Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofJones Theatre, Cort Theatre400p · 6 filings · 20 docs
ArchitectureElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Foundation · General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural · Supported Scaffold
Installation of a new steel platform that will provide access between the stage and house roof levels at the Jones Theater. Installation of a new hoist system and two-level catwalk around the house roof mech unit. No change of use, egress, or occupancy.
On file for this project
6 documents
Structural and minor foundation work associated with the Cort Theater renovation. No change to egress, use, or occupancy.
On file for this project
86 documents · 18 drawing sheets
STRUCTURAL SCOPE ASSOCIATED WITH VERTICAL AND HORIZONTAL ENLARGEMENT OF THE CORT THEATER. NO CHANGE OF USE, EGRESS OR OCCUPANCY. SOE AND ASSOCIATED FOUNDATION SCOPES ARE FILED UNDER SEPARATE APPLICATIONS.
On file for this project
105 documents · 6 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 5Cort Theatre, Jones Theatre401p · 4 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Foundation · General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Structural and minor foundation work associated with the Cort Theater renovation. No change to egress, use, or occupancy.
On file for this project
86 documents · 7 drawing sheets
STRUCTURAL SCOPE ASSOCIATED WITH VERTICAL AND HORIZONTAL ENLARGEMENT OF THE CORT THEATER. NO CHANGE OF USE, EGRESS OR OCCUPANCY. SOE AND ASSOCIATED FOUNDATION SCOPES ARE FILED UNDER SEPARATE APPLICATIONS.
On file for this project
105 documents · 10 drawing sheets
REPLACE OIL BURNERS WITH WITH GAS/OIL BURNERS. REPLACE ABOVE GROUND FUEL OIL TANK WITH (2) 275 GALLON TANKS.
On file for this project
25 documents
Latest 3 of 4 filings on this floor.
Floor 4Cort Theatre, Jones Theatre399p · 6 filings · 20 docs
ArchitectureEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Foundation · General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural · Supported Scaffold
Structural and minor foundation work associated with the Cort Theater renovation. No change to egress, use, or occupancy.
On file for this project
86 documents · 6 drawing sheets
STRUCTURAL SCOPE ASSOCIATED WITH VERTICAL AND HORIZONTAL ENLARGEMENT OF THE CORT THEATER. NO CHANGE OF USE, EGRESS OR OCCUPANCY. SOE AND ASSOCIATED FOUNDATION SCOPES ARE FILED UNDER SEPARATE APPLICATIONS.
On file for this project
105 documents · 7 drawing sheets
REPLACE OIL BURNERS WITH WITH GAS/OIL BURNERS. REPLACE ABOVE GROUND FUEL OIL TANK WITH (2) 275 GALLON TANKS.
On file for this project
25 documents
Latest 3 of 6 filings on this floor.
Floor 3Cort Theatre, Jones Theatre411p · 7 filings · 20 docs
ArchitectureDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Foundation · General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural · Supported Scaffold
Structural and minor foundation work associated with the Cort Theater renovation. No change to egress, use, or occupancy.
On file for this project
86 documents · 13 drawing sheets
STRUCTURAL SCOPE ASSOCIATED WITH VERTICAL AND HORIZONTAL ENLARGEMENT OF THE CORT THEATER. NO CHANGE OF USE, EGRESS OR OCCUPANCY. SOE AND ASSOCIATED FOUNDATION SCOPES ARE FILED UNDER SEPARATE APPLICATIONS.
On file for this project
105 documents · 12 drawing sheets
INSTALLATION OF STEEL PIPE SCAFFOLD AS PER PLANS. NO CHANGE TO EGRESS, USE, OR OCCPANCY.
On file for this project
3 documents
Latest 3 of 7 filings on this floor.
Floor 2Jones Theatre, Cort Theatre407p · 7 filings · 20 docs
ArchitectureDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Foundation · General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural · Supported Scaffold
NO WORK APPLICATION FOR SEATING PLAN SUBMISSION AT ORCHESTRA AND BALCONY AT THE JAMES EARL JONES THEATER UNDER ARTICLE 13 FOR SPECIAL OCCUPANCY STRUCTURE AS PER THE DOB'S DEPARTMENTAL MEMORANDUM OF APRIL 21ST, 1982. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
5 documents
Structural and minor foundation work associated with the Cort Theater renovation. No change to egress, use, or occupancy.
