Elevator cooperative
139 CHAMBERS STREET
MANHATTAN · BIN 1001500
💬 Discuss this project
1915Year Built
10Stories
D4Building Class
C6-3AZoning
25,473 sfGross Floor Area
11Units
LL97 CoveredRent Stabilized6 Open Violations ▸FISP: SAFEFDNY Report ↗
Elevator cooperative · Owner of record: WEST CHAMSON CORP · 2,380 sf lot · 10.7 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire Protection
Roof1p · 1 filing · 20 docs
Bulkhead1p · 1 filing · 20 docs
Floor 59p · 3 filings · 13 docs
Floor 4
Floor 3
Floor 2
Floor 19p · 2 filings · 10 docs
Cellar13p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
A W R GROUP1007/08/2026
SAEEL SYSTEM LLC103/22/2026
QUALITY BLDG CONSTRUCTION103/22/2026
STEEL SYSTEM LLC103/22/2026
WEST CHANSOM CORP. C/O AN103/22/2026
OWNER OF 1 HUDSON ST103/22/2026
WEST CANNMSON CORP103/22/2026
ANDREWS BUILDING CORP203/21/2026
NBX ACQUISITION303/21/2026
JOVIL CONTRACTING403/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BAC Developers Group603/21/2026
J CALLAHAN CONSULTING1003/21/2026
OUTSOURCE CONSULTANTS, INC.403/21/2026
DISTINCT ENTERPRISES203/21/2026
CSMR DESIGNS603/21/2026
SYNERGY BUILDING CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ANDAMIO SCAFFOLDING LLCGeneral Contractor607/08/2026
MC SQUARED CORPGeneral Contractor607/08/2026
SGI VISUALSScaffold507/08/2026
J&J DESIGNS INCGeneral Contractor507/08/2026
A W R GROUP INCGeneral Contractor307/08/2026
DA SILVA, JAMESElectrical303/21/2026
METHOD GENERAL CONTRACTORGeneral Contractor207/08/2026
QMB PLUMBING & HTG INCFire Protection107/08/2026
DORNEVIL, DAVIDElectrical103/21/2026
CUSTOM CARE RESTORATION IGeneral Contractor107/08/2026
AMC ELEC'L SERVICES, INC.Electrical103/22/2026
PRIME PIPING & HEATING INPlumbing107/08/2026
QMB PLUMBING & HEATING INCPlumbing107/08/2026
RAMDATHSINGH, PURANElectrical103/21/2026
FINTAN MURRAYElectrical103/21/2026
SCHNABOLK, CHARLESElectrical103/21/2026
PRIME PIPING & HEATING INFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
OUTSOURCE SPECIAL INSPECT2827411/15/2024
VICTOR SUBEN6672304/22/2024
KZ ENGINEERING, P.C.4665103/07/2024
ALAN MARGOLIN & ASSOC423201/25/2024
R M & E ENGINEERINC PLLC3030111/21/2023
HRF SERVICES CORP5616608/29/2022
Building Lifecycle
All (204)Filed (28)Permit Issued (27)Signed Off (10)Facade (FISP) (18)Violation (60)Inspection (15)Objection (16)Special Inspection (30)
02/04/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/30/2025
Permit issued — General Construction
M00971657-I1-GC
09/22/2025
Violation issued (FDNY_NOV, closed)
09/19/2025
Signed off — Alteration
FILING HEREWITH MODIFICATION OF HVAC SYSTEM AS INDICATED ON THE DRAWINGS. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
M00993055-I1
03/04/2025
Signed off — Alteration
Installation of suspended scaffold during facade inspection/ repair. SR23/2742
M01016311-I1
02/20/2025
Signed off — Alteration
TEMPORARY STRUCTURAL BRACING AND PARTIAL DEMOLITION DURING FACADE REPAIRS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00936758-I1
02/11/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/14/2025
Signed off — Alteration
M00827757-I1
01/07/2025
Signed off — Alteration
TEMPORARY STRUCTURAL BRACING AND PARTIAL DEMOLITION DURING FACADE REPAIRS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00936758-S2
12/27/2024
Cycle 9 facade report signed — SAFE
