← Back
One story retail building
1385 WEBSTER AVENUE
BRONX · BIN 2009303
💬 Discuss this project
1931Year Built
1Stories
K1Building Class
R7-1Zoning
8,375 sfGross Floor Area
6Units
15 Open Violations 14 unresolved · 1 paperwork only ▸
One story retail building · Owner of record: BRONX CM CORP · 11,250 sf lot · 0.74 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 12 docs
Floor 1Under Construction5p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1385 REALTY303/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LEVIN ENGINEERING PLLC603/21/2026
FRANK BUENO EXPEDITING1203/21/2026
ARCTONE GROUP INC ARCHITECTS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HT PLUMBING & HEATING CORPlumbing407/08/2026
HALIM MALAJElectrical203/21/2026
ARMA ELECTRIC INCElectrical203/22/2026
SIGNORE & SONS PLBG CORPPlumbing207/08/2026
WNW & SONS PLBG & HTG INCPlumbing207/08/2026
VALLESIGNS AWNINGSScaffold208/27/2026
HORBRIDGE PLUMBING & HEATINGPlumbing108/18/2026
JIMENEZ LUISElectrical103/21/2026
LUIS JIMENEZElectrical103/21/2026
SIGNORE & SONS PLUMBING CGeneral Contractor107/22/2026
UNITED CONSTRUCTION AND DESIGNGeneral Contractor107/08/2026
Building Lifecycle
All (89)Filed (13)Permit Issued (9)Violation (16)Inspection (14)Objection (28)Special Inspection (9)
08/26/2026
Permit issued — Sign
X01421529-I1-SG
08/26/2026
Permit issued — Sign
X01415718-I1-SG
08/25/2026
Filed — Alteration
ERECT AN ILLUMINATED BUSINESS ACCESSORY WALL SIGN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
X01415718-I1
08/21/2026
Filed — Alteration
ERECT AN ILLUMINATED BUSINESS ACCESSORY WALL SIGN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
X01421529-I1
08/17/2026
Permit issued — Plumbing
X00582584-I1-PL
08/14/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/21/2026
Permit issued — General Construction
X00582552-I1-GC
06/24/2026
Special inspection requirement — Final
Israel Wertentheil
06/11/2026
Special inspection requirement — Final
Israel Wertentheil
02/12/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/28/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/28/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/25/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/13/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/13/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/22/2023
Permit issued — Plumbing
X00433667-I1-PL
05/01/2023
Filed — Alteration
Replacement of Plumbing Fixtures and Deli Equipment's for a New Tenant. Upgrade Existing Water Closets & Lavatories to Handicap Useable Fixtures at Existing Locations and Connected to Existing Waste & Service Lines. No Change in Use, Occupancy or Egress.
X00433667-P1
06/16/2022
Filed — Alteration
Installation of new cooking equipment and plumbing fixtures as per plan
X00582584-P3
06/16/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
06/14/2022
Filed — Alteration
Installation of new cooking equipment and plumbing fixtures as per plan
X00582584-P2
06/10/2022
Special inspection requirement — Maintenance information
Dmitry Levin
06/07/2022
Objection resolved — Addressed
06/07/2022
Objection resolved — Addressed
06/05/2022
Objection raised — Other
05/31/2022
Objection raised — Other
05/25/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
05/16/2022
Filed — Alteration
INSTALLATION OF GAS PIPING and NEW GAS METERs ON THE FIRST FLOOR ONLY. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00414703-P2
05/05/2022
Filed — Alteration
Installation of new cooking equipment and plumbing fixtures as per plan
X00582584-P1
03/21/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/18/2022
Filed — Alteration
Installation of two new 4 ton each HVAC unit and one 12 feet long kitchen hood
