← Back
Legitimate theatre, sole use
Cort Theater
138 WEST 48 STREET · BIN 1022679
💬 Discuss this project
1913Year Built
5Stories
J4Building Class
C6-5.5Zoning
22,500 sfGross Floor Area
1Units
0 Open Violations
Legitimate theatre, sole use · Owner of record: CORT THEATRE LLC · 12,050 sf lot · 1.87 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Roof24p · 2 filings · 20 docs
Bulkhead1p · 1 filing · 20 docs
Floor 513p · 3 filings · 20 docs
Floor 410p · 3 filings · 20 docs
Floor 323p · 4 filings · 20 docs
Floor 217p · 3 filings · 20 docs
Floor 1
Mezzanine2p · 1 filing · 20 docs
Cellar23p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JRM CONSTRUCTION MGMT803/22/2026
JRM103/22/2026
SHUBERT AND BOOTH THEATER LLC103/22/2026
SHUBER303/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JRM CONSTRUCTION MGMT LLCGeneral Contractor3707/08/2026
SAFWAY ATLANTIC, LLCGeneral Contractor1307/08/2026
NYC FIRE SPRINKLER CORPFire Protection1307/08/2026
THE SHUBERT ORGANIZATIONGeneral Contractor807/08/2026
SOHO CONTRACTING CORPGeneral Contractor707/08/2026
KING HOIST & SCAFFOLDINGGeneral Contractor407/08/2026
PAR PLUMBING CO., INCPlumbing407/08/2026
LONG ISLAND CONCRETE INCGeneral Contractor203/21/2026
ARSENAL SCAFFOLD INCGeneral Contractor203/21/2026
AP PLUMBING & HVAC LLCPlumbing207/08/2026
MMI MECHANICAL INCGeneral Contractor207/08/2026
LINEAR ELECTRIC, INC.Electrical203/22/2026
ULTIMATE SIGNS DESIGNSScaffold107/08/2026
RITE-WAY INTERNAL REMOVAL INCGeneral Contractor107/08/2026
GEORGE BRESLAW PLBNG LLCPlumbing107/08/2026
A.S.R. ELEC'L CONTR'G INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
VINCENT J. LIOTTA P. E.1974101/09/2025
SAG ENGINEERING & CONSULT6082209/06/2023
RICHMOND TESTING LAB263407/16/2022
NEW YORK ENGINEERING ASSO851504/25/2022
PAVANE & KWALBRUN CONSULT1753203/10/2020
Building Lifecycle
All (216)Filed (49)Permit Issued (76)Signed Off (31)Violation (13)Inspection (17)Special Inspection (30)
01/20/2026
Signed off — Alteration
M01125949-I1
01/16/2026
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
07/15/2025
Signed off — Alteration
APPLICATION IS FILED FOR VERTICAL AND HORIZONTAL ENLARGEMENT OF THE JAMES EARL JONES (CORT) THEATER. THE STRUCTURAL SCOPE AND STR INSPECTIONS ARE FILED UNDER SUBSEQUENT APP#M00462158-S1. NO CHANGE TO USE OR OCCUPANCY.
M00462158-I1
05/07/2025
Permit issued — Boiler Equipment
M01125949-I1-BE
01/09/2025
Filed — Alteration
M01125949-I1
12/23/2024
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
Vincent Liotta
11/13/2024
Signed off — Alteration
M00997711-I1
11/07/2024
Permit issued — General Construction
M00997711-I1-GC
02/09/2024
Filed — Alteration
M00997711-I1
12/22/2023
Signed off — Alteration
M00913340-I1
12/06/2023
Signed off — Alteration
NO WORK APPLICATION FOR SEATING PLAN SUBMISSION AT ORCHESTRA AND BALCONY AT THE JAMES EARL JONES THEATER UNDER ARTICLE 13 FOR SPECIAL OCCUPANCY STRUCTURE AS PER THE DOB'S DEPARTMENTAL MEMORANDUM OF APRIL 21ST, 1982. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00946548-I1
11/02/2023
Permit issued — General Construction
M00946548-I1-GC
10/23/2023
Filed — Alteration
NO WORK APPLICATION FOR SEATING PLAN SUBMISSION AT ORCHESTRA AND BALCONY AT THE JAMES EARL JONES THEATER UNDER ARTICLE 13 FOR SPECIAL OCCUPANCY STRUCTURE AS PER THE DOB'S DEPARTMENTAL MEMORANDUM OF APRIL 21ST, 1982. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00946548-I1
10/11/2023
Special inspection requirement — Final
Michael Kostow
10/02/2023
Permit issued — Structural
M00913340-I1-ST
09/25/2023
Permit issued — Structural
M00913340-I1-ST
09/06/2023
Filed — Alteration
M00913340-I1
04/28/2023
Signed off — Alteration
Mechanical scope associated with Cort Theater renovation, including installation of new units and associated ductwork. No change of use, egress or occupancy.