12/12/2024
Cycle 9 facade report submitted
12/06/2024
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY LIGHT DUTY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00952553-I1
12/05/2024
Special inspection requirement — Structural Steel - Welding
JONAR MADRIAGA
12/05/2024
Special inspection requirement — Tenant Protection Plan Compliance
JONAR MADRIAGA
12/05/2024
Special inspection requirement — Final
Nicholas Ferrara
12/05/2024
Special inspection requirement — Air barrier - visual inspection
Nicholas Ferrara
12/05/2024
Special inspection requirement — Construction Operations Influencing Adjacent Structures
JONAR MADRIAGA
12/05/2024
Special inspection requirement — Post-installed Anchors
JONAR MADRIAGA
12/05/2024
Special inspection requirement — Structural Steel - High Strength Bolting
JONAR MADRIAGA
12/05/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
JONAR MADRIAGA
12/05/2024
Special inspection requirement — Masonry
JONAR MADRIAGA
12/04/2024
Cycle 9 facade inspection completed
11/25/2024
Objection raised — Scope
11/25/2024
Objection resolved — Addressed
11/25/2024
Objection raised — Scope
11/25/2024
Objection resolved — Addressed
11/21/2024
Permit issued — Supported Scaffold
M00952553-I1-SF
11/15/2024
Filed — Alteration
TEMPORARY STRUCTURAL BRACING AND PARTIAL DEMOLITION DURING FACADE REPAIRS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00936758-P2
11/06/2024
Signed off — Alteration
Remove/replace water damaged interior non-load bearing partitions, flooring, and ceilings at Residential Unit 3D as indicated on plans. Plumbing fixtures replacement on existing rough-in to be filed under LAA. No change to occupancy, egress, or bulk.
M00957633-I1
10/24/2024
Permit issued — General Construction
M00971657-I1-GC
10/24/2024
Permit issued — Mechanical Systems
M00993055-I1-MS
09/05/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/06/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/06/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
04/25/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/25/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/22/2024
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY LIGHT DUTY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00952553-P2
04/20/2024
Special inspection requirement — Post-installed Anchors
Victor Suben
04/20/2024
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Victor Suben
04/18/2024
Violation issued (ECB, closed)
Construction
04/18/2024
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
03/08/2024
Permit issued — Suspended Scaffold
M01016311-I1-SC
03/07/2024
Filed — Alteration
Installation of suspended scaffold during facade inspection/ repair. SR23/2742
M01016311-I1
03/07/2024
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Karol Zdancewicz
03/07/2024
Special inspection requirement — Post-installed Anchors
Karol Zdancewicz
03/06/2024
Permit issued — Sidewalk Shed
M00827757-I1-SH
03/05/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
JONAR MADRIAGA
03/05/2024
Special inspection requirement — Tenant Protection Plan Compliance
JONAR MADRIAGA
03/05/2024
Special inspection requirement — Final
JONAR MADRIAGA
02/26/2024
Filed — Alteration
TEMPORARY STRUCTURAL BRACING AND PARTIAL DEMOLITION DURING FACADE REPAIRS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00936758-P1
