139 LEFFERTS PLACE
BROOKLYN · BIN 3057743
💬 Discuss this project
1931Year Built
3Stories
C3Building Class
R6BZoning
1,400 sfGross Floor Area
4Units
Rent Stabilized50 Open Violations 41 unresolved · 9 paperwork only ▸FDNY Report ↗
Four families · 1,800 sf lot · 0.78 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction37p · 1 filing · 20 docs
Floor 4Under Construction35p · 1 filing · 20 docs
Floor 3Under Construction34p · 1 filing · 20 docs
Floor 2Under Construction35p · 3 filings · 20 docs
Floor 1Under Construction34p · 1 filing · 20 docs
CellarUnder Construction39p · 1 filing · 20 docs
Basement1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TRIERA CONTRACTING807/08/2026
REAL ESTATE ELEMENTS407/08/2026
BROOKLYN NORTH CAPITAL1607/08/2026
J J DESIGN NY107/03/2026
139 LEFFERTS PLACE LLC1603/22/2026
ABC CONSTRUCTION & HOME I1003/22/2026
L & C ASSOCIATES SURESH M103/22/2026
DESIGN INC J & J103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/19/2022$1.3M—— → —$911/sf building
11/21/2014$1.0M—Private party → Private party$714/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NY BUILDING ASSOCIATES INC805/18/2026
J.K.DESIGN210/10/2024
KNF SERVICES CORP107/16/2023
GERALD CALIENDO ARCHITECTS110/21/2021
ROYAL ENGINEERING, P.C111/19/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GERALD J. CALIENDO R.A., P.C.103/21/2026
RCGA ARCHITECTS203/21/2026
HILLEL LOVE103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J J DESIGN NYGeneral Contractor407/08/2026
J&J DESIGNS INCGeneral Contractor407/08/2026
MICHAEL OLIVOElectrical203/21/2026
VICTOR SUBENElectrical103/21/2026
TRIERA CONTRACTING INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616801/28/2026
Building Lifecycle
All (151)Filed (13)Permit Issued (7)Signed Off (1)Violation (60)Objection (40)Special Inspection (30)
07/06/2026
Permit issued — General Construction
B01241338-I1-GC
07/02/2026
Permit issued — Structural
B01241338-S4-ST
07/01/2026
Permit issued — Construction Fence
B01241338-S1-FN
07/01/2026
Permit issued — Support of Excavation
B01241338-S5-SE
06/17/2026
Special inspection requirement — Interior lighting power
SHAHRIAR QUAYYUM
06/17/2026
Special inspection requirement — Protection of exposed foundation insulation
SHAHRIAR QUAYYUM
06/17/2026
Special inspection requirement — Fenestration air leakage
SHAHRIAR QUAYYUM
06/17/2026
Special inspection requirement — Metering
SHAHRIAR QUAYYUM
06/17/2026
Special inspection requirement — Electrical motors and elevators
SHAHRIAR QUAYYUM
06/17/2026
Special inspection requirement — Insulation placement and R values
SHAHRIAR QUAYYUM
06/17/2026
Special inspection requirement — Air barrier — testing
SHAHRIAR QUAYYUM
06/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
06/17/2026
Special inspection requirement — Maintenance information
SHAHRIAR QUAYYUM
06/17/2026
Special inspection requirement — Exterior lighting power
SHAHRIAR QUAYYUM
06/17/2026
Special inspection requirement — Lighting controls
SHAHRIAR QUAYYUM
06/17/2026
Special inspection requirement — Air barrier - visual inspection
SHAHRIAR QUAYYUM
06/17/2026
Special inspection requirement — Fenestration areas
SHAHRIAR QUAYYUM
06/17/2026
Special inspection requirement — Lighting in dwelling units
SHAHRIAR QUAYYUM
06/17/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
SHAHRIAR QUAYYUM
06/17/2026
Special inspection requirement — Masonry
SHAHRIAR QUAYYUM
06/17/2026
Special inspection requirement — Concrete - Cast-In-Place
SHAHRIAR QUAYYUM
06/17/2026
Special inspection requirement — Subgrade Inspections
SHAHRIAR QUAYYUM
06/17/2026
Special inspection requirement — Preliminary
SHAHRIAR QUAYYUM
06/17/2026
Special inspection requirement — Energy Code Compliance Inspections
SHAHRIAR QUAYYUM
06/17/2026
Special inspection requirement — Fire-Resistance Rated Construction
SHAHRIAR QUAYYUM
06/17/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
SHAHRIAR QUAYYUM
06/04/2026
Objection resolved — Addressed
06/02/2026
Objection raised — Other
