← Back
Elevator cooperative
139-19 31 ROAD
QUEENS · BIN 4440070
💬 Discuss this project
1957Year Built
6Stories
D4Building Class
R5Zoning
180,262 sfGross Floor Area
162Units
LL97 CoveredRent Stabilized20 Open Violations 19 unresolved · 1 paperwork only ▸FISP: SAFEFDNY Report ↗
Elevator cooperative · Owner of record: EMBASSY COOP INC · 94,000 sf lot · 1.92 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
4 jobs · most recent 11/11/2021
Boiler Controls
FiledStatusContractorScope
11/11/2021Permit IssuedRICHARD NEU—
10/05/2021CompleteBRANDL ELECTRIC INC.Boiler Controls
11/26/2020Permit IssuedRICHARD NEU—
02/26/2019Permit IssuedRICHARD NEU—
2 jobs · most recent 11/06/2021
Sidewalk Shed
FiledStatusContractorScope
11/06/2021Permit IssuedARAMCO CONTRACTING LLCSidewalk Shed
02/26/2019Permit IssuedJASCO, INCSidewalk Shed
Building Lifecycle
All (75)Filed (3)Permit Issued (4)Signed Off (1)Facade (FISP) (12)Violation (54)Special Inspection (1)
05/07/2026
Violation issued (HPD, closed)
A
12/18/2025
Violation issued (FDNY_NOV, closed)
07/24/2025
Violation issued (ECB, closed)
Elevators
06/12/2025
Violation issued (HPD, closed)
A
03/26/2025
Violation issued (HPD, open)
B
03/26/2025
Violation issued (HPD, closed)
C
03/26/2025
Violation issued (HPD, open)
C
03/26/2025
Violation issued (HPD, open)
B
03/26/2025
Violation issued (HPD, open)
C
03/26/2025
Violation issued (HPD, open)
C
07/01/2024
Cycle 9 facade report signed — SAFE
04/16/2024
Violation issued (HPD, closed)
A
04/03/2024
Violation issued (ECB, open)
Construction
02/20/2024
Cycle 9 facade report submitted
02/13/2024
Cycle 9 facade inspection completed
11/24/2023
Violation issued (HPD, closed)
I
06/22/2023
Violation issued (HPD, closed)
C
06/02/2023
Violation issued (HPD, closed)
C
06/02/2023
Violation issued (HPD, closed)
C
11/15/2022
Violation issued (HPD, closed)
I
08/18/2022
Signed off — Alteration
Q00431937-I1
12/23/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/08/2021
Permit issued — Sidewalk Shed
Q00623981-I1-SH
11/06/2021
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q00623981-I1
12/23/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/16/2020
Permit issued — Sidewalk Shed
Q00431937-I1-SH
11/25/2020
Permit issued — Sidewalk Shed
Q00431937-I1-SH
11/24/2020
Filed — Alteration
Q00431937-I1
11/23/2020
Special inspection requirement — Final
RAFI HAMID
11/20/2020
Violation issued (ECB, closed)
Construction
09/22/2020
Violation issued (ECB, closed)
Construction
01/28/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/03/2019
Cycle 8 facade inspection completed
12/01/2019
Cycle 8 facade report signed — SWARMP
10/24/2019
Cycle 8 facade report submitted
04/30/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/06/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/27/2019
Permit issued — Sidewalk Shed
Q00135654-I1-SH
02/26/2019
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE.
