Two family frame
139-40 87 ROAD
QUEENS · BIN 4207172
💬 Discuss this project
1920Year Built
2Stories
B2Building Class
R4-1Zoning
1,600 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family frame · 2,400 sf lot · 0.67 FAR built · Flood zone X
Locations of Work
Architecture
Cellar3p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TO THE OWNER OF203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BASSIRI204/30/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARCHVISION DESIGN STUDIO103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AKHTAR CONSTRUCTION CO INGeneral Contractor203/21/2026
M & M PIPING AND HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BASSIRI8394204/30/2025
Building Lifecycle
All (42)Filed (2)Permit Issued (2)Signed Off (2)Violation (7)Inspection (7)Objection (16)Special Inspection (6)
05/20/2026
Signed off — Alteration
FILED FOR ADDRESS ECB VIOLATION # 39146103H;39146104J;39146105L;39146106N;39146107P AT EXPOSUER #4 INSTALL CONCRETE RETAINING WALL, SPLIT AIR CONDITION UNIT AT REAR. AT 1ST FLOOR LEVEL, NEW SHEETROCK, VINYL FLOOR, COSMATIC PAINTS. CERAMIC TILES
Q01217450-I1
04/08/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
04/02/2026
Signed off — Alteration
FILED FOR ADDRESS ECB VIOLATION # 39146103H;39146104J;39146105L;39146106N;39146107P AT EXPOSUER #4 INSTALL CONCRETE RETAINING WALL, SPLIT AIR CONDITION UNIT AT REAR. AT 1ST FLOOR LEVEL, NEW SHEETROCK, VINYL FLOOR, COSMATIC PAINTS. CERAMIC TILES
Q01217450-S1
03/02/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/25/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/29/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/19/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/19/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/01/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/24/2025
Permit issued — Plumbing
Q01217450-S1-PL
06/24/2025
Permit issued — Foundation
Q01217450-I1-GC-CX
06/18/2025
Objection resolved — Addressed
06/16/2025
Objection resolved — Addressed
06/16/2025
Objection resolved — Addressed
06/16/2025
Objection resolved — Addressed
06/16/2025
Objection resolved — Addressed
06/16/2025
Objection resolved — Addressed
06/05/2025
Objection raised — Other
06/05/2025
Objection raised — Cost
06/05/2025
Objection raised — Other
06/05/2025
Objection raised — Admin
05/20/2025
Objection resolved — Addressed
05/20/2025
Objection resolved — Addressed
05/19/2025
Objection raised — Other
05/19/2025
Objection raised — Other
05/19/2025
Objection raised — Other
05/19/2025
Objection raised — Other
04/30/2025
Filed — Alteration
FILED FOR ADDRESS ECB VIOLATION # 39146103H;39146104J;39146105L;39146106N;39146107P AT EXPOSUER #4 INSTALL CONCRETE RETAINING WALL, SPLIT AIR CONDITION UNIT AT REAR. AT 1ST FLOOR LEVEL, NEW SHEETROCK, VINYL FLOOR, COSMATIC PAINTS. CERAMIC TILES
Q01217450-I1
04/30/2025
Filed — Alteration
FILED FOR ADDRESS ECB VIOLATION # 39146103H;39146104J;39146105L;39146106N;39146107P AT EXPOSUER #4 INSTALL CONCRETE RETAINING WALL, SPLIT AIR CONDITION UNIT AT REAR. AT 1ST FLOOR LEVEL, NEW SHEETROCK, VINYL FLOOR, COSMATIC PAINTS. CERAMIC TILES
Q01217450-S1
04/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
04/28/2025
Special inspection requirement — Mechanical Systems
FARHAD BASSIRI-TEHRANI
04/28/2025
Special inspection requirement — Concrete - Cast-In-Place
FARHAD BASSIRI-TEHRANI
04/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
04/28/2025
Special inspection requirement — Final
FARHAD BASSIRI-TEHRANI
04/28/2025
Special inspection requirement — Footing and Foundation
FARHAD BASSIRI-TEHRANI
04/25/2025
Violation issued (ECB, closed)
Construction
04/25/2025
Violation issued (ECB, closed)
Unknown
04/25/2025
Violation issued (ECB, closed)
Construction
04/25/2025
Violation issued (ECB, closed)
Construction
04/25/2025
Violation issued (ECB, closed)
Construction
04/15/1998
Violation issued (ECB, closed)
Quality of Life
04/15/1998
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offM & M PIPING AND HEATING06/24/2025
DOB NOWFoundationSigned-offAKHTAR CONSTRUCTION CO IN06/24/2025
1 project · most recent 04/30/2025
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
04/30/2025Signed-offAKHTAR CONSTRUCTION CO INAir Conditioning Systems
Cooling
Kinghome KM30H50 30,000 BTU · Condensing Unit ×1
1 project · most recent 04/30/2025
Water/Sanitary
FiledStatusContractorScope
04/30/2025Signed-offM & M PIPING AND HEATINGWater/Sanitary
1 project · most recent 06/20/2025
General Wiring
FiledStatusContractorScope
06/20/2025CompleteVILLAGE ELECTL CONTRS INCGeneral Wiring
1 project · most recent 04/30/2025
FiledStatusContractorScope
04/30/2025Signed-offM & M PIPING AND HEATING1 scope_items
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
04/08/2026Fail-Final General Construction Non-Directive 14FailView ↗
03/02/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/25/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/29/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/19/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/19/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/01/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
04/29/2025Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
04/28/2025Mechanical SystemsFARHAD BASSIRI-TEHRANIspecial
04/28/2025Concrete - Cast-In-PlaceFARHAD BASSIRI-TEHRANIspecial
04/28/2025Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
04/28/2025FinalFARHAD BASSIRI-TEHRANIprogress
04/28/2025Footing and FoundationFARHAD BASSIRI-TEHRANIprogress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/20/2026Q01217450-S1Request digital key ↗
08/20/2026Q01217450-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026Q01217450-S1Open ↗
08/13/2026Q01217450-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/27/2026Q01217450-I1Open ↗
08/25/2026Q01217450-S1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/27/2026Q01217450-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026Q01217450-S1Open ↗
08/13/2026Q01217450-I1Open ↗