M00452582-S2
04/25/2023
Special inspection requirement — Heating Systems
Chester Kowalski
04/25/2023
Special inspection requirement — Mechanical Systems
Chester Kowalski
04/25/2023
Special inspection requirement — Final
Chester Kowalski
04/24/2023
Filed — Alteration
Mechanical scope associated with Cort Theater renovation, including installation of new units and associated ductwork. No change of use, egress or occupancy.
M00452582-P4
04/20/2023
Signed off — Alteration
APPLICATION IS FILED FOR VERTICAL AND HORIZONTAL ENLARGEMENT OF THE JAMES EARL JONES (CORT) THEATER. THE STRUCTURAL SCOPE AND STR INSPECTIONS ARE FILED UNDER SUBSEQUENT APP#M00462158-S1. NO CHANGE TO USE OR OCCUPANCY.
M00462158-S3
03/20/2023
Signed off — Alteration
Mechanical scope associated with Cort Theater renovation, including installation of new units and associated ductwork. No change of use, egress or occupancy.
M00452582-S1
02/13/2023
Signed off — Alteration
Installation of new 6" fire protection service piping, 2 backflow preventers and associated valves in a Cellar of Cort Theater. No change of use, egress or occupancy.
M00260435-I1
02/10/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/09/2023
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
02/06/2023
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
02/02/2023
Permit issued — Standpipe
M00260435-I1-EW-SD
01/26/2023
Signed off — Alteration
Mechanical scope associated with Cort Theater renovation, including installation of new units and associated ductwork. No change of use, egress or occupancy.
M00452582-S3
01/09/2023
Signed off — Alteration
APPLICATION IS FILED FOR VERTICAL AND HORIZONTAL ENLARGEMENT OF THE JAMES EARL JONES (CORT) THEATER. THE STRUCTURAL SCOPE AND STR INSPECTIONS ARE FILED UNDER SUBSEQUENT APP#M00462158-S1. NO CHANGE TO USE OR OCCUPANCY.
M00462158-S2
01/09/2023
Special inspection requirement — Final
Chester Kowalski
01/09/2023
Special inspection requirement — Heating Systems
Chester Kowalski
01/09/2023
Special inspection requirement — Mechanical Systems
Chester Kowalski
01/06/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/06/2023
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
12/23/2022
Signed off — Alteration
INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00570418-I1
12/22/2022
Signed off — Alteration
M00572524-I1
11/30/2022
Signed off — Alteration
Structural scope associated with new Signs installation at the Cort Theater. No change ot use, egress or occupancy.
M00621070-S1
11/11/2022
Signed off — Alteration
M00639836-I1
11/11/2022
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING BUILDING ALTERATION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00466434-I1
11/11/2022
Signed off — Alteration
NORTH WALL SCAFFOLD: INSTALLATION OF TEMPORARY SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00639808-I1
11/11/2022
Signed off — Alteration
M00466445-I1
10/31/2022
Signed off — Alteration
APPLICATION IS FILED FOR VERTICAL AND HORIZONTAL ENLARGEMENT OF THE JAMES EARL JONES (CORT) THEATER. THE STRUCTURAL SCOPE AND STR INSPECTIONS ARE FILED UNDER SUBSEQUENT APP#M00462158-S1. NO CHANGE TO USE OR OCCUPANCY.