02/23/2024
Permit issued — Mechanical Systems
M00993055-I1-MS
02/21/2024
Permit issued — Sprinklers
M00993087-I1-EW-SP
02/20/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
JONAR MADRIAGA
02/20/2024
Special inspection requirement — Tenant Protection Plan Compliance
JONAR MADRIAGA
02/20/2024
Special inspection requirement — Final
JONAR MADRIAGA
02/12/2024
Permit issued — Structural
M00936758-S2-ST
02/07/2024
Permit issued — Plumbing
M00991872-I1-PL
02/03/2024
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY LIGHT DUTY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00952553-P1
02/02/2024
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Victor Suben
02/02/2024
Special inspection requirement — Post-installed Anchors
Victor Suben
Latest 60 of 204 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offMC SQUARED CORP10/30/2025
DOB NOWSupported ScaffoldSigned-offANDAMIO SCAFFOLDING LLC11/21/2024
DOB NOWGeneral ConstructionPermit IssuedMC SQUARED CORP10/24/2024
DOB NOWMechanical SystemsSigned-offMC SQUARED CORP10/24/2024
DOB NOWSuspended ScaffoldPermit IssuedA W R GROUP INC03/08/2024
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC03/06/2024
DOB NOWMechanical SystemsSigned-offMC SQUARED CORP02/23/2024
DOB NOWSprinklersPermit IssuedQMB PLUMBING & HTG INC02/21/2024
DOB NOWStructuralSigned-offA W R GROUP INC02/12/2024
DOB NOWPlumbingPermit IssuedQMB PLUMBING & HEATING INC02/07/2024
DOB NOWGeneral ConstructionSigned-offA W R GROUP INC01/17/2024
DOB NOWGeneral ConstructionSigned-offMC SQUARED CORP12/14/2023
DOB NOWGeneral ConstructionSigned-offCUSTOM CARE INC12/06/2023
DOB NOWSupported ScaffoldSigned-offANDAMIO SCAFFOLDING LLC11/28/2023
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC03/07/2023
DOB NOWMechanical SystemsPermit IssuedJ&J DESIGNS INC12/29/2022
DOB NOWSignPermit IssuedUNIVERSAL SIGNS & SVC INC06/10/2022
DOB NOWSignPermit IssuedUNIVERSAL SIGNS & SVC INC06/10/2022
DOB NOWSignSigned-offUNIVERSAL SIGNS & SVC INC03/18/2022
DOB NOWSignPermit IssuedUNIVERSAL SIGNS & SVC INC03/18/2022
DOB NOWSignPermit IssuedUNIVERSAL SIGNS & SVC INC03/16/2022
DOB NOWGeneral ConstructionSigned-offJ&J DESIGNS INC12/30/2021
DOB NOWMechanical SystemsPermit IssuedJ&J DESIGNS INC12/30/2021
DOB NOWPlumbingSigned-offA M B MECHANICAL INC12/18/2021
DOB NOWSprinklersSigned-offPRIME PIPING & HEATING IN12/18/2021
DOB NOWMechanical SystemsPermit IssuedMETHOD GENERAL CONTRACTOR12/13/2021
DOB NOWGeneral ConstructionSigned-offMETHOD GENERAL CONTRACTOR12/13/2021
BISPLISSUEDHYDROKINETIC PLBG & HTG I08/13/2020
BISOTISSUEDALBA SERVICES INC04/17/2019
BISMHISSUEDD/A HEATING & COOLING INC02/22/2019
BISOTISSUEDCAMPBELL DESIGN &02/07/2019
BISMHISSUEDICEBERG MECHANICAL CORP04/20/2018
BISMHISSUEDD/A HEATING & COOLING INC03/09/2018
BISSPISSUEDANESIS SERVICES CORP03/08/2018
BISPLISSUEDHYDROKINETIC PLBG & HTG I03/05/2018
BISMHISSUEDICEBERG MECHANICAL CORP03/01/2018
BISOTISSUEDCAMPBELL DESIGN &02/27/2018
BISMHISSUEDALBA SERVICES INC02/06/2018
BISPLISSUEDACCURATE MECHANICAL INC01/18/2018
BISOTISSUEDALBA SERVICES INC01/18/2018
+ 37 more permits on file
1 project · most recent 11/29/2021
Associated Ducts and Piping Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
11/29/2021Permit IssuedJ&J DESIGNS INCAssociated Ducts and Piping, Ventilation Systems