X00582618-I1
03/10/2022
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
11/29/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/29/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/29/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/15/2021
Permit issued — Plumbing
X00582584-I1-PL
11/08/2021
Permit issued — General Construction
X00582552-I1-GC
11/04/2021
Filed — Alteration
Interior renovation of existing commercial space, no change in use occupancy or egress
X00582552-I1
11/04/2021
Filed — Alteration
Installation of new cooking equipment and plumbing fixtures as per plan
X00582584-I1
11/04/2021
Special inspection requirement — Lighting controls
THEODORE STRAUSS
10/14/2021
Special inspection requirement — Maintenance information
Dmitry Levin
08/24/2021
Special inspection requirement — Fire-Resistance Rated Construction
THEODORE STRAUSS
08/24/2021
Special inspection requirement — Energy Code Compliance Inspections
THEODORE STRAUSS
08/24/2021
Special inspection requirement — Final
THEODORE STRAUSS
05/04/2021
Objection resolved — Addressed
04/28/2021
Objection raised — Other
04/13/2021
Filed — Alteration
INSTALLATION OF GAS PIPING and NEW GAS METERs ON THE FIRST FLOOR ONLY. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00414703-P1
04/12/2021
Special inspection requirement — Maintenance information
Dmitry Levin
02/08/2021
Permit issued — Plumbing
X00414703-I1-PL
12/11/2020
Objection raised — Mechanical
12/11/2020
Objection resolved — Addressed
12/11/2020
Objection raised — Inspections
12/11/2020
Objection resolved — Addressed
12/08/2020
Filed — Alteration
Replacement of Plumbing Fixtures and Deli Equipment's for a New Tenant. Upgrade Existing Water Closets & Lavatories to Handicap Useable Fixtures at Existing Locations and Connected to Existing Waste & Service Lines. No Change in Use, Occupancy or Egress.
X00433667-I1
12/08/2020
Permit issued — Plumbing
X00414703-I1-PL
11/16/2020
Objection resolved — Addressed
11/16/2020
Objection resolved — Addressed
11/10/2020
Objection resolved — Addressed
11/09/2020
Objection resolved — Addressed
11/09/2020
Objection resolved — Addressed
11/05/2020
Objection raised — Other
Latest 60 of 89 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignPermit IssuedVALLESIGNS & AWNINGS INC08/26/2026
DOB NOWSignPermit IssuedVALLESIGNS & AWNINGS INC08/26/2026
DOB NOWPlumbingPermit IssuedHORBRIDGE PLUMBING & HEATING08/17/2026
DOB NOWGeneral ConstructionPermit IssuedSIGNORE & SONS PLUMBING C07/21/2026
DOB NOWPlumbingPermit IssuedHT PLUMBING & HEATING COR06/22/2023
DOB NOWPlumbingPermit IssuedSIGNORE & SONS PLBG CORP11/15/2021
DOB NOWGeneral ConstructionPermit IssuedUNITED CONSTRUCTION AND D11/08/2021
DOB NOWPlumbingSigned-offWNW & SONS PLBG & HTG INC02/08/2021
DOB NOWPlumbingSigned-offWNW & SONS PLBG & HTG INC12/08/2020
BISOTISSUEDFREEDOM GS INC07/21/2021
BISOTISSUEDFREEDOM GS INC12/28/2020
BISFPISSUEDMASTER FIRE SYSTEMS, INC10/03/2007
BISFPISSUEDMASTER FIRE SYSTEMS, INC05/20/2003
BISFPISSUEDMASTER FIRE SYSTEMS, INC03/04/2003
BISOTISSUEDA. INTERNATIONAL LTD.01/30/1996
BISMHISSUEDA. INTERNATIONAL LTD.01/30/1996
BISBLISSUEDWATER PLUS II08/05/1993
BISMHISSUEDSUPER LAUNDRY EQUIP. CORP.08/03/1993
BISEQISSUEDSUPER LAUNDRY EQUIPMENT CORP.07/09/1993
BISSPISSUEDYOST + CAMBELL09/17/1991
BISOTISSUEDSUPER LAUNDRY EQUIP CORP.10/26/1990
1 project · most recent 03/18/2022
Ventilation Systems
FiledStatusContractorScope
03/18/2022——Ventilation Systems
3 projects · most recent 05/01/2023
Gas Water/Sanitary
FiledStatusContractorScope
05/01/2023Permit IssuedHT PLUMBING & HEATING CORGas, Water/Sanitary
06/16/2022Permit IssuedHORBRIDGE PLUMBING & HEATGas, Water/Sanitary