05/18/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Proposed Mechanical (HVAC, bathroom and kitchen exhaust and FAI)
B01241338-P2
05/18/2026
Special inspection requirement — Concrete - Cast-In-Place
05/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/18/2026
Special inspection requirement — Lighting in dwelling units
05/18/2026
Special inspection requirement — Masonry
05/18/2026
Special inspection requirement — Subgrade Inspections
05/18/2026
Special inspection requirement — Interior lighting power
05/18/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
05/18/2026
Special inspection requirement — Metering
01/28/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Proposed Mechanical (HVAC, bathroom and kitchen exhaust and FAI)
B01241338-S5
01/28/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Proposed Mechanical (HVAC, bathroom and kitchen exhaust and FAI)
B01241338-S6
01/28/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Proposed Mechanical (HVAC, bathroom and kitchen exhaust and FAI)
B01241338-S4
11/20/2025
Violation issued (HPD, closed)
I
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/17/2025
Objection resolved — Addressed
09/11/2025
Objection resolved — Addressed
08/26/2025
Objection resolved — Addressed
08/25/2025
Objection raised — Admin
08/21/2025
Objection raised — Admin
08/14/2025
Objection resolved — Addressed
08/14/2025
Objection resolved — Addressed
08/14/2025
Objection resolved — Addressed
08/14/2025
Objection resolved — Addressed
08/14/2025
Objection resolved — Addressed
08/14/2025
Objection resolved — Addressed
08/14/2025
Objection resolved — Addressed
08/14/2025
Objection resolved — Addressed
07/31/2025
Objection raised — Admin
07/31/2025
Objection raised — Admin
07/30/2025
Objection raised — Admin
07/30/2025
Objection raised — Zoning
07/30/2025
Objection raised — Mechanical
Latest 60 of 151 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedJ&J DESIGN NY LLC07/06/2026
DOB NOWStructuralPermit IssuedJ&J DESIGN NY LLC07/02/2026
DOB NOWConstruction FencePermit IssuedJ&J DESIGN NY LLC07/01/2026
DOB NOWSupport of ExcavationPermit IssuedJ&J DESIGN NY LLC07/01/2026
DOB NOWConstruction FencePermit IssuedJ&J DESIGNS INC10/30/2024
DOB NOWGeneral ConstructionSigned-offJ&J DESIGNS INC09/15/2023
DOB NOWSidewalk ShedPermit IssuedTRIERA CONTRACTING INC11/21/2018
BISOTISSUEDJ&J DESIGNS INC09/22/2022
BISOTISSUEDJ&J DESIGNS INC06/08/2022
BIS—ISSUEDD'AMICO CONSTRUCTION INC10/15/2021
BISOTISSUEDD'AMICO CONSTRUCTION INC10/14/2021
BISOTISSUEDMK CONTRACTING GROUP INC10/30/2020
BISEQISSUEDTRIERA CONTRACTING INC10/03/2017
BIS—ISSUEDABC CONTRUCTION & HOME IM08/17/2017
BIS—ISSUEDABC CONTRUCTION & HOME IM08/17/2017
BISEQISSUEDABC CONTRUCTION & HOME IM08/11/2017
1 project · most recent 05/18/2026
Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
05/18/2026Permit IssuedJ&J DESIGN NY LLCHeating Systems
Cooling
Cooper & Hunter CH−HYP28MSPH230VO 28,000 BTU · Heat Pump Outdoor ×4
Heating
Cooper & Hunter CH−HYP28MSPH230VO 28,000 BTU · Heat Pump Outdoor ×4
1 project · most recent 05/18/2026
Sprinkler System
FiledStatusContractorScope
05/18/2026——Sprinkler System
1 project · most recent 05/18/2026
Storm Water/Sanitary
FiledStatusContractorScope
05/18/2026——Storm, Water/Sanitary
1 project · most recent 03/18/2026
General Wiring
FiledStatusContractorScope
03/18/2026Permit IssuedRONEY ELECTRIC INCGeneral Wiring
1 project · most recent 10/10/2024
Concrete Masonry Wood
FiledStatusContractorScope
10/10/2024——Concrete, Masonry, Wood
3 projects · most recent 05/18/2026
Fence Sidewalk Shed
FiledStatusContractorScope
05/18/2026Permit IssuedJ&J DESIGN NY LLCFence
10/21/2021Permit IssuedJ&J DESIGNS INCFence
11/19/2018Permit IssuedTRIERA CONTRACTING INCSidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 86
DateRequirementInspectorRole
06/17/2026Structural Stability – Alterations of existing buildingsSHAHRIAR QUAYYUMspecial
06/17/2026Air barrier - visual inspectionSHAHRIAR QUAYYUMenergy_progress
