← Back
Walk-up cooperative
1383 PLIMPTON AVENUE
BRONX · BIN 2003396
💬 Discuss this project
1922Year Built
5Stories
C6Building Class
R7-1Zoning
19,250 sfGross Floor Area
26Units
Rent Stabilized48 Open Violations 47 unresolved · 1 paperwork only ▸FDNY Report ↗
Walk-up cooperative · Owner of record: 1383 PLIMPTON AVE HDFC · 5,000 sf lot · 3.85 FAR built · Flood zone X
Locations of Work
StructuralMechanicalPlumbing
Roof4p · 1 filing · 11 docs
Floor 52p · 1 filing · 11 docs
Floor 43p · 1 filing · 11 docs
Floor 32p · 1 filing · 11 docs
Floor 23p · 1 filing · 11 docs
Floor 12p · 1 filing · 11 docs
Basement5p · 2 filings · 14 docs
1 job · most recent 04/15/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/15/2026——Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric MXZ-4D30NL 28,600 BTU · Split System ×1
MXZ-SM36NLHZ 36,000 BTU · Split System ×1
Ventilation
Greenheck SQ-100-VG-X 600 CFM · Exhaust Fan ×3
CSP-A390-VG-QD 50 CFM · Exhaust Fan ×1
1 job · most recent 04/15/2026
FiledStatusContractorScope
04/15/2026——2 heads
1 job · most recent 04/15/2026
Gas Plumbing-Sprinkler Storm Water/Sanitary
FiledStatusContractorScope
04/15/2026——Gas, Plumbing-Sprinkler, Storm, Water/Sanitary
2 jobs · most recent 09/28/2021
General Wiring
FiledStatusContractorScope
09/28/2021Permit IssuedRICHARD NEU—
09/27/2018Permit IssuedGOLDMAN ELECTRIC CORP.General Wiring
1 job · most recent 04/15/2026
Steel Concrete Masonry Wood
FiledStatusContractorScope
04/15/2026——Steel, Concrete, Masonry, Wood
Building Lifecycle
All (119)Filed (9)Permit Issued (3)Signed Off (2)Violation (60)Objection (15)Special Inspection (30)
04/29/2026
Objection resolved — Resolved
04/24/2026
Objection raised — Other
04/15/2026
Filed — Alteration
NEW INSTALLATION OF VRF MULTISPLIT SYSTEM , NEW INSULATION OF PIPING, BOILER (FILED SEPARATELY) AND HEATING PIPING REPLACEMENT AS PER PLANS FILED.
X01221665-S1
04/15/2026
Objection resolved — Resolved
04/06/2026
Objection raised — Admin
04/06/2026
Objection raised — Admin
03/26/2026
Filed — Alteration
NEW INSTALLATION OF VRF MULTISPLIT SYSTEM , NEW INSULATION OF PIPING, BOILER (FILED SEPARATELY) AND HEATING PIPING REPLACEMENT AS PER PLANS FILED.
X01221665-S6
03/26/2026
Filed — Alteration
NEW INSTALLATION OF VRF MULTISPLIT SYSTEM , NEW INSULATION OF PIPING, BOILER (FILED SEPARATELY) AND HEATING PIPING REPLACEMENT AS PER PLANS FILED.
X01221665-S2
03/26/2026
Filed — Alteration
NEW INSTALLATION OF VRF MULTISPLIT SYSTEM , NEW INSULATION OF PIPING, BOILER (FILED SEPARATELY) AND HEATING PIPING REPLACEMENT AS PER PLANS FILED.
X01221665-S3
03/24/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
03/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/24/2026
Special inspection requirement — Maintenance information
03/24/2026
Special inspection requirement — Heating Systems
03/24/2026
Special inspection requirement — Tenant Protection Plan Compliance
03/24/2026
Special inspection requirement — HVAC-R and service water heating equipment
03/24/2026
Special inspection requirement — HVAC-R and service water heating system controls
02/16/2026
Special inspection requirement — Mechanical Systems
02/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
02/16/2026
Special inspection requirement — Heating Systems
02/16/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
02/16/2026
Special inspection requirement — Tenant Protection Plan Compliance
02/16/2026
Special inspection requirement — Energy Code Compliance Inspections
02/16/2026
Special inspection requirement — HVAC-R and service water heating equipment
02/16/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
02/16/2026
Special inspection requirement — HVAC-R and service water heating system controls
02/16/2026
Special inspection requirement — HVAC-R and service water heating system controls
02/16/2026
Special inspection requirement — HVAC-R and service water heating equipment
02/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
02/16/2026
Special inspection requirement — Tenant Protection Plan Compliance
02/16/2026
Special inspection requirement — Final
02/16/2026
Special inspection requirement — Energy Code Compliance Inspections
02/16/2026
Special inspection requirement — Maintenance information
07/23/2025
Objection raised — Structural
07/23/2025
Objection raised — Cost
07/17/2025
Filed — Alteration
NEW INSTALLATION OF VRF MULTISPLIT SYSTEM , NEW INSULATION OF PIPING, BOILER (FILED SEPARATELY) AND HEATING PIPING REPLACEMENT AS PER PLANS FILED.
