ArchitectureCivilEquipmentGeneralMechanicalStructural
Issued Permit Scope
General Construction · Sidewalk Shed · Supported Scaffold
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
On file for this project
2 documents · 4 drawing sheets
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
On file for this project
4 documents · 5 drawing sheets
Facade restoration to include masonry, pointing, stucco, terracotta, sill, and lintels
On file for this project
3 documents · 8 drawing sheets
Latest 3 of 5 filings on this floor.