← Back
BuildNYC
Primarily 1 family with 1 store or office
139-19 72ND ROAD
QUEENS · BIN 4142313
💬 Discuss this project
1940Year Built
2Stories
S1Building Class
R2XZoning
2,312 sfGross Floor Area
2Units
10 Active Violations 3 unresolved · 7 paperwork only 2 old, status unconfirmed ▸FDNY Report ↗
Primarily 1 family with 1 store or office · 4,000 sf lot · 0.58 FAR built · Flood zone X
Locations of Work
StructuralPlumbingOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
AtticOutdoor area electric light replacement4p · 1 filing · 9 docs
Floor 2Outdoor area electric light replacement4p · 1 filing · 9 docs
Floor 1Outdoor area electric light replacement5p · 2 filings · 13 docs
CellarFirst floor framing repair1 filing · 4 docs
Site & exteriorOutdoor area electric light replacement4p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Owner of 139-19 72 Road103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
New York & Company310/13/2023
MLS Complete Engineering108/02/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
New York & Company603/21/2026
Mark Hertz103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Sema ContractingGeneral Contractor303/21/2026
DMT Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
New York Engineering Associates851310/13/2023
Citiscape Consulting762108/02/2022
Building Lifecycle
All (52)Filed (4)Permit Issued (2)Signed Off (2)Violation (28)Inspection (4)Objection (6)Special Inspection (6)
11/25/2025
Violation issued (ECB, open)
Construction
11/08/2023
Signed off — Alteration
REPLACE GAS METER AND PIPING TO GAS APPLIANCES.
Q00831117-I1
10/16/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
LOUIS ARENA
10/13/2023
Filed — Alteration
REPLACE GAS METER AND PIPING TO GAS APPLIANCES.
Q00831117-P2
10/12/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
LOUIS ARENA
10/05/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/03/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/25/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/21/2023
Filed — Alteration
REPLACE GAS METER AND PIPING TO GAS APPLIANCES.
Q00831117-P1
09/20/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
LOUIS ARENA
09/19/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/08/2023
Permit issued — Plumbing
Q00831117-I1-PL
03/14/2023
Filed — Alteration
REPLACE GAS METER AND PIPING TO GAS APPLIANCES.
Q00831117-I1
12/08/2022
Signed off — Alteration
EMERGENCY REPLACEMENT OF FIRE DAMAGED JOISTS TO ADDRESS D.O.B.VIOLATION AND VACATE ORDER AND CONDITIONAL STRUCTURAL REPAIRS AS PER PLANS
Q00786118-I1
09/07/2022
Permit issued — Structural
Q00786118-I1-ST
08/08/2022
Special inspection requirement — Structural Wood Frame
Joe Lieberman
08/05/2022
Objection raised — Inspections
08/05/2022
Objection resolved — Addressed
08/05/2022
Objection raised — Admin
08/05/2022
Objection resolved — Addressed
08/05/2022
Objection raised — Admin
08/05/2022
Objection resolved — Addressed
08/02/2022
Filed — Alteration
EMERGENCY REPLACEMENT OF FIRE DAMAGED JOISTS TO ADDRESS D.O.B.VIOLATION AND VACATE ORDER AND CONDITIONAL STRUCTURAL REPAIRS AS PER PLANS
Q00786118-I1
08/02/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Joe Lieberman
08/02/2022
Special inspection requirement — Final
Joe Lieberman
07/28/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/28/2022
Violation issued (ECB, open)
Construction
05/16/2018
Violation issued (ECB, open)
Construction
04/03/2018
Violation issued (ECB, open)
Construction
02/14/2018
Violation issued (ECB, open)
Construction
12/29/2017
Violation issued (ECB, open)
Construction
11/17/2017
Violation issued (ECB, open)
Construction
10/04/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/28/2017
Violation issued (ECB, closed)
Construction
07/06/2017
Violation issued (ECB, open)
Construction
05/16/2001
Violation issued (DOB, closed)
VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE
05/16/2001
Violation issued (ECB, open)
Construction
09/20/2000
Violation issued (DOB, closed)
VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE
09/20/2000
Violation issued (ECB, open)
Construction
10/23/1999
Violation issued (ECB, closed)
Construction
07/30/1999
Violation issued (DOB, closed)
VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE
07/30/1999
Violation issued (ECB, closed)
Construction
05/10/1999
Violation issued (ECB, closed)
Construction
02/12/1998
Violation issued (ECB, closed)
Construction
01/23/1998
Violation issued (ECB, closed)
Construction
12/14/1995
Violation issued (ECB, closed)
Construction
12/14/1995
Violation issued (ECB, closed)
Construction
03/26/1993
Violation issued (ECB, closed)
Construction
03/26/1993
Violation issued (ECB, closed)
Construction
11/17/1989
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
11/06/1989
Violation issued (ECB, closed)
Construction
11/03/1989
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offDMT Plumbing & Heating Co06/08/2023
DOB NOWStructuralSigned-offSema Contracting09/07/2022
1 project · most recent 08/02/2022
General Wiring
FiledStatusContractorScope
08/02/2022Permit IssuedBrandl ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
10/05/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/03/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/25/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/19/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
10/16/2023Fire-Resistant Penetrations and JointsLOUIS ARENAspecial
10/12/2023Fire-Resistant Penetrations and JointsLOUIS ARENAspecial
09/20/2023Fire-Resistant Penetrations and JointsLOUIS ARENAspecial
08/08/2022Structural Wood FrameJoe Liebermanprogress
08/02/2022Structural Stability – Alterations of existing buildingsJoe Liebermanspecial
08/02/2022FinalJoe Liebermanprogress
▾Documents — 17 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/24/2026Q00831117-P2Request digital key ↗
08/24/2026Q00831117-I1Request digital key ↗
08/24/2026Q00831117-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/26/2026Q00786118-I1Open ↗
08/24/2026Q00831117-P1Open ↗
08/24/2026Q00831117-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/27/2026Q00831117-P1Open ↗
08/26/2026Q00831117-P2Open ↗
08/23/2026Q00786118-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature1
08/23/2026Q00786118-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/24/2026Q00831117-P1Open ↗
08/24/2026Q00831117-I1Open ↗
08/24/2026Q00831117-P2Open ↗
Showing 3 of 4 on file for this type