← Back
Other college and university
138 WILLIAM STREET
MANHATTAN · BIN 1001189
💬 Discuss this project
1942Year Built
7Stories
W6Building Class
C6-4Zoning
44,506 sfGross Floor Area
8Units
LL97 Covered1 Open Violation ▸FISP: SAFEFDNY Report ↗
Other college and university · Owner of record: CRIKOS, LLC · 5,573 sf lot · 7.99 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Roof2p · 2 filings · 16 docs
Bulkhead1p · 1 filing · 5 docs
Floor 41p · 1 filing · 3 docs
Floor 3
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TOTAL NY CONSTRUCTION1607/08/2026
CRIKOS6407/08/2026
140 WILLIAM LLC103/22/2026
CANIDO BASONAS CONSTRUCTION203/21/2026
CRILOS503/21/2026
PACE UNIVERSITY203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ANGELOS GEORGOPOULOS, P.C.106/26/2026
GRAF & LEWENT ARCHITECTS, LLP105/23/2022
GURVINDER SINGH401/05/2022
SRS ARCHITECT, PC109/28/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SANDEEP KAUR403/21/2026
WALTER T GORMAN PE203/21/2026
FIVE BOROUGH FILING & EXPEDITING IN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TOTAL NY CONSTRUCTION CORPGeneral Contractor1107/08/2026
BDS ELECTRIC CORP.Electrical103/22/2026
E-J ELEC. INSTALLATION COElectrical103/22/2026
ADVANTAGECONTRACTING CORGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AMARACON TESTING & INSPEC5842106/26/2026
SRS ARCHITECT, PC2434109/28/2021
Building Lifecycle
All (87)Filed (7)Permit Issued (6)Signed Off (6)Facade (FISP) (15)Violation (48)Special Inspection (5)
06/26/2026
Filed — Alteration
Replacement of existing sidewalk vault including new concrete slab, waterproofing and steel beam work. Sidewalk Repairs in accordance with DOT Standards. No change in use, egress or occupancy.
M01409423-I1
02/03/2026
Violation issued (FDNY_NOV, closed)
02/03/2026
Violation issued (FDNY_NOV, closed)
02/03/2026
Violation issued (FDNY_ORDER, closed)
02/03/2026
Violation issued (FDNY_ORDER, closed)
02/12/2025
Violation issued (FDNY_ORDER, closed)
01/29/2024
Violation issued (FDNY_NOV, closed)
11/03/2022
Cycle 9 facade report submitted
10/29/2022
Cycle 9 facade report signed — SAFE
10/11/2022
Cycle 9 facade inspection completed
08/22/2022
Signed off — Alteration
EXTERIOR FACADE RESTORATION AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY. SIDEWALK SHED IF REQUIRED TO BE FILED SEPARATELY.
M00579548-I1
08/08/2022
Signed off — Alteration
Proposed to remove non-bearing partition and repair all finishes, all as per plan. No change of use, egress or occupancy.
M00727861-I1
08/01/2022
Signed off — Alteration
INSTALLATION OF ROOF PROTECTION.
M00628002-I1
08/01/2022
Signed off — Alteration
INSTALLATION OF ROOF PROTECTION.
M00628002-S1
08/01/2022
Signed off — Alteration
INSTALLATION OF ROOF PROTECTION.
M00628002-S3
08/01/2022
Signed off — Alteration
INSTALLATION OF ROOF PROTECTION.
M00628002-S2
06/17/2022
Permit issued — General Construction
M00727861-I1-GC
05/23/2022
Filed — Alteration
Proposed to remove non-bearing partition and repair all finishes, all as per plan. No change of use, egress or occupancy.
M00727861-I1
01/05/2022
Filed — Alteration
INSTALLATION OF ROOF PROTECTION.
M00628002-S3
01/05/2022
Permit issued — Protection and Mechanical Methods
M00628002-S3-PM
12/27/2021
Cycle 8 facade report submitted
12/27/2021
Cycle 8 facade report signed — SWARMP
12/21/2021
Cycle 8 facade inspection completed
12/21/2021
Special inspection requirement — Final
GURVINDER SINGH
12/10/2021
Permit issued — Protection and Mechanical Methods
M00628002-S2-PM
12/09/2021
Filed — Alteration
INSTALLATION OF ROOF PROTECTION.
