DOB08/09/2005WORK DOES NOT CONFORM TO APPROVED PLANS. NOTED: THE FOLLOWING IS INDICATED ON PLANS BUT ELIMINATED AT ATTIC. 3 SKYLIGHTS, 2WINDOWS ELEVATORS ,A/C UNIT IN STORAGE OF WOOD JOISTS FOR C-JOISTS THROUGHOUT SUBSTITUTION OF WOOD JOISTS FOR C-JOISTS REMEDY: CONFORM TO APPROVED PLANS
DOB08/09/2005THE BOROUGH COMMISINER REVOKED HAS ISSUED A 10-DAY LETTER OF INTENT TO REVOKE APPLICATION #301827263 ON 8/9/05 & HAS OREDERED ALL WORK STOPPED REMEDY: STOP ALL WORK CALL D.O.B
DOB04/13/2005V-DOB VIOLATION - ACTIVE
ECB11/24/2009ZONING NON-CONFORMING REGARDING LOCATION OF OPEN OFF-STREET PARKING SPACES ON R3-1ZONE. NOTE AT FRONT YARD OF PROPERTY OBSERVED 2 VECHILES PARKED, ONE BLACK BMW WITH LIC PLATE#EKL-3515 & 1 WHT LEXUS #DUB-3814 BNothing owed — awaiting certificate of correction
ECB06/29/2009ZR23-631(B) & ZR23-141(B).ZONING NON-CONFORMING REGARDING PERIMETER WALL HEIGHT & FLOOR AREA RATIO (FAR) IN R3-1 ZONE.NOTE:PERIMETER WALL HEIGHT AT FRONT & THE SIDES OF 2 STORY & ATTIC DWELLING EXCEEDS THE PERMNothing owed — awaiting certificate of correction
ECB03/31/2005FAILURE TO PROTECT ADJOING STURYCTURES DURING EXCAVATION OPERATIONS FAILURE TO PROTECT ADJOING GROUND ON 135 BEAUMONT STREET APPROX 1'X 2 & 6' DEEP DROPPED DUE TO THE SETTLEMENT NEAR STEPS OF NEW BUILDING (PERMNothing owed — awaiting certificate of correction
ECB12/09/2004WORK CONTRARY TO APPROVED PLANS UPON INSP AT ABOVE PROPERTY ALT WAS INPROGRESS INSTALLATION STEEL COLUMNS AND BEAMS 182 FLOOR AND NOTED 1)BUILDING WAS DEMOLISHED TO GRADE LEVEL FOUND WALLS IN PLACE ADDITIONALNothing owed — awaiting certificate of correction