06/17/2026Fenestration air leakageSHAHRIAR QUAYYUMenergy_progress
06/17/2026MeteringSHAHRIAR QUAYYUMenergy_progress
06/17/2026Fenestration areasSHAHRIAR QUAYYUMenergy_progress
06/17/2026Lighting controlsSHAHRIAR QUAYYUMenergy_progress
06/17/2026Interior lighting powerSHAHRIAR QUAYYUMenergy_progress
06/17/2026Electrical motors and elevatorsSHAHRIAR QUAYYUMenergy_progress
06/17/2026Insulation placement and R valuesSHAHRIAR QUAYYUMenergy_progress
06/17/2026Lighting in dwelling unitsSHAHRIAR QUAYYUMenergy_progress
06/17/2026Protection of exposed foundation insulationSHAHRIAR QUAYYUMenergy_progress
06/17/2026Air barrier — testing SHAHRIAR QUAYYUMenergy_progress
06/17/2026Maintenance informationSHAHRIAR QUAYYUMenergy_progress
06/17/2026Exterior lighting powerSHAHRIAR QUAYYUMenergy_progress
06/17/2026Fenestration and door U-factor and product ratingsSHAHRIAR QUAYYUMenergy_progress
06/17/2026Fire-Resistance Rated ConstructionSHAHRIAR QUAYYUMprogress
06/17/2026PreliminarySHAHRIAR QUAYYUMprogress
06/17/2026Energy Code Compliance InspectionsSHAHRIAR QUAYYUMprogress
06/17/2026MasonrySHAHRIAR QUAYYUMspecial
06/17/2026Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
06/17/2026Subgrade InspectionsSHAHRIAR QUAYYUMspecial
06/17/2026Concrete - Cast-In-PlaceSHAHRIAR QUAYYUMspecial
05/18/2026Electrical motors and elevators—energy_progress
05/18/2026Concrete - Cast-In-Place—special
05/18/2026Fire-Resistant Penetrations and Joints—special
Latest 25 of 86.
▾Documents — 220 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
09/02/2026B00101329-I1Request digital key ↗
08/27/2026B00895550-I1Request digital key ↗
08/23/2026B01066027-S1Request digital key ↗
Showing 3 of 13 on file for this type
▸Applications & Permits30
▸BISWORK PERMIT APPLICATION18
09/27/2022321662759Open ↗
06/21/2022321662759Open ↗
04/14/2022321662759Open ↗
Showing 3 of 18 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION11
09/19/2025340919224Open ↗
11/12/2021321186612Open ↗
12/14/2020321186612Open ↗
Showing 3 of 11 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
09/19/2025340919224Open ↗
▸Zoning, Tax Lot & Property Records14
▸DOB NOWZD1: DOB Zoning Diagram4
08/15/2026B01241338-P2Open ↗
08/13/2026B01066027-I1Open ↗
08/13/2026B01241338-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)4
08/15/2026B01241338-P2Open ↗
08/13/2026B01241338-P1Open ↗
08/13/2026B01066027-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026B01241338-I1Open ↗
08/13/2026B01241338-P1Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
06/14/2017321186612Open ↗
▸BISZONING DIAGRAM1
07/07/2017321186612Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
06/14/2017321186612Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
07/07/2017321186612Open ↗
▸Seals & Professional Certifications37
▸DOB NOWDPL-1: Design Professional Seal & Signature14
09/02/2026B00101329-I1Open ↗
08/31/2026B00615643-I1Open ↗
08/23/2026B01066027-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/02/2026B01241338-S6Open ↗
08/29/2026B01066027-I1Open ↗
08/29/2026B01066027-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
08/29/2026B01066027-I1Open ↗
08/29/2026B01066027-I1Open ↗
08/28/2026B00895550-I1Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
10/11/2017321662759Open ↗
08/17/2017321186612Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
09/19/2025340919224Open ↗
10/02/2017340550077Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
10/02/2017340550077Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
10/02/2017340550077Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
09/19/2025340919224Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING1
06/14/2017321186612Open ↗
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/14/2026B01241338-I1Open ↗
▸Safety & Tenant Protection23
▸DOB NOWHPD-3: Single Room Occupancy Multiple Dwelling (SRO MD) Anti-Harassment Checklist13
08/15/2026B01241338-P2Open ↗
08/13/2026B01241338-S4Open ↗
08/13/2026B01241338-S3Open ↗