M00628002-S2
11/23/2021
Permit issued — Supported Scaffold
M00628002-S1-SF
11/22/2021
Filed — Alteration
INSTALLATION OF ROOF PROTECTION.
M00628002-S1
11/10/2021
Filed — Alteration
INSTALLATION OF ROOF PROTECTION.
M00628002-I1
11/10/2021
Permit issued — Sidewalk Shed
M00628002-I1-SH
11/10/2021
Special inspection requirement — Final
GURVINDER SINGH
11/10/2021
Special inspection requirement — Final
GURVINDER SINGH
10/04/2021
Permit issued — General Construction
M00579548-I1-GC
09/28/2021
Filed — Alteration
EXTERIOR FACADE RESTORATION AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY. SIDEWALK SHED IF REQUIRED TO BE FILED SEPARATELY.
M00579548-I1
09/20/2021
Special inspection requirement — Masonry
Silvia Schlaen
08/19/2021
Special inspection requirement — Final
Silvia Schlaen
02/14/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/14/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/20/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/26/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/18/2018
Cycle 8 facade report submitted
01/12/2018
Cycle 8 facade report signed — SWARMP
12/27/2017
Cycle 8 facade inspection completed
11/01/2017
Violation issued (ECB, closed)
Construction
10/26/2017
Violation issued (ECB, closed)
Construction
02/08/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/08/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/13/2014
Violation issued (ECB, closed)
Unknown
05/13/2014
Violation issued (ECB, closed)
Construction
03/31/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/31/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/18/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/18/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/30/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/23/2012
Cycle 7 facade report submitted
10/16/2012
Cycle 7 facade report signed — SAFE
10/15/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/28/2012
Cycle 7 facade inspection completed
10/13/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/13/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 87 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offADVANTAGECONTRACTING COR06/17/2022
DOB NOWProtection and Mechanical MethodsSigned-offTOTAL NY CONSTRUCTION COR01/05/2022
DOB NOWProtection and Mechanical MethodsSigned-offTOTAL NY CONSTRUCTION COR12/10/2021
DOB NOWSupported ScaffoldSigned-offTOTAL NY CONSTRUCTION COR11/23/2021
DOB NOWSidewalk ShedSigned-offTOTAL NY CONSTRUCTION COR11/10/2021
DOB NOWGeneral ConstructionSigned-offTOTAL NY CONSTRUCTION COR10/04/2021
BISEQISSUEDEVEREST SCAFFOLDING INC06/13/2017
BISOTISSUEDALBERT ALAN CONST LLC02/29/2016
BISMHISSUEDJACK PICCINNI INC08/19/2014
BISFSISSUEDJACK PICCINI, INC07/07/2014
BISPLISSUEDPAR PLUMBING CO., INC04/23/2014
BIS—ISSUEDJAMES S MITCHELL & SONS04/21/2014
BISEQISSUEDEVEREST SCAFFOLDING INC03/25/2014
BISEQISSUEDEVEREST SCAFFOLDING INC03/25/2014
BISOTISSUEDTRANSPARENT CONSTRUCTION05/14/2013
BIS—ISSUEDNY FLAG AND POLE CO., INC01/09/2013
BIS—ISSUEDNY FLAG AND POLE CO., INC01/09/2013
BIS—ISSUEDSNS ARCHITECTS & ENGINEERS, PC09/27/2012
BISPLISSUEDWYNNE PLBG & HEATING CORP08/17/2012
BISPLISSUEDWYNNE PLBG & HEATING CORP08/17/2012
BISOTISSUEDBRAS AL CONSTRUCTION CORP08/08/2012
BISOTISSUEDBRAS AL CONSTRUCTION CORP08/08/2012
BISEQISSUEDBRAS AL CONSTRUCTION CORP08/08/2012
BISSPISSUEDA + SPRINKLER CORP07/25/2012
BISPLISSUEDTRISTATE PLBG SVCS CORP07/10/2012
BISMHISSUEDTRANSPARENT CONSTRUCTION07/09/2012
BISOTISSUEDTRANSPARENT CONSTRUCTION07/05/2012
