← Back
Two family converted from one family
139-10 97 AVENUE
QUEENS · Jamaica · BIN 4214243
💬 Discuss this project
1925Year Built
2.75Stories
B3Building Class
R5Zoning
1,905 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family converted from one family · 4,000 sf lot · 0.48 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Floor 191p · 1 filing · 16 docs
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
Cellar1p · 1 filing · 16 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/18/2022$650K—— → —$341/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MBTORRE ARCHITECTS AND PLANNERS305/23/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
5BOROUGH CONSUTING EXPEDITING603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
P3 PROJECTS HOME IMPROVEMGeneral Contractor603/21/2026
ZONE PLUMBING & HEATING CPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MARTIN B TORRE ARHITECTUR3419305/23/2023
Building Lifecycle
All (45)Filed (3)Permit Issued (3)Signed Off (2)Violation (8)Inspection (4)Objection (4)Special Inspection (21)
07/05/2023
Signed off — Alteration
Replace kitchen and bathroom fixtures with new fixtures at same location. Replace boilers in cellar with two new units of Navien gas combination boiler /heater.
Q08036497-I1
06/23/2023
Signed off — Alteration
Q08034471-I1
06/06/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/01/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MARTIN TORRE
06/01/2023
Special inspection requirement — HVAC-R and service water heating system controls
MARTIN TORRE
06/01/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
MARTIN TORRE
06/01/2023
Special inspection requirement — HVAC-R and service water heating equipment
MARTIN TORRE
06/01/2023
Special inspection requirement — Energy Code Compliance Inspections
MARTIN TORRE
05/30/2023
Objection resolved — Addressed
05/26/2023
Objection raised — Scope
05/23/2023
Filed — Alteration
Replace kitchen and bathroom fixtures with new fixtures at same location. Replace boilers in cellar with two new units of Navien gas combination boiler /heater.
Q08036497-P1
05/22/2023
Special inspection requirement — Energy Code Compliance Inspections
MARTIN TORRE
05/22/2023
Special inspection requirement — HVAC-R and service water heating equipment
MARTIN TORRE
05/22/2023
Special inspection requirement — HVAC-R and service water heating system controls
MARTIN TORRE
05/22/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
MARTIN TORRE
05/22/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MARTIN TORRE
05/15/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/05/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/05/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/20/2023
Permit issued — Plumbing
Q08036497-I1-PL
02/08/2023
Permit issued — General Construction
Q08034471-I1-MS
02/08/2023
Permit issued — General Construction
Q08034471-I1-GC
12/03/2022
Objection raised — Scope
12/03/2022
Objection resolved — Addressed
11/28/2022
Filed — Alteration
Replace kitchen and bathroom fixtures with new fixtures at same location. Replace boilers in cellar with two new units of Navien gas combination boiler /heater.
Q08036497-I1
11/28/2022
Filed — Alteration
Q08034471-I1
11/20/2022
Special inspection requirement — Heating Systems
MARTIN TORRE
11/19/2022
Special inspection requirement — Energy Code Compliance Inspections
MARTIN TORRE
11/19/2022
Special inspection requirement — Fire-Resistance Rated Construction
MARTIN TORRE
11/08/2022
Special inspection requirement — Air barrier - visual inspection
MARTIN TORRE
11/08/2022
Special inspection requirement — Fenestration areas
MARTIN TORRE
11/08/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
MARTIN TORRE
11/08/2022
Special inspection requirement — Fenestration air leakage
MARTIN TORRE
11/08/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
MARTIN TORRE
11/08/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
MARTIN TORRE
11/04/2022
Special inspection requirement — Final
MARTIN TORRE
11/04/2022
Special inspection requirement — Mechanical Systems
MARTIN TORRE
05/20/2022
Violation issued (ECB, closed)
Construction
02/03/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/02/2020
Violation issued (ECB, closed)
Construction
11/02/2020
Violation issued (ECB, closed)
Unknown
11/02/2020
Violation issued (ECB, closed)
Construction
07/26/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/06/2017
Violation issued (ECB, closed)
Construction
04/29/2017
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offZONE PLUMBING & HEATING C04/20/2023
DOB NOWGeneral ConstructionSigned-offP3 PROJECTS HOME IMPROVEM02/08/2023
DOB NOWGeneral ConstructionSigned-offP3 PROJECTS HOME IMPROVEM02/08/2023
2 projects · most recent 08/18/2023
General Wiring
FiledStatusContractorScope
08/18/2023Permit IssuedBERARDI ELEC'L CONTR'G IN1 meters, 1 new_meters
02/22/2021CompleteWORD OF LIGHT ELECT LLCGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
06/06/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/15/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/05/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/05/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
06/01/2023Fire-Resistant Penetrations and JointsMARTIN TORREspecial
06/01/2023HVAC-R and service water heating system controlsMARTIN TORREenergy_progress
06/01/2023HVAC-R and service water piping design and insulationMARTIN TORREenergy_progress
06/01/2023HVAC-R and service water heating equipmentMARTIN TORREenergy_progress
06/01/2023Energy Code Compliance InspectionsMARTIN TORREprogress
05/22/2023Energy Code Compliance InspectionsMARTIN TORREprogress
05/22/2023HVAC-R and service water heating equipmentMARTIN TORREenergy_progress
05/22/2023HVAC-R and service water heating system controlsMARTIN TORREenergy_progress
05/22/2023HVAC-R and service water piping design and insulationMARTIN TORREenergy_progress
05/22/2023Fire-Resistant Penetrations and JointsMARTIN TORREspecial
11/20/2022Heating SystemsMARTIN TORREspecial
11/19/2022Energy Code Compliance InspectionsMARTIN TORREprogress
11/19/2022Fire-Resistance Rated ConstructionMARTIN TORREprogress
11/08/2022Air barrier - visual inspectionMARTIN TORREenergy_progress
11/08/2022Fenestration areasMARTIN TORREenergy_progress
11/08/2022Fenestration and door U-factor and product ratingsMARTIN TORREenergy_progress
11/08/2022Fenestration air leakageMARTIN TORREenergy_progress
11/08/2022Fire-Resistant Penetrations and JointsMARTIN TORREspecial
11/08/2022Structural Stability – Alterations of existing buildingsMARTIN TORREspecial
11/04/2022FinalMARTIN TORREprogress
11/04/2022Mechanical SystemsMARTIN TORREspecial
▾Documents — 30 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/25/2026Q08034471-I1Request digital key ↗
08/15/2026Q08036497-I1Request digital key ↗
08/14/2026Q08036497-P1Request digital key ↗
▸Seals & Professional Certifications24
▸DOB NOWProgress Inspector Seal & Signature15
08/29/2026Q08034471-I1Open ↗
08/29/2026Q08034471-I1Open ↗
08/29/2026Q08034471-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/29/2026Q08034471-I1Open ↗
08/29/2026Q08034471-I1Open ↗
08/29/2026Q08034471-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/25/2026Q08034471-I1Open ↗
08/13/2026Q08036497-I1Open ↗
08/13/2026Q08036497-P1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/25/2026Q08034471-I1Open ↗
08/13/2026Q08036497-I1Open ↗
08/13/2026Q08036497-P1Open ↗