Ventilation
Greenheck SQ-80-VG 600 CFM · Exhaust Fan ×2
Ducts & Piping
Greenheck IDHB 110 kW · Electric Heater ×2
9 projects · most recent 03/25/2026
General Wiring HVAC Wiring
FiledStatusContractorScope
03/25/2026Permit IssuedJAM ELECTRICAL CORP—
06/18/2024CompleteALL WAYS ELECTRIC CORP.WGeneral Wiring, HVAC Wiring
04/29/2024Permit IssuedAMC ELEC'L SERVICES, INC.1 meters, 1 new_meters
02/20/2024CancelledAMC ELEC'L SERVICES, INC.General Wiring
02/10/2023CompleteBOROWIDE ELECT'L CONTR'S—
12/19/2021Permit IssuedRELIABLE ELEC'L CONTR'SGeneral Wiring
05/30/2018CompleteVERDE ELECTRIC CORP.General Wiring
04/03/2018CompleteFAS ELECTRIC, INC.General Wiring
02/16/2018Permit IssuedALEF ELEC'L CONTR'G INC—
▾Field Inspections (DOB CAP) — 16
DateTypeResultReport
02/04/2026Pass-Final CND-Occupancy InspectionPassView ↗
02/11/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/05/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/06/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/06/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
04/25/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/25/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/25/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/18/2024No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
08/24/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/01/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/12/2022Pass-Final Sign Permit InspectionPassView ↗
04/28/2022Fail-Final Sign Permit InspectionFailView ↗
03/07/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/30/2021Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/30/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
12/05/2024Structural Steel - WeldingJONAR MADRIAGAspecial
12/05/2024Tenant Protection Plan ComplianceJONAR MADRIAGAspecial
12/05/2024FinalNicholas Ferraraprogress
12/05/2024Air barrier - visual inspectionNicholas Ferraraenergy_progress
12/05/2024Construction Operations Influencing Adjacent StructuresJONAR MADRIAGAspecial
12/05/2024Post-installed AnchorsJONAR MADRIAGAspecial
12/05/2024Structural Steel - High Strength BoltingJONAR MADRIAGAspecial
12/05/2024Structural Stability – Alterations of existing buildingsJONAR MADRIAGAspecial
12/05/2024MasonryJONAR MADRIAGAspecial
04/20/2024Post-installed AnchorsVictor Subenspecial
04/20/2024Alternative Materials - OTCR Buildings Bulletin NumberVictor Subenspecial
03/07/2024Alternative Materials - OTCR Buildings Bulletin NumberKarol Zdancewiczspecial
03/07/2024Post-installed AnchorsKarol Zdancewiczspecial
03/05/2024Structural Stability – Alterations of existing buildingsJONAR MADRIAGAspecial
03/05/2024Tenant Protection Plan ComplianceJONAR MADRIAGAspecial
03/05/2024FinalJONAR MADRIAGAprogress
02/20/2024Structural Stability – Alterations of existing buildingsJONAR MADRIAGAspecial
02/20/2024Tenant Protection Plan ComplianceJONAR MADRIAGAspecial
02/20/2024FinalJONAR MADRIAGAprogress
02/02/2024Alternative Materials - OTCR Buildings Bulletin NumberVictor Subenspecial
02/02/2024Post-installed AnchorsVictor Subenspecial
01/25/2024Lighting in dwelling unitsCameron Hurstenergy_progress
01/25/2024Maintenance informationCameron Hurstenergy_progress
01/23/2024FinalSteven Harrisprogress
01/19/2024FinalYoung Suhprogress
Latest 25 of 32.