BISEQISSUEDEVEREST SCAFFOLDING INC06/11/2012
BISMHISSUEDJP HVAC CORP05/31/2012
BISOTISSUEDBRAS AL CONSTRUCTION CORP03/21/2012
BISOTISSUEDBRAS AL CONSTRUCTION CORP02/16/2012
BISSPISSUEDWYNNE PLBG & HEATING CORP02/01/2012
BISPLISSUEDWYNNE PLBG & HEATING CORP06/10/2011
BISEQISSUEDOUTDOOR INSTALLATIONS LLC10/02/2006
BISPLISSUEDNYC WATER MAIN WORK INC08/20/2004
BIS—ISSUEDPAUL SIGNS, INC08/07/2003
BIS—ISSUEDPAUL SIGNS, INC08/07/2003
BIS—ISSUEDPAUL SIGNS, INC08/07/2003
BISOTISSUEDTHESAURUS CONTRACTING CORP05/09/2002
BIS—ISSUEDAMERICAN NUMISMATIC SOCIETY02/24/2000
+ 2 more permits on file
2 projects · most recent 11/24/2021
General Wiring
FiledStatusContractorScope
11/24/2021CompleteBDS ELECTRIC CORP.—
02/19/2021CompleteE-J ELEC. INSTALLATION COGeneral Wiring
1 project · most recent 06/26/2026
Steel Concrete
FiledStatusContractorScope
06/26/2026——Steel, Concrete
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
12/21/2021FinalGURVINDER SINGHprogress
11/10/2021FinalGURVINDER SINGHprogress
11/10/2021FinalGURVINDER SINGHprogress
09/20/2021MasonrySilvia Schlaenspecial
08/19/2021FinalSilvia Schlaenprogress
▾Documents — 440 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
09/03/2026M00579548-I1Request digital key ↗
09/03/2026M00628002-S2Request digital key ↗
09/03/2026M00628002-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits87
▸BISPLAN / WORK APPROVAL APPLICATION55
08/03/2017140655306Open ↗
06/12/2017140655306Open ↗
12/29/2016121182987Open ↗
Showing 3 of 55 on file for this type
▸BISWORK PERMIT APPLICATION29
06/12/2017140655306Open ↗
02/29/2016140443651Open ↗
08/19/2014140194885Open ↗
Showing 3 of 29 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
05/29/2014121184388Open ↗
Showing 1 of 2 on file for this type
▸BISPLACE OF ASSEMBLY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records3
▸BISZoning Diagram (ZD1)1
03/24/2014121184388Open ↗
▸BISZONING EXHIBIT I- CERTIFICATION1
04/09/2014121184388Open ↗
▸BISZONING EXHIBIT III- DESC & OWNERSHIP STMNT1
04/09/2014121184388Open ↗
▸Seals & Professional Certifications75
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION38
10/30/2018140655306Open ↗
05/03/2016140443651Open ↗
04/15/2016140443651Open ↗
Showing 3 of 38 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
09/03/2026M00628002-S2Open ↗
09/03/2026M00628002-S1Open ↗
09/03/2026M00628002-S3Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
06/12/2017140655306Open ↗
12/23/2015140443651Open ↗
03/25/2014140176636Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
06/12/2017140655306Open ↗
12/23/2015140443651Open ↗
03/25/2014140176636Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
06/12/2017140655306Open ↗
12/23/2015140443651Open ↗
03/25/2014140176636Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026M00628002-I1Open ↗
08/26/2026M00628002-S1Open ↗
08/23/2026M00579548-I1Open ↗
Showing 3 of 4 on file for this type
▸BISApplicant / Owner Signature2
06/18/2014140194885Open ↗
07/29/2014140222881Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026M00579548-I1Open ↗
▸Trade Schedules & Equipment54
▸BISSELF-CERT PLUMBING NOTICE20
09/08/2014121184388Open ↗
09/08/2014121184388Open ↗
08/16/2014121184388Open ↗
Showing 3 of 20 on file for this type
▸BISSCHEDULE B - PLUMBING13
08/06/2014121184388Open ↗
07/30/2014121184388Open ↗
03/24/2014121184388Open ↗
Showing 3 of 13 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA6
08/13/2014122002420Open ↗
05/14/2014122002420Open ↗
05/14/2014122002420Open ↗
