← Back
BuildNYC
Two family frame
1380 CLOVE ROAD
STATEN ISLAND · BIN 5176871
💬 Discuss this project
2025Year Built
2Stories
B2Building Class
R3XZoning
3,600 sfGross Floor Area
2Units
Two family frame · Owner of record: 1390 Clove Properties · 4,150 sf lot · 0.87 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalPlumbingCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 22p · 2 filings · 20 docs
Floor 120p · 2 filings · 20 docs
Cellar2p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1390 Clove Properties1407/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Joseph M. Morace, A.I.A., Architect406/25/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Patricia L Gass803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J. Mangone ConstructionGeneral Contractor104/09/2026
Sken ServicesGeneral Contractor107/08/2026
Fine MechanicalPlumbing107/08/2026
Quality PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
C&P Design Consultant8472205/20/2025
Building Lifecycle
12/06/2025
Permit expired, never signed off — Foundation
The city's record still shows this permit as issued, with no sign-off on its filing
S01107427-I1-GC-CX
09/18/2025
Signed off — New Building
PROPOSED PLUMBING AND STORM FIXTURES AND ASSOCIATED PIPING FOR NEW DETACHED TWO-FAMILY RESIDENCE.
S01107427-S3
09/12/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/12/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
08/27/2025
Signed off — New Building
PROPOSED PLUMBING AND STORM FIXTURES AND ASSOCIATED PIPING FOR NEW DETACHED TWO-FAMILY RESIDENCE.
S01107427-S1
52 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offTT & T Construction06/30/2025
DOB NOWPlumbingSigned-offQuality Plumbing04/17/2025
DOB NOWPlumbingSigned-offFine Mechanical01/13/2025
DOB NOWFoundationPermit IssuedJ. Mangone Construction12/06/2024
1 project · most recent 06/25/2025
Storm Water/Sanitary
FiledStatusContractorScope
06/25/2025Signed-offFine MechanicalStorm, Water/Sanitary
1 project · most recent 03/17/2025
General Wiring
FiledStatusContractorScope
03/17/2025CompleteLMS ElectricalGeneral Wiring
1 project · most recent 06/25/2025
Concrete Wood
FiledStatusContractorScope
06/25/2025Signed-offSken ServicesConcrete, Wood
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
09/12/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/12/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
05/13/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/23/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
04/22/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/24/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/31/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 52
DateRequirementInspectorRole
08/05/2025Concrete - Cast-In-PlaceStanislav Pilipenkospecial
08/05/2025Mechanical SystemsStanislav Pilipenkospecial
08/05/2025Fire-Resistant Penetrations and JointsStanislav Pilipenkospecial
08/05/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationStanislav Pilipenkospecial
08/05/2025Subgrade InspectionsStanislav Pilipenkospecial
08/05/2025Structural Wood FrameStanislav Pilipenkoprogress
08/05/2025Footing and FoundationStanislav Pilipenkoprogress
08/05/2025Energy Code Compliance InspectionsStanislav Pilipenkoprogress
08/05/2025FinalStanislav Pilipenkoprogress
08/05/2025Fire-Resistance Rated ConstructionStanislav Pilipenkoprogress
08/05/2025Permanent certificateStanislav Pilipenkoenergy_progress
08/05/2025HVAC-R and service water heating equipmentStanislav Pilipenkoenergy_progress
08/05/2025Fenestration areasStanislav Pilipenkoenergy_progress
08/05/2025Interior lighting powerStanislav Pilipenkoenergy_progress
08/05/2025Fenestration and door U-factor and product ratingsStanislav Pilipenkoenergy_progress
08/05/2025HVAC-R and service water piping design and insulationStanislav Pilipenkoenergy_progress
08/05/2025Ventilation and air distribution systemStanislav Pilipenkoenergy_progress
08/05/2025HVAC-R and service water heating system controlsStanislav Pilipenkoenergy_progress
08/05/2025Protection of exposed foundation insulationStanislav Pilipenkoenergy_progress
08/05/2025Air barrier - visual inspectionStanislav Pilipenkoenergy_progress
08/05/2025Lighting in dwelling unitsStanislav Pilipenkoenergy_progress
08/05/2025Air barrier — testing Stanislav Pilipenkoenergy_progress
08/05/2025Duct leakage testing, insulation and designStanislav Pilipenkoenergy_progress
08/05/2025Maintenance informationStanislav Pilipenkoenergy_progress
08/05/2025Insulation placement and R valuesStanislav Pilipenkoenergy_progress
Latest 25 of 52.
49 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account