05/16/2022Signed-offWNW & SONS PLBG & HTG INCGas
4 projects · most recent 04/26/2023
General Wiring
FiledStatusContractorScope
04/26/2023CompleteARMA ELECTRIC INC5 meters, 5 new_meters
03/22/2022Permit IssuedASCUATECH ELECTRICAL CORP—
03/16/2022Permit IssuedWCK ELECTRIC CORP.General Wiring
02/07/2018Permit IssuedPOWER SURGE ELECTRIC, INC1 meters, 1 new_meters
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
08/14/2026Pass-Final CND-Occupancy InspectionPassView ↗
02/12/2025Pass-Final CND-Occupancy InspectionPassView ↗
08/28/2024Pass-Final CND-Occupancy InspectionPassView ↗
12/28/2023Pass-Final CND-Occupancy InspectionPassView ↗
09/25/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/13/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/13/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/16/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/25/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
03/21/2022Pass-Final CND-Occupancy InspectionPassView ↗
03/10/2022Fail-Final CND-Occupancy InspectionFailView ↗
11/29/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/29/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/29/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
06/24/2026FinalIsrael Wertentheilprogress
06/11/2026FinalIsrael Wertentheilprogress
06/10/2022Maintenance informationDmitry Levinenergy_progress
11/04/2021Lighting controlsTHEODORE STRAUSSenergy_progress
10/14/2021Maintenance informationDmitry Levinenergy_progress
08/24/2021Fire-Resistance Rated ConstructionTHEODORE STRAUSSprogress
08/24/2021Energy Code Compliance InspectionsTHEODORE STRAUSSprogress
08/24/2021FinalTHEODORE STRAUSSprogress
04/12/2021Maintenance informationDmitry Levinenergy_progress
▾Documents — 67 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch8
08/26/2026X01415718-I1Request digital key ↗
08/25/2026X00582552-I1Request digital key ↗
08/24/2026X00582618-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Plumbing5
08/23/2026X00433667-P1Request digital key ↗
08/15/2026X00433667-I1Request digital key ↗
08/15/2026X00414703-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits7
▸BISPLAN / WORK APPROVAL APPLICATION5
04/20/2023240291849Open ↗
04/19/2023240291849Open ↗
12/04/2020240291849Open ↗
Showing 3 of 5 on file for this type
▸BISWORK PERMIT APPLICATION2
12/28/2020240291849Open ↗
10/03/2007210014991Open ↗
▸Seals & Professional Certifications24
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/26/2026X01415718-I1Open ↗
08/25/2026X00414703-P2Open ↗
08/25/2026X00414703-P1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/23/2026X01421529-I1Open ↗
09/23/2026X01415718-I1Open ↗
08/29/2026X00582552-I1Open ↗
Showing 3 of 9 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
10/30/2020240291849Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
09/24/2007210014991Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING1
09/24/2007210014991Open ↗
▸Environmental & Asbestos15
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
08/26/2026X01415718-I1Open ↗
08/25/2026X00582552-I1Open ↗
08/24/2026X00582618-I1Open ↗
Showing 3 of 13 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
09/24/2007210014991Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/30/2020240291849Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
10/30/2020240291849Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
10/30/2020240291849Open ↗
▸Approvals, Objections & Sign-offs1
▸BISADMINISTRATIVE OBJECTIONS1
09/24/2007210014991Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
05/01/2023240291849Open ↗
10/30/2020240291849Open ↗
10/03/2007210014991Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
10/30/2020240291849Open ↗