025FinalALEXIS SCHLESSINGERMANprogress
08/04/2025Energy Code Compliance InspectionsALEXIS SCHLESSINGERMANprogress
08/04/2025Fenestration air leakageALEXIS SCHLESSINGERMANenergy_progress
08/04/2025Exterior lighting powerALEXIS SCHLESSINGERMANenergy_progress
08/04/2025Air barrier - visual inspectionALEXIS SCHLESSINGERMANenergy_progress
08/04/2025Lighting controlsALEXIS SCHLESSINGERMANenergy_progress
05/19/2025HVAC-R and service water piping design and insulationALEXIS SCHLESSINGERMANenergy_progress
05/19/2025Fire-Resistant Penetrations and JointsALEXIS SCHLESSINGERMANspecial
05/19/2025Tenant Protection Plan Compliance—special
05/19/2025Energy Code Compliance InspectionsALEXIS SCHLESSINGERMANprogress
04/08/2025Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
04/08/2025HVAC-R and service water heating system controlsALEXIS SCHLESSINGERMANenergy_progress
04/08/2025Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
04/08/2025HVAC-R and service water piping design and insulationALEXIS SCHLESSINGERMANenergy_progress
04/08/2025HVAC-R and service water heating equipmentALEXIS SCHLESSINGERMANenergy_progress
04/08/2025Heating SystemsALEXIS SCHLESSINGERMANspecial
12/16/2024HVAC-R and service water heating equipmentALEXIS SCHLESSINGERMANenergy_progress
12/16/2024Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
12/16/2024HVAC-R and service water piping design and insulationALEXIS SCHLESSINGERMANenergy_progress
12/16/2024HVAC-R and service water heating system controlsALEXIS SCHLESSINGERMANenergy_progress
Latest 25 of 59.
▾Documents — 102 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch16
08/27/2026M00829272-P4Request digital key ↗
08/27/2026M00829272-P3Request digital key ↗
08/27/2026M00829272-P2Request digital key ↗
Showing 3 of 16 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
08/09/2010120433469Open ↗
▸BISWORK PERMIT APPLICATION1
08/12/2010120433469Open ↗
▸Seals & Professional Certifications47
▸DOB NOWProgress Inspector Seal & Signature16
09/23/2026M01047498-I1Open ↗
09/23/2026M01047498-S2Open ↗
09/07/2026M00826765-P2Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
08/27/2026M00829272-P4Open ↗
08/27/2026M00829272-P3Open ↗
08/27/2026M00829272-P2Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/23/2026M01047498-I1Open ↗
09/23/2026M01047498-S2Open ↗
09/23/2026M01047498-I1Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
08/09/2010120433469Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
08/09/2010120433469Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
08/09/2010120433469Open ↗
▸Environmental & Asbestos15
▸DOB NOWDEP ACP-5: Asbestos Assessment Report14
08/27/2026M00829272-P4Open ↗
08/27/2026M00829272-P3Open ↗
08/27/2026M00829272-P2Open ↗
Showing 3 of 14 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
08/09/2010120433469Open ↗
▸Approvals, Objections & Sign-offs17
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter16
08/27/2026M00826765-I1Open ↗
08/27/2026M00826765-P1Open ↗
08/27/2026M00826765-P2Open ↗
Showing 3 of 16 on file for this type
▸BISADMINISTRATIVE OBJECTIONS1
08/09/2010120433469Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
08/09/2010120433469Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
08/09/2010120433469Open ↗
▸Other Documents3
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026M00826765-P1Open ↗
08/13/2026M00826765-P2Open ↗
08/13/2026M00826765-I1Open ↗