← Back
BuildNYC
Parochial school, yeshiva
Cristo Rey Brooklyn High School
1383 BROOKLYN AVENUE · BIN 3430210
💬 Discuss this project
1942Year Built
3Stories
W2Building Class
R4Zoning
45,900 sfGross Floor Area
0Units
LL97 Covered0 Active ViolationsFDNY Report ↗
Parochial school, yeshiva · Owner of record: Cristo Rey Brooklyn High School · 31,793 sf lot · 1.44 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 7Cristo Rey Brooklyn High School1 filing · 12 docs
Floor 6Cristo Rey Brooklyn High School1 filing · 12 docs
Floor 5Cristo Rey Brooklyn High School1 filing · 12 docs
Floor 4
Floor 3
Floor 2
Floor 1
CellarCristo Rey Brooklyn High School1 filing · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
James Equities1403/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/09/2023$10.8M—Sisters of Mercy of the Americas → CRISTO REY BROOKLYN HIGH SCHOOL$234/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Ettinger Engineering Associates401/28/2026
Wexler Associates201/21/2026
EQ Architecture112/05/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
P.wolfe Consultants1403/21/2026
Building Lifecycle
All (44)Filed (7)Objection (7)Special Inspection (30)
03/13/2026
Objection resolved — Addressed
03/02/2026
Objection raised — Admin
02/26/2026
Objection raised — Other
02/25/2026
Objection raised — Other
02/19/2026
Objection raised — Admin
02/19/2026
Objection raised — Other
01/28/2026
Filed — New Building
Process Filing for Proposed 9 Story + Cellar as per plans attached. New Certificate of Occupancy will be required.
B01323981-S2
01/23/2026
Filed — New Building
Process Filing for Proposed 9 Story + Cellar as per plans attached. New Certificate of Occupancy will be required.
B01323981-S1
01/22/2026
Filed — New Building
Process Filing for Proposed 9 Story + Cellar as per plans attached. New Certificate of Occupancy will be required.
B01323981-S3
01/22/2026
Filed — New Building
Process Filing for Proposed 9 Story + Cellar as per plans attached. New Certificate of Occupancy will be required.
B01323981-S6
01/21/2026
Filed — New Building
Process Filing for Proposed 9 Story + Cellar as per plans attached. New Certificate of Occupancy will be required.
B01323981-S5
01/21/2026
Filed — New Building
Process Filing for Proposed 9 Story + Cellar as per plans attached. New Certificate of Occupancy will be required.
B01323981-S4
01/07/2026
Objection raised — Other
12/19/2025
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
12/19/2025
Special inspection requirement — Subgrade Inspections
12/19/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
12/16/2025
Special inspection requirement — Standpipe Systems
12/12/2025
Special inspection requirement — Concrete - Cast-In-Place
12/12/2025
Special inspection requirement — Masonry
12/12/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
12/12/2025
Special inspection requirement — Post-installed Anchors
12/11/2025
Special inspection requirement — Final
12/11/2025
Special inspection requirement — Concrete - Cast-In-Place
12/11/2025
Special inspection requirement — Final
12/11/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
12/11/2025
Special inspection requirement — Footing and Foundation
12/11/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
12/10/2025
Special inspection requirement — Exterior lighting power
12/10/2025
Special inspection requirement — Lighting in dwelling units
12/10/2025
Special inspection requirement — Interior lighting power
12/10/2025
Special inspection requirement — Metering
12/10/2025
Special inspection requirement — Electrical motors and elevators
12/10/2025
Special inspection requirement — Lighting controls
12/10/2025
Special inspection requirement — Maintenance information
12/09/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
12/09/2025
Special inspection requirement — Standpipe Systems
12/09/2025
Special inspection requirement — Shutoff dampers
12/09/2025
Special inspection requirement — Post-installed Anchors
12/09/2025
Special inspection requirement — Mechanical Systems
12/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
12/09/2025
Special inspection requirement — Final
12/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
12/09/2025
Special inspection requirement — Sprinkler Systems
12/05/2025
Filed — New Building
Process Filing for Proposed 9 Story + Cellar as per plans attached. New Certificate of Occupancy will be required.