▾Documents — 493 on file (BIS + DOB NOW)
▸Plans & Drawings28
▸DOB NOWPlans/Sketch28
09/03/2026M00593658-P1Request digital key ↗
09/03/2026M00637518-I1Request digital key ↗
09/02/2026M00677897-I1Request digital key ↗
Showing 3 of 28 on file for this type
▸Applications & Permits92
▸BISWORK PERMIT APPLICATION52
08/14/2020123170727Open ↗
02/22/2019123170727Open ↗
02/08/2019123170727Open ↗
Showing 3 of 52 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION39
08/06/2020123170727Open ↗
11/21/2018123170727Open ↗
06/25/2018123170727Open ↗
Showing 3 of 39 on file for this type
▸BISPLACE OF ASSEMBLY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications131
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION59
07/30/2018123361030Open ↗
02/15/2018123361030Open ↗
11/21/2017123170727Open ↗
Showing 3 of 59 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature27
09/03/2026M00593658-I1Open ↗
09/03/2026M00637518-I1Open ↗
09/02/2026M00638344-P2Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature21
09/02/2026M00638344-I1Open ↗
09/02/2026M00638344-P1Open ↗
08/28/2026M00957633-I1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/02/2026M00971657-P1Open ↗
08/28/2026M00957633-I1Open ↗
08/28/2026M00936758-S2Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
02/15/2018123361030Open ↗
Showing 1 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
02/15/2018123361030Open ↗
Showing 1 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment39
▸BISSELF-CERT PLUMBING NOTICE13
12/28/2015121771733Open ↗
12/28/2015121992184Open ↗
11/19/2015121992184Open ↗
Showing 3 of 13 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE12
11/21/2018123170727Open ↗
06/25/2018123170727Open ↗
11/21/2017123170727Open ↗
Showing 3 of 12 on file for this type
▸BISSCHEDULE B - PLUMBING8
08/10/2020123170727Open ↗
Showing 1 of 8 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
07/30/2018123361030Open ↗
04/21/2015121771724Open ↗
Showing 2 of 3 on file for this type
▸BISSPRINKLER INSP REPORT : FP-852
12/28/2015121771733Open ↗
10/01/2015121992184Open ↗
▸BISEQUIPMENT USE PERMITS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection3
▸BISTenant Protection Plan and Notes2
11/21/2017123170727Open ↗
10/19/2017123169980Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
05/27/2014121992184Open ↗
▸Environmental & Asbestos42
▸DOB NOWDEP ACP-5: Asbestos Assessment Report22
09/03/2026M00637518-I1Open ↗
09/02/2026M00638344-P2Open ↗
09/02/2026M00638344-I1Open ↗
Showing 3 of 22 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)12
02/15/2018123361030Open ↗
11/21/2017123170727Open ↗
10/19/2017123169980Open ↗
Showing 3 of 12 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance37
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS21
07/30/2018123361030Open ↗
02/28/2018123170727Open ↗
02/15/2018123361030Open ↗
Showing 3 of 21 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS8
07/20/2020123170727Open ↗
07/30/2018123361030Open ↗
05/10/2016121771270Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
07/20/2020123170727Open ↗
07/20/2020123170727Open ↗
07/20/2020123170727Open ↗
▸BISTR8: Energy Code Progress Inspections3
02/20/2015121919790Open ↗
07/16/2014121992184Open ↗
Showing 2 of 3 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00593658-I1Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY5
07/21/2020123170727Open ↗
07/21/2020123170727Open ↗
07/20/2020123170727Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs33
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST20
11/13/2020123170727Open ↗
07/30/2018123361030Open ↗
06/10/2016121771733Open ↗
Showing 3 of 20 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION8
02/16/2018123170727Open ↗
07/02/2014121771733Open ↗
05/22/2014140175450Open ↗
Showing 3 of 8 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Cost, Insurance & Ownership40
▸BISCOST AFFIDAVIT39
07/20/2020123170727Open ↗
07/30/2018123361030Open ↗
02/15/2018123361030Open ↗
Showing 3 of 39 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms36
▸BISEFILING COVER SHEET14
02/15/2018123361030Open ↗
11/21/2017123170727Open ↗
11/21/2017123170727Open ↗
Showing 3 of 14 on file for this type
▸BISADDITIONAL INFORMATION14
05/13/2019123170727Open ↗
11/26/2018123170727Open ↗
09/04/2018123169980Open ↗
Showing 3 of 14 on file for this type
▸BISBOROUGH INTAKE FORM4
08/14/2020123170727Open ↗
11/21/2018123170727Open ↗
07/30/2018123361030Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Other Documents7
▸DOB NOWPARTIAL DEMO: 10-DAY Notice2
08/13/2026M00936758-I1Open ↗
08/13/2026M00936758-S2Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form1
07/15/2014121992184Open ↗
▸BISLOFT BOARD CERTIFICATE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWManufacturer's Specifications1
08/13/2026M01016311-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M01016311-I1Open ↗