← Back
Walk-up apt, over six families with stores
Highbridge Rising
1391 EDWARD L GRANT HWY · BIN 2003347
💬 Discuss this project
1925Year Built
5Stories
C7Building Class
R8AZoning
26,244 sfGross Floor Area
25Units
LL97 CoveredRent Stabilized20 Open Violations 19 unresolved · 1 paperwork only ▸
Walk-up apt, over six families with stores · 6,615 sf lot · 3.97 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionLandscapeGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction59p · 1 filing · 20 docs
Floor 5Under Construction52p · 1 filing · 20 docs
Floor 4Under Construction53p · 1 filing · 20 docs
Floor 3Under Construction49p · 1 filing · 20 docs
Floor 2Under Construction49p · 1 filing · 20 docs
Floor 1Under Construction67p · 5 filings · 20 docs
CellarUnder Construction59p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HIGHBRIDGE COMMUNITY DEV. CORP3