← Back
BuildNYC
Two family frame
1386 CLOVE ROAD
STATEN ISLAND · BIN 5176867
💬 Discuss this project
2025Year Built
2Stories
B2Building Class
R3XZoning
3,600 sfGross Floor Area
2Units
0 Active ViolationsFDNY Report ↗
Two family frame · Owner of record: 1390 Clove Properties · 3,688 sf lot · 0.98 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 215p · 2 filings · 20 docs
Floor 126p · 2 filings · 20 docs
Cellar15p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1390 Clove Properties1307/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Joseph M. Morace, A.I.A., Architect410/29/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Patricia L Gass803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J. Mangone ConstructionGeneral Contractor104/09/2026
Sken ServicesGeneral Contractor107/08/2026
Fine MechanicalPlumbing107/08/2026
Quality PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
C&P Design Consultant8472210/29/2025
Building Lifecycle
12/06/2025
Permit expired, never signed off — General Construction
The city's record still shows this permit as issued, with no sign-off on its filing
S01106849-I1-GC-CX
10/30/2025
Special inspection requirement — Concrete - Cast-In-Place
Stanislav Pilipenko
10/30/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Stanislav Pilipenko
10/30/2025
Special inspection requirement — Mechanical Systems
Stanislav Pilipenko
10/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stanislav Pilipenko
50 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offTT & T Construction06/30/2025
DOB NOWPlumbingSigned-offQuality Plumbing04/16/2025
DOB NOWPlumbingSigned-offFine Mechanical01/13/2025
DOB NOWGeneral ConstructionPermit IssuedJ. Mangone Construction12/06/2024
1 project · most recent 10/29/2025
Storm Water/Sanitary
FiledStatusContractorScope
10/29/2025Signed-offFine MechanicalStorm, Water/Sanitary
1 project · most recent 03/17/2025
General Wiring
FiledStatusContractorScope
03/17/2025CompleteLMS ElectricalGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
09/12/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/12/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
05/13/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/23/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
04/22/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/05/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/31/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 52
DateRequirementInspectorRole
10/30/2025Concrete - Cast-In-PlaceStanislav Pilipenkospecial
10/30/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationStanislav Pilipenkospecial
10/30/2025Mechanical SystemsStanislav Pilipenkospecial
10/30/2025Fire-Resistant Penetrations and JointsStanislav Pilipenkospecial
10/30/2025Subgrade InspectionsStanislav Pilipenkospecial
10/30/2025Structural Wood FrameStanislav Pilipenkoprogress
10/30/2025FinalStanislav Pilipenkoprogress
10/30/2025Energy Code Compliance InspectionsStanislav Pilipenkoprogress
10/30/2025Footing and FoundationStanislav Pilipenkoprogress
10/30/2025Fire-Resistance Rated ConstructionStanislav Pilipenkoprogress
10/30/2025Air barrier — testing Stanislav Pilipenkoenergy_progress
10/30/2025Fenestration and door U-factor and product ratingsStanislav Pilipenkoenergy_progress
10/30/2025HVAC-R and service water piping design and insulationStanislav Pilipenkoenergy_progress
10/30/2025Protection of exposed foundation insulationStanislav Pilipenkoenergy_progress
10/30/2025HVAC-R and service water heating equipmentStanislav Pilipenkoenergy_progress
10/30/2025Lighting in dwelling unitsStanislav Pilipenkoenergy_progress
10/30/2025HVAC-R and service water heating system controlsStanislav Pilipenkoenergy_progress
10/30/2025Insulation placement and R valuesStanislav Pilipenkoenergy_progress
10/30/2025Air barrier - visual inspectionStanislav Pilipenkoenergy_progress
10/30/2025Duct leakage testing, insulation and designStanislav Pilipenkoenergy_progress
10/30/2025Fenestration air leakageStanislav Pilipenkoenergy_progress
10/30/2025Maintenance informationStanislav Pilipenkoenergy_progress
10/30/2025Fenestration areasStanislav Pilipenkoenergy_progress
10/30/2025Permanent certificateStanislav Pilipenkoenergy_progress
10/30/2025Interior lighting powerStanislav Pilipenkoenergy_progress
Latest 25 of 52.
36 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account