On file for this project
86 documents · 12 drawing sheets
STRUCTURAL SCOPE ASSOCIATED WITH VERTICAL AND HORIZONTAL ENLARGEMENT OF THE CORT THEATER. NO CHANGE OF USE, EGRESS OR OCCUPANCY. SOE AND ASSOCIATED FOUNDATION SCOPES ARE FILED UNDER SEPARATE APPLICATIONS.
On file for this project
105 documents · 7 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 1Jones Theatre, Cort Theatre425p · 9 filings · 20 docs
ArchitectureDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Foundation · General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural · Supported Scaffold
NO WORK APPLICATION FOR SEATING PLAN SUBMISSION AT ORCHESTRA AND BALCONY AT THE JAMES EARL JONES THEATER UNDER ARTICLE 13 FOR SPECIAL OCCUPANCY STRUCTURE AS PER THE DOB'S DEPARTMENTAL MEMORANDUM OF APRIL 21ST, 1982. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
5 documents
Structural and minor foundation work associated with the Cort Theater renovation. No change to egress, use, or occupancy.
On file for this project
86 documents · 14 drawing sheets
STRUCTURAL SCOPE ASSOCIATED WITH VERTICAL AND HORIZONTAL ENLARGEMENT OF THE CORT THEATER. NO CHANGE OF USE, EGRESS OR OCCUPANCY. SOE AND ASSOCIATED FOUNDATION SCOPES ARE FILED UNDER SEPARATE APPLICATIONS.
On file for this project
105 documents · 8 drawing sheets
Latest 3 of 9 filings on this floor.
MezzanineCort Theatre, Jones Theatre380p · 3 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · Foundation · General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
INSTALLATION OF FUEL BELLY TANK AND GENERATOR EXHAUST PIPE. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
On file for this project
7 documents
Structural and minor foundation work associated with the Cort Theater renovation. No change to egress, use, or occupancy.
On file for this project
86 documents · 2 drawing sheets
STRUCTURAL SCOPE ASSOCIATED WITH VERTICAL AND HORIZONTAL ENLARGEMENT OF THE CORT THEATER. NO CHANGE OF USE, EGRESS OR OCCUPANCY. SOE AND ASSOCIATED FOUNDATION SCOPES ARE FILED UNDER SEPARATE APPLICATIONS.
On file for this project
105 documents
CellarCort Theatre, Jones Theatre427p · 7 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · Foundation · General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
INSTALLATION OF FUEL BELLY TANK AND GENERATOR EXHAUST PIPE. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
On file for this project
7 documents
Installation of new 6 fire protection service piping, 2 backflow preventers and associated valves in a Cellar of Cort Theater. No change of use, egress or occupancy.
On file for this project
12 documents · 1 drawing sheet
Structural and minor foundation work associated with the Cort Theater renovation. No change to egress, use, or occupancy.
On file for this project
86 documents · 16 drawing sheets
Latest 3 of 7 filings on this floor.
Site & exteriorCort Theatre256p · 11 filings · 20 docs
ArchitectureCivilElectricalEquipmentGeneralMechanicalStructural
Issued Permit Scope
Construction Fence · Foundation · General Construction · Protection and Mechanical Methods · Sidewalk Shed · Sign · Structural · Supported Scaffold · Support of Excavation
NO WORK DIR-14 APPLICATION TO RECORD THE MEETS AND BOUNDS FOR A AIR RIGHTS PARCEL.. AI1 commissioner approval under supporting documents.
On file for this project
5 documents · 1 drawing sheet
Structural scope associated with new Signs installation at the Cort Theater. No change ot use, egress or occupancy.
On file for this project
16 documents · 10 drawing sheets
INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents · 12 drawing sheets
Latest 3 of 11 filings on this floor.