Q00135654-I1
01/12/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/11/2018
Violation issued (ECB, closed)
Construction
10/25/2018
Violation issued (HPD, closed)
I
02/01/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/26/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/07/2017
Violation issued (HPD, closed)
I
11/14/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/19/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/18/2015
Violation issued (FDNY_NOV, closed)
08/06/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/08/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/09/2014
Cycle 7 facade report submitted
12/31/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/22/2013
Cycle 7 facade inspection completed
11/22/2013
Cycle 7 facade report signed — SWARMP
06/24/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/08/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/15/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/03/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/13/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/13/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 75 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ARAMCO CONTRACTING1107/08/2026
JASCO603/22/2026
EMBASSY COOP INC FIRST MA203/22/2026
FIRST MANAGEMENT703/22/2026
EMBASSY CORP INC/FIRST MA103/22/2026
OWNER OF PREMISES103/22/2026
EMBASSY CORP INC103/22/2026
EMBASSY COOPERATIVE INC203/21/2026
EMBASSY CO-OP103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SYED ENGINEERING, P.C.211/06/2021
GREEN DESIGN102/26/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES203/21/2026
ATLANTIC BUILDING SUPPLY INC.203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RICHARD NEUElectrical303/22/2026
ATLAS NY CONSTRUCTION CORPGeneral Contractor303/21/2026
JASCO, INCGeneral Contractor303/21/2026
ARAMCO CONTRACTING LLCGeneral Contractor207/08/2026
PATRICK POLLARIElectrical103/21/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedARAMCO CONTRACTING LLC11/08/2021
DOB NOWSidewalk ShedSigned-offARAMCO CONTRACTING LLC12/16/2020
DOB NOWSidewalk ShedSigned-offATLAS NY CONSTRUCTION COR11/25/2020
DOB NOWSidewalk ShedPermit IssuedJASCO, INC02/27/2019
BISBLISSUEDS.J. FUEL CO., INC06/12/2019
BISOTISSUEDNY WONDER CONSTRUCTION CORP04/23/2019
BISFSISSUEDLEONARD R SIBRIZZI06/25/2008
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
11/23/2020FinalRAFI HAMIDprogress
▾Documents — 62 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch - Sidewalk Shed2
08/28/2026Q00135654-I1Request digital key ↗
08/27/2026Q00431937-I1Request digital key ↗
▸DOB NOWPlans/Sketch1
08/27/2026Q00623981-I1Request digital key ↗
▸Applications & Permits10
▸BISWORK PERMIT APPLICATION7
06/21/2019421921497Open ↗
06/21/2019421921497Open ↗
05/24/2019440544163Open ↗
Showing 3 of 7 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION3
06/21/2019421921497Open ↗
04/22/2019440544163Open ↗
05/27/2008410115708Open ↗
▸Seals & Professional Certifications16
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
10/15/2019440544163Open ↗
06/21/2019421921497Open ↗
03/10/2009410115708Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/27/2026Q00431937-I1Open ↗
08/13/2026Q00623981-I1Open ↗
08/13/2026Q00135654-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
06/21/2019421921497Open ↗
04/22/2019440544163Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
06/21/2019421921497Open ↗
05/27/2008410115708Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
04/22/2019440544163Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
04/22/2019440544163Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
05/27/2008410115708Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/01/2026Q00431937-I1Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
06/21/2019421921497Open ↗
05/27/2008410115708Open ↗
▸Safety & Tenant Protection3
▸BISTenant Protection Plan and Notes2
06/21/2019421921497Open ↗
04/22/2019440544163Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026Q00431937-I1Open ↗
▸Environmental & Asbestos3
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
06/21/2019421921497Open ↗
04/22/2019440544163Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
05/27/2008410115708Open ↗
▸Energy Compliance8
▸BISAS-BUILT ENERGY ANALYSIS3
06/21/2021421921497Open ↗
06/14/2021421921497Open ↗
10/15/2019440544163Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
06/17/2021421921497Open ↗
04/22/2019440544163Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
06/21/2019421921497Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
04/22/2019440544163Open ↗
▸BISNYCECC ANALYSIS1
04/22/2019440544163Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY2
06/17/2021421921497Open ↗
04/22/2019440544163Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
10/15/2019440544163Open ↗
▸Approvals, Objections & Sign-offs4
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
06/21/2021421921497Open ↗
10/15/2019440544163Open ↗
03/10/2009410115708Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
05/27/2008410115708Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT6
06/15/2021421921497Open ↗
10/15/2019440544163Open ↗
06/21/2019421921497Open ↗
Showing 3 of 6 on file for this type
▸Filing & Intake Forms4
▸BISEFILING COVER SHEET2
06/21/2019421921497Open ↗
05/27/2008410115708Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
04/22/2019440544163Open ↗
▸BISADDITIONAL INFORMATION1
10/07/2019440544163Open ↗