Showing 3 of 6 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT6
09/08/2014121184388Open ↗
09/08/2014121184388Open ↗
Showing 2 of 6 on file for this type
▸BISEQUIPMENT USE PERMITS3
09/08/2014121184388Open ↗
09/08/2014121184388Open ↗
Showing 2 of 3 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
09/06/2014140194885Open ↗
08/28/2014121184388Open ↗
▸BISSPRINKLER INSP REPORT : FP-852
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL1
10/25/2014140222881Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
06/18/2014140194885Open ↗
▸Safety & Tenant Protection3
▸BISST-1 Street Tree Checklist2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISDS1-Demolition Submittal Certification Form1
03/07/2014121184388Open ↗
▸Environmental & Asbestos21
▸BISASBESTOS: CERTIFICATION (DEP ACP5)9
12/23/2015140443651Open ↗
06/25/2014140194885Open ↗
05/14/2014122002420Open ↗
Showing 3 of 9 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/02/2026M00727861-I1Open ↗
08/16/2026M01409423-I1Open ↗
08/13/2026M00579548-I1Open ↗
▸Energy Compliance22
▸BISTR8: Energy Code Progress Inspections9
08/28/2014121184388Open ↗
04/23/2014121184388Open ↗
04/15/2014121184388Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
05/03/2016140443651Open ↗
10/22/2014140194885Open ↗
10/22/2014140194885Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS5
05/03/2016140443651Open ↗
10/22/2014140194885Open ↗
08/28/2014121184388Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
12/23/2015140443651Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
03/25/2014140176627Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
12/23/2015140443651Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY4
06/12/2017140655306Open ↗
12/23/2015140443651Open ↗
03/25/2014140176636Open ↗
Showing 3 of 4 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS3
03/07/2014121184388Open ↗
Showing 1 of 3 on file for this type
▸Approvals, Objections & Sign-offs75
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST42
10/30/2018140655306Open ↗
09/29/2017121182987Open ↗
09/13/2017121184388Open ↗
Showing 3 of 42 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE16
06/20/2016121184388Open ↗
06/14/2016121184388Open ↗
05/08/2016121184388Open ↗
Showing 3 of 16 on file for this type
▸BISADMINISTRATIVE OBJECTIONS11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
09/23/2014140176627Open ↗
09/18/2014140176636Open ↗
Showing 2 of 3 on file for this type
▸BISCCD1-Construction Code Determination3
02/08/2016121182987Open ↗
Showing 1 of 3 on file for this type
▸Cost, Insurance & Ownership31
▸BISCOST AFFIDAVIT30
05/03/2016140443651Open ↗
12/23/2015140443651Open ↗
04/27/2015140222881Open ↗
Showing 3 of 30 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE1
04/23/2014121184388Open ↗
▸Filing & Intake Forms46
▸BISADDITIONAL INFORMATION22
09/01/2017121184388Open ↗
08/02/2017140655306Open ↗
11/01/2016121184388Open ↗
Showing 3 of 22 on file for this type
▸BISeFiling Job Application Cover Sheet13
06/18/2014140194885Open ↗
03/17/2014121184388Open ↗
02/20/2014121184388Open ↗
Showing 3 of 13 on file for this type
▸BISEFILING COVER SHEET10
05/14/2014122002420Open ↗
Showing 1 of 10 on file for this type
▸BISBOROUGH INTAKE FORM1
10/30/2018140655306Open ↗
▸Other Documents5
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
06/12/2017140655306Open ↗
03/24/2014121184388Open ↗
▸BISPLOT DIAGRAM2
03/18/2014121182987Open ↗
Showing 1 of 2 on file for this type
▸BISECCCNYS Analysis1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type