Showing 3 of 13 on file for this type
▸BISSTREET TREE CHECKLIST2
09/19/2025340919224Open ↗
06/01/2017321186612Open ↗
▸BISBPP: STREET TREES SITE PLAN1
10/17/2025340919224Open ↗
▸BISTENANT PROTECTION PLAN AND NOTES1
10/02/2017340550077Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
09/19/2025340919224Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
08/17/2017321186612Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
08/17/2017321186612Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
09/19/2025340919224Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026B01066027-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/14/2026B01241338-I1Open ↗
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
08/23/2026B01066027-S1Open ↗
08/15/2026B01241338-P2Open ↗
08/15/2026B01066027-I1Open ↗
Showing 3 of 12 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
06/14/2017321186612Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
07/07/2017321186612Open ↗
07/07/2017321186612Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
10/11/2017321662759Open ↗
08/17/2017321186612Open ↗
▸Inspections & Test Reports10
▸BISTECHNICAL REPORT: RESPONSIBILITY4
08/04/2017321186612Open ↗
07/07/2017321186612Open ↗
06/14/2017321186612Open ↗
Showing 3 of 4 on file for this type
▸BISDEP Hydrant Flow Test Letter1
07/07/2017321186612Open ↗
▸BISSOIL REPORT1
06/14/2017321186612Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
06/14/2017321186612Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
07/07/2017321186612Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B01066027-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026B01066027-I1Open ↗
▸Approvals, Objections & Sign-offs13
▸BISSUPERSEDING LETTER9
04/14/2022321662759Open ↗
10/18/2021321186612Open ↗
10/18/2021321186612Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE2
06/21/2017321186612Open ↗
06/14/2017321186612Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
08/17/2017321186612Open ↗
06/01/2017321186612Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT3
10/16/2017321563884Open ↗
10/11/2017321662759Open ↗
07/07/2017321186612Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE2
10/18/2021321186612Open ↗
08/17/2017321186612Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
08/17/2017321186612Open ↗
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE1
09/23/2021321186612Open ↗
▸Filing & Intake Forms33
▸BISADDITIONAL INFORMATION13
02/02/2026340919224Open ↗
02/02/2026340919224Open ↗
10/17/2025340919224Open ↗
Showing 3 of 13 on file for this type
▸BISBOROUGH INTAKE FORM11
09/27/2022321662759Open ↗
04/14/2022321662759Open ↗
10/18/2021321186612Open ↗
Showing 3 of 11 on file for this type
▸BISEFILING COVER SHEET6
10/16/2017321563884Open ↗
10/06/2017321662759Open ↗
06/22/2017321575782Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
09/19/2025340919224Open ↗
10/02/2017340550077Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
09/19/2025340919224Open ↗
▸Other Documents21
▸DOB NOWSite Survey: Initial4
08/15/2026B01241338-P2Open ↗
08/13/2026B01241338-I1Open ↗
08/13/2026B01066027-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/15/2026B01241338-P2Open ↗
08/13/2026B01066027-I1Open ↗
08/13/2026B01241338-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/15/2026B01241338-P2Open ↗
08/15/2026B01066027-I1Open ↗
08/13/2026B01241338-I1Open ↗
Showing 3 of 4 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
02/02/2026340919224Open ↗
06/14/2017321186612Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
10/17/2025340919224Open ↗
▸BISPLOT DIAGRAM1
06/14/2017321186612Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
02/02/2026340919224Open ↗
▸DOB NOWPlot Diagram1
08/13/2026B01066027-I1Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026B00895550-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/17/2026B01241338-S5Open ↗
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
09/02/2026B00101329-I1Open ↗