M00462158-S1
10/27/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Chester Kowalski
10/27/2022
Special inspection requirement — Fenestration air leakage
Chester Kowalski
10/27/2022
Special inspection requirement — Protection of exposed foundation insulation
Chester Kowalski
10/27/2022
Special inspection requirement — Final
Michael Kostow
10/27/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
Chester Kowalski
10/27/2022
Special inspection requirement — Insulation placement and R values
Chester Kowalski
10/27/2022
Special inspection requirement — Fenestration areas
Chester Kowalski
10/27/2022
Special inspection requirement — Air barrier - visual inspection
Chester Kowalski
10/27/2022
Special inspection requirement — Sprayed fire-resistant materials
Chester Kowalski
10/27/2022
Special inspection requirement — Air barrier — testing
Chester Kowalski
10/25/2022
Filed — Alteration
APPLICATION IS FILED FOR VERTICAL AND HORIZONTAL ENLARGEMENT OF THE JAMES EARL JONES (CORT) THEATER. THE STRUCTURAL SCOPE AND STR INSPECTIONS ARE FILED UNDER SUBSEQUENT APP#M00462158-S1. NO CHANGE TO USE OR OCCUPANCY.
M00462158-P4
10/21/2022
Signed off — Alteration
Mechanical scope associated with Cort Theater renovation, including installation of new units and associated ductwork. No change of use, egress or occupancy.
M00452582-I1
10/21/2022
Signed off — Alteration
INSTALLATION OF STEEL PIPE SCAFFOLD AS PER PLANS. NO CHANGE TO EGRESS, USE, OR OCCPANCY.
M00492756-I1
10/14/2022
Signed off — Alteration
Foundation work associated with the Cort Theater extension. The Support of Excavation (SOE) will be filed under a separate application. No change to use, egress, or occupancy.
M00456916-I1
10/07/2022
Signed off — Alteration
Structural scope associated with new Signs installation at the Cort Theater. No change ot use, egress or occupancy.
M00621070-I1
10/06/2022
Filed — Alteration
Structural scope associated with new Signs installation at the Cort Theater. No change ot use, egress or occupancy.
M00621070-P1
Latest 60 of 216 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offMMI MECHANICAL INC05/07/2025
DOB NOWGeneral ConstructionSigned-offTHE SHUBERT ORGANIZATION11/07/2024
DOB NOWGeneral ConstructionSigned-offTHE SHUBERT ORGANIZATION11/02/2023
DOB NOWStructuralSigned-offTHE SHUBERT ORGANIZATION10/02/2023
DOB NOWStructuralSigned-offTHE SHUBERT ORGANIZATION09/25/2023
DOB NOWStandpipeSigned-offNYC FIRE SPRINKLER CORP02/02/2023
DOB NOWSignSigned-offJAY GANG08/18/2022
DOB NOWSidewalk ShedSigned-offSOHO CONTRACTING CORP07/22/2022
DOB NOWGeneral ConstructionSigned-offJRM CONSTRUCTION MGMT LLC07/08/2022
DOB NOWStructuralSigned-offJRM CONSTRUCTION MGMT LLC07/08/2022
DOB NOWPlumbingSigned-offNYC FIRE SPRINKLER CORP07/05/2022
DOB NOWSprinklersSigned-offNYC FIRE SPRINKLER CORP07/05/2022
DOB NOWPlumbingSigned-offNYC FIRE SPRINKLER CORP07/05/2022
DOB NOWPlumbingSigned-offNYC FIRE SPRINKLER CORP07/05/2022
DOB NOWGeneral ConstructionSigned-offJRM CONSTRUCTION MGMT LLC06/28/2022
DOB NOWStandpipeSigned-offPAR PLUMBING CO., INC06/07/2022
DOB NOWPlumbingSigned-offPAR PLUMBING CO., INC06/02/2022
DOB NOWMechanical SystemsSigned-offJRM CONSTRUCTION MGMT LLC06/02/2022
DOB NOWSupported ScaffoldSigned-offKING HOIST & SCAFFOLDING04/22/2022
DOB NOWGeneral ConstructionSigned-offJRM CONSTRUCTION MGMT LLC04/22/2022
DOB NOWGeneral ConstructionSigned-offJRM CONSTRUCTION MGMT LLC04/21/2022
DOB NOWGeneral ConstructionSigned-offJRM CONSTRUCTION MGMT LLC04/19/2022
DOB NOWFoundationSigned-offJRM CONSTRUCTION MGMT LLC04/19/2022
DOB NOWGeneral ConstructionSigned-offJRM CONSTRUCTION MGMT LLC04/18/2022
DOB NOWStructuralPermit IssuedJRM CONSTRUCTION MGMT LLC04/13/2022
DOB NOWPlumbingSigned-offCROSSFIELD PLBG.&HTG03/23/2022
DOB NOWSupported ScaffoldSigned-offARSENAL SCAFFOLD INC03/01/2022
DOB NOWSupport of ExcavationPermit IssuedJRM CONSTRUCTION MGMT LLC01/16/2022
DOB NOWMechanical SystemsSigned-offJRM CONSTRUCTION MGMT LLC01/12/2022
DOB NOWPlumbingSigned-offNYC FIRE SPRINKLER CORP01/12/2022
DOB NOWConstruction FenceSigned-offSAFWAY ATLANTIC, LLC01/07/2022
