← Back
BuildNYC
Two stories - detached, small or mid-size
139 FISHER AVENUE
STATEN ISLAND · BIN 5088706
💬 Discuss this project
1910Year Built
2Stories
A1Building Class
R3XZoning
1,384 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · Owner of record: The Marie Racco Preservation Trust · 5,800 sf lot · 0.24 FAR built · Flood zone X
Locations of Work
Architecture
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 2Proposed alteration2 filings · 9 docs
Floor 1Proposed alteration2 filings · 9 docs
CellarProposed alteration2 filings · 9 docs
Filed — no permit issuedConstruction fence1p · 1 filing · 2 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Anselmo S. Genovese Architect310/08/2021
Building Lifecycle
10/08/2021
Filed — Alteration
INSTALL NEW BATHROOM AND LAUNDRY FIXTURES AS PART OF THE PROPOSED ADDITION
S00602536-I1
10/07/2021
Filed — Alteration
INSTALL 8'-0" HIGH TEMPORARY CONSTRUCTION FENCE
S00602750-I1
09/29/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/29/2021
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
09/29/2021
Special inspection requirement — Energy Code Compliance Inspections
27 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Nothing on file for this building.
1 project · most recent 10/08/2021
Gas Storm Water/Sanitary
FiledStatusContractorScope
10/08/2021——Gas, Storm, Water/Sanitary
1 project · most recent 04/26/2021
Wood
FiledStatusContractorScope
04/26/2021——Wood
1 project · most recent 10/07/2021
Fence
FiledStatusContractorScope
10/07/2021——Fence
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
09/29/2021Fire-Resistant Penetrations and Joints—special
09/29/2021Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
09/29/2021Energy Code Compliance Inspections—progress
09/29/2021Maintenance information—energy_progress
09/29/2021HVAC-R and service water heating system controls—energy_progress
09/29/2021HVAC-R and service water heating equipment—energy_progress
09/29/2021HVAC-R and service water piping design and insulation—energy_progress
04/13/2021Insulation placement and R values—energy_progress
04/13/2021Fenestration and door U-factor and product ratings—energy_progress
04/13/2021HVAC-R and service water piping design and insulation—energy_progress
04/13/2021Structural Stability – Alterations of existing buildings—special
04/13/2021Maintenance information—energy_progress
04/13/2021Fenestration areas—energy_progress
04/13/2021Interior lighting power—energy_progress
04/13/2021Permanent certificate—energy_progress
04/13/2021Energy Code Compliance Inspections—progress
04/13/2021Fire-Resistance Rated Construction—progress
04/13/2021Structural Wood Frame—progress
04/13/2021Final—progress
04/13/2021Footing and Foundation—progress
04/13/2021Fenestration air leakage—energy_progress
11 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account