X01221665-I1
06/05/2025
Violation issued (HPD, closed)
A
05/08/2025
Special inspection requirement — Metering
05/08/2025
Special inspection requirement — Fire-Resistance Rated Construction
05/06/2025
Special inspection requirement — Fenestration areas
05/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/06/2025
Special inspection requirement — Tenant Protection Plan Compliance
05/06/2025
Special inspection requirement — Energy Code Compliance Inspections
05/06/2025
Special inspection requirement — Final
01/24/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/22/2024
Violation issued (HPD, closed)
C
10/27/2023
Violation issued (HPD, open)
B
06/12/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
X00601938-I1
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/26/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/14/2022
Permit issued — Sidewalk Shed
X00601938-I1-SH
09/19/2022
Signed off — Alteration
X00730830-I1
09/11/2022
Filed — Alteration
X07996765-I1
07/18/2022
Permit issued — General Construction
X00730830-I1-GC
05/20/2022
Filed — Alteration
X00730830-I1
02/18/2022
Violation issued (HPD, closed)
A
12/22/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/22/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/04/2021
Filed — Alteration
APPLICATION FILE TO EXTERIOR FACADE REPAIR AS REMOVE & REPAIR WINDOW LINTELS, MINOR SPOT BRICK POINTING & STUCCO WORK AS PER PLAN. NO CHANGE IN USE, EGREES OR OCCUPANCY UNDER THIS APPLICATION.
X00637843-I1
11/05/2021
Violation issued (ECB, closed)
Construction
10/08/2021
Permit issued — Sidewalk Shed
X00601938-I1-SH
Latest 60 of 119 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1383 PLIMPTON AVE HDFC1208/29/2026
MNK ENTERPRISES607/08/2026
OWNER OF 1383 PLIMPTON AV103/22/2026
KEYSTONE CONTRACTING203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
OLD STRUCTURES ENGINEERING PC104/15/2026
L. NAOUM, P.E., P. C.303/26/2026
ESKW/A107/17/2025
KMP DESIGN & ENGINEERING PLLC109/11/2022
MG NEW YORK ARCHITECTS,PLLC105/20/2022
ASHRAF CORP112/04/2021
ENTHINK ENGINEERS LLC109/28/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONVERSANO ASSOCIATES, INC.203/21/2026
KMP DESIGN ENGINEERING203/21/2026
BETRO DESIGN GROUP103/21/2026
SHEIKH EXPEDITING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MNK ENTERPRISES LLCGeneral Contractor407/08/2026
KEYSTONE CONTRACTING CORPGeneral Contractor203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MG NEW YORK ARCHITECTS, P3444105/20/2022
ASHRAF CORPORATION1973112/04/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offMNK ENTERPRISES LLC10/14/2022
DOB NOWGeneral ConstructionSigned-offKEYSTONE CONTRACTING CORP07/18/2022
DOB NOWSidewalk ShedSigned-offMNK ENTERPRISES LLC10/08/2021
▾Special Inspection Requirements (DOB NOW) — 38
DateRequirementInspectorRole
03/24/2026HVAC-R and service water piping design and insulation—energy_progress
03/24/2026Fire-Resistant Penetrations and Joints—special
03/24/2026Maintenance information—energy_progress
03/24/2026Heating Systems—special
03/24/2026Tenant Protection Plan Compliance—special
03/24/2026HVAC-R and service water heating equipment—energy_progress
03/24/2026HVAC-R and service water heating system controls—energy_progress
02/16/2026Mechanical Systems—special
02/16/2026Fire-Resistant Penetrations and Joints—special
02/16/2026Heating Systems—special
02/16/2026HVAC-R and service water piping design and insulation—energy_progress
02/16/2026Tenant Protection Plan Compliance—special
02/16/2026Energy Code Compliance Inspections—progress
02/16/2026HVAC-R and service water heating equipment—energy_progress
02/16/2026HVAC-R and service water piping design and insulation—energy_progress
02/16/2026HVAC-R and service water heating system controls—energy_progress
02/16/2026HVAC-R and service water heating system controls—energy_progress
02/16/2026HVAC-R and service water heating equipment—energy_progress
02/16/2026Fire-Resistant Penetrations and Joints—special
02/16/2026Tenant Protection Plan Compliance—special
02/16/2026Final—progress
02/16/2026Energy Code Compliance Inspections—progress
02/16/2026Maintenance information—energy_progress
05/08/2025Metering—energy_progress
05/08/2025Fire-Resistance Rated Construction—progress
Latest 25 of 38.
▾Documents — 24 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/25/2026X00637843-I1Request digital key ↗
08/24/2026X00730830-I1Request digital key ↗
08/24/2026X07996765-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/25/2026X00601938-I1Open ↗
08/24/2026X00730830-I1Open ↗
08/24/2026X07996765-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature1
09/01/2026X00637843-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/01/2026X00637843-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/24/2026X00730830-I1Open ↗
08/24/2026X07996765-I1Open ↗
08/13/2026X00637843-I1Open ↗
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
08/17/2026X01221665-S6Open ↗