DOB NOWSidewalk ShedSigned-offSAFWAY ATLANTIC, LLC01/06/2022
DOB NOWBoiler EquipmentSigned-offMMI MECHANICAL INC12/03/2021
DOB NOWMechanical SystemsSigned-offMMI MECHANICAL INC12/03/2021
DOB NOWSupported ScaffoldSigned-offSAFWAY ATLANTIC, LLC12/02/2021
DOB NOWSupported ScaffoldSigned-offSAFWAY ATLANTIC, LLC12/02/2021
DOB NOWGeneral ConstructionSigned-offJRM CONSTRUCTION MGMT LLC11/08/2021
DOB NOWFoundationSigned-offJRM CONSTRUCTION MGMT LLC11/08/2021
DOB NOWFoundationSigned-offJRM CONSTRUCTION MGMT LLC11/05/2021
DOB NOWGeneral ConstructionSigned-offJRM CONSTRUCTION MGMT LLC11/05/2021
+ 35 more permits on file
18 projects · most recent 09/22/2026
General Wiring Lighting Boiler Controls
FiledStatusContractorScope
09/22/2026Permit IssuedLINEAR ELECTRIC, INC.—
03/09/2026CompleteLINEAR ELECTRIC, INC.—
09/25/2025CompleteLINEAR ELECTRIC, INC.—
03/12/2025CompleteLINEAR ELECTRIC, INC.—
09/13/2024CompleteLINEAR ELECTRIC, INC.—
03/19/2024CompleteLINEAR ELECTRIC, INC.—
09/06/2023CompleteLINEAR ELECTRIC, INC.—
08/25/2023Permit IssuedA.S.R. ELEC'L CONTR'G INCGeneral Wiring, Lighting
04/19/2023CompleteLINEAR ELECTRIC, INC.—
11/07/2022CompleteLINEAR ELECTRIC, INC.—
09/21/2022CompleteH. & L. ELECTRIC INCGeneral Wiring
08/05/2021CompleteETRICITY ELECTRICAL CO INBoiler Controls
04/21/2021CompleteA.S.R. ELEC'L CONTR'G INC—
02/09/2021CompleteCORPORATE ELEC. GROUP INC—
02/13/2020CompleteLINEAR ELECTRIC, INC.—
▾Field Inspections (DOB CAP) — 17
DateTypeResultReport
01/16/2026Pass-Final Boiler Equipment InspectionPassView ↗
02/10/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/09/2023Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
02/06/2023Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
01/06/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/06/2023Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
09/19/2022Fail-Final SD - Fire PumpFailView ↗
08/29/2022Pass-Final SD - Up to 9 Requested FloorsPassView ↗
07/21/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/21/2022Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
03/31/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/28/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/28/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/04/2021Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/04/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/07/2021Pass-Final PL - UndergroundPassView ↗
06/28/2021Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 128
DateRequirementInspectorRole
12/23/2024Fuel-Oil Storage and Fuel-Oil Piping SystemsVincent Liottaspecial
10/11/2023FinalMichael Kostowprogress
04/25/2023FinalChester Kowalskiprogress
04/25/2023Mechanical SystemsChester Kowalskispecial
04/25/2023Heating SystemsChester Kowalskispecial
01/09/2023FinalChester Kowalskiprogress
01/09/2023Mechanical SystemsChester Kowalskispecial
01/09/2023Heating SystemsChester Kowalskispecial
10/27/2022Protection of exposed foundation insulationChester Kowalskienergy_progress
10/27/2022Fenestration areasChester Kowalskienergy_progress
10/27/2022Sprayed fire-resistant materialsChester Kowalskispecial
10/27/2022Fire-Resistant Penetrations and JointsChester Kowalskispecial
10/27/2022Air barrier — testing Chester Kowalskienergy_progress
10/27/2022Insulation placement and R valuesChester Kowalskienergy_progress
10/27/2022FinalMichael Kostowprogress
10/27/2022Air barrier - visual inspectionChester Kowalskienergy_progress
10/27/2022Fenestration air leakageChester Kowalskienergy_progress
10/27/2022Fenestration and door U-factor and product ratingsChester Kowalskienergy_progress
09/21/2022FinalDIEGO ERASprogress
09/14/2022Insulation placement and R valuesChester Kowalskienergy_progress
09/14/2022Protection of exposed foundation insulationChester Kowalskienergy_progress
09/14/2022Fire-Resistant Penetrations and JointsChester Kowalskispecial
09/14/2022Sprayed fire-resistant materialsChester Kowalskispecial
09/14/2022FinalMichael Kostowprogress
09/14/2022Fenestration air leakageChester Kowalskienergy_progress
Latest 25 of 128.