B01323981-I1
Nothing on file for this building.
1 project · most recent 01/28/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
01/28/2026——Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Ice Air RSXC13 12,500 BTU · Ptac ×126
RSXC09 9,200 BTU · Ptac ×49
Lg ZRUM144BTE6 12 tons · Vrf Outdoor ×2
ZRUM096BTE6 8 tons · Vrf Outdoor ×1
ZRUM168BTE6 14 tons · Vrf Outdoor ×1
Ventilation
— HE2X 1,690 CFM · Exhaust Fan ×2
BEF500x 2,400 CFM · Exhaust Fan ×1
BSQ-90 585 CFM · Exhaust Fan ×1
CSP-A700-VG 500 CFM · Exhaust Fan ×1
USF-15 2,070 CFM · Exhaust Fan ×1
Greenheck USF-13-B7 1,660 CFM · Exhaust Fan ×3
AX-80-275-0618-A100 15,500 CFM · Exhaust Fan ×2
USF-15-B7 1,980 CFM · Exhaust Fan ×1
1 project · most recent 01/28/2026
Sprinkler System
FiledStatusContractorScope
01/28/2026——Sprinkler System
1 project · most recent 01/28/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
01/28/2026——Gas, Storm, Water/Sanitary
1 project · most recent 01/28/2026
Concrete
FiledStatusContractorScope
01/28/2026——Concrete
▾Special Inspection Requirements (DOB NOW) — 67
DateRequirementInspectorRole
12/19/2025Subgrade Inspections—special
12/19/2025Subsurface Conditions – Fill Placement & In-Place Density—special
12/19/2025Excavations - Sheeting, Shoring, and Bracing—special
12/16/2025Standpipe Systems—special
12/12/2025Post-installed Anchors—special
12/12/2025Structural Stability – Alterations of existing buildings—special
12/12/2025Concrete - Cast-In-Place—special
12/12/2025Masonry—special
12/11/2025Final—progress
12/11/2025Structural Stability – Alterations of existing buildings—special
12/11/2025Concrete - Cast-In-Place—special
12/11/2025Subsurface Investigations (Borings/Test Pits)—special
12/11/2025Final—progress
12/11/2025Footing and Foundation—progress
12/10/2025Lighting in dwelling units—energy_progress
12/10/2025Lighting controls—energy_progress
12/10/2025Electrical motors and elevators—energy_progress
12/10/2025Metering—energy_progress
12/10/2025Exterior lighting power—energy_progress
12/10/2025Interior lighting power—energy_progress
12/10/2025Maintenance information—energy_progress
12/09/2025Standpipe Systems—special
12/09/2025HVAC-R and service water heating system controls—energy_progress
12/09/2025HVAC-R and service water heating equipment—energy_progress
12/09/2025Duct leakage testing, insulation and design—energy_progress
Latest 25 of 67.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Cristo Rey Brooklyn High SchoolEducationCellar, Floors 5–7
Project B01323981 New Building · Objections · 12/05/2025
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 29 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/19/2026B01323981-S4Request digital key ↗
08/19/2026B01323981-S1Request digital key ↗
08/19/2026B01323981-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records10
▸DOB NOWRestrictive Declaration/Easement 17
08/13/2026B01323981-S2Open ↗
08/13/2026B01323981-S4Open ↗
08/13/2026B01323981-S6Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B01323981-I1Open ↗
▸DOB NOWRestrictive Declaration/Easement 21
08/13/2026B01323981-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026B01323981-I1Open ↗
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/19/2026B01323981-S6Open ↗
08/19/2026B01323981-I1Open ↗
08/19/2026B01323981-S1Open ↗
Showing 3 of 7 on file for this type
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026B01323981-I1Open ↗
▸Inspections & Test Reports1
▸DOB NOWSOIL REPORT1
08/13/2026B01323981-S4Open ↗
▸Other Documents3
▸DOB NOWProperty Ownership Certification1
08/14/2026B01323981-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/14/2026B01323981-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B01323981-I1Open ↗