▾Documents — 487 on file (BIS + DOB NOW)
▸Plans & Drawings51
▸DOB NOWPlans/Sketch32
09/04/2026M00492756-I1Request digital key ↗
09/03/2026M00509538-I1Request digital key ↗
09/03/2026M00563992-P1Request digital key ↗
Showing 3 of 32 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
09/05/2026M00260435-P1Request digital key ↗
09/05/2026M00260435-I1Request digital key ↗
09/04/2026M00393170-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - General Construction3
09/02/2026M00452582-I1Request digital key ↗
09/02/2026M00462158-I1Request digital key ↗
09/02/2026M00462158-P4Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed3
09/03/2026M00466434-I1Request digital key ↗
Showing 1 of 3 on file for this type
▸DOB NOWPlans/Sketch - Standpipe2
09/05/2026M00260435-P1Request digital key ↗
09/05/2026M00260435-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Foundation2
09/04/2026M00456916-P1Request digital key ↗
09/04/2026M00456916-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Support of Excavation2
09/04/2026M00470021-P1Request digital key ↗
09/04/2026M00470021-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/04/2026M00393170-S2Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/04/2026M00466445-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment1
09/04/2026M00393170-S1Request digital key ↗
▸Applications & Permits55
▸DOB NOWLPC Approval/Permit28
09/05/2026M00260435-P1Open ↗
09/05/2026M00260435-I1Open ↗
09/04/2026M00393170-I1Open ↗
Showing 3 of 28 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION14
07/19/2023123917850Open ↗
07/18/2023123917850Open ↗
03/16/2023123917850Open ↗
Showing 3 of 14 on file for this type
▸BISWORK PERMIT APPLICATION12
05/18/2021141001742Open ↗
11/16/2018123575620Open ↗
11/16/2018123575620Open ↗
Showing 3 of 12 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
07/11/2022141019083Open ↗
▸Zoning, Tax Lot & Property Records8
▸DOB NOWZD1: DOB Zoning Diagram2
09/02/2026M00462158-I1Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWZoning Exhibit form (1-5)2
09/02/2026M00462158-I1Open ↗
Showing 1 of 2 on file for this type
▸BISZONING EXHIBIT II: CERTIFICATION1
08/04/2023123917850Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
08/04/2023123917850Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
08/04/2023123917850Open ↗
▸BISEASEMENT AND RESTRICTIVE DECLARATIONS - SUPPPORTING DOCUMENTATION1
08/04/2023123917850Open ↗
▸Seals & Professional Certifications222
▸DOB NOWSpecial Inspector Seal & Signature80
09/23/2026M00393170-S1Open ↗
09/23/2026M00393170-S1Open ↗
09/01/2026M00470021-I1Open ↗
Showing 3 of 80 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature49
09/05/2026M00260435-P1Open ↗
09/05/2026M00260435-I1Open ↗
09/04/2026M00393170-I1Open ↗
Showing 3 of 49 on file for this type
▸DOB NOWProgress Inspector Seal & Signature47
09/23/2026M00393170-S1Open ↗
09/23/2026M00393170-S1Open ↗
09/23/2026M00393170-S1Open ↗
Showing 3 of 47 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION26
04/08/2019103176670Open ↗
01/23/2019123575602Open ↗
01/23/2019123575602Open ↗
Showing 3 of 26 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT8
11/15/2018123575620Open ↗
11/15/2018123575620Open ↗
07/23/2018123575602Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST8
11/15/2018123575620Open ↗
07/23/2018123575602Open ↗
02/08/2018123167704Open ↗
Showing 3 of 8 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
06/09/2022141019083Open ↗
05/17/2021141001742Open ↗
▸BISProfessional and Owner Certification (POC3)1
07/24/2017123309838Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/09/2022141019083Open ↗
▸Trade Schedules & Equipment6
▸BISSELF-CERT PLUMBING NOTICE2
07/08/2015122172816Open ↗
01/16/2015122172816Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
12/05/2014122172816Open ↗
11/21/2014122172816Open ↗
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
09/02/2026M00462158-I1Open ↗
Showing 1 of 2 on file for this type
▸Safety & Tenant Protection2
▸BISBPP: STREET TREES SITE PLAN1
06/09/2022141019083Open ↗
▸BISSTREET TREE CHECKLIST1
07/01/2022141019083Open ↗
▸Environmental & Asbestos56
▸DOB NOWOER: Notice to Proceed18
09/03/2026M00509538-I1Open ↗
09/02/2026M00462158-S2Open ↗
09/02/2026M00462158-P1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form11
09/04/2026M00456916-I1Open ↗
09/03/2026M00509538-I1Open ↗
09/02/2026M00452582-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWOER: Notice of Satisfaction9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
09/05/2026M00260435-I1Open ↗
09/05/2026M00260435-P1Open ↗
09/04/2026M00393170-I1Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)6
11/16/2018123575620Open ↗
07/23/2018123575602Open ↗
02/12/2018123167704Open ↗
Showing 3 of 6 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED2
06/09/2022141019083Open ↗
05/17/2021141001742Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION2
10/11/2022141019083Open ↗
05/28/2021141001742Open ↗
▸Energy Compliance4
▸DOB NOWEN2: As Built Energy Analysis.2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
11/21/2014122172816Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
06/08/2016122172816Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
05/02/2022141001742Open ↗
05/17/2021141001742Open ↗
▸Approvals, Objections & Sign-offs29
▸BISLANDMARKS APPROVAL13
08/04/2023123917850Open ↗
05/17/2021141001742Open ↗
04/08/2019103176670Open ↗
Showing 3 of 13 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST12
10/12/2022141019083Open ↗
05/03/2022141001742Open ↗
04/19/2019103176670Open ↗
Showing 3 of 12 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
03/16/2023123917850Open ↗
10/12/2022141019083Open ↗
07/01/2022141019083Open ↗
▸BISLANDMARKS SIGNOFF1
03/31/2022141001742Open ↗
▸Cost, Insurance & Ownership17
▸BISCOST AFFIDAVIT15
01/23/2019123575602Open ↗
01/22/2019123575620Open ↗
11/15/2018123575620Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWCertification by Insurance Broker or Agency1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWCertificate of Insurance1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms22
▸BISEFILING COVER SHEET10
03/16/2023123917850Open ↗
11/15/2018123575620Open ↗
11/15/2018123575620Open ↗
Showing 3 of 10 on file for this type
▸BISBOROUGH INTAKE FORM7
04/19/2019103176670Open ↗
04/08/2019103176670Open ↗
01/23/2019123575602Open ↗
Showing 3 of 7 on file for this type
▸BISADDITIONAL INFORMATION3
08/23/2023123917850Open ↗
08/04/2023123917850Open ↗
07/01/2022141019083Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
06/09/2022141019083Open ↗
05/17/2021141001742Open ↗
▸Other Documents13
▸DOB NOWPlot Diagram4
09/02/2026M00462158-I1Open ↗
Showing 1 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
09/02/2026M00462158-I1Open ↗
Showing 1 of 2 on file for this type
▸BISVERIFY DOB PLAN NAMING STANDARD IS MET1
08/04/2023123917850Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
08/04/2023123917850Open ↗
▸DOB NOWSite Survey: Initial1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAdjoining Owners Notification1
09/04/2026M00470021-I1Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAdditional Insured Authorizations1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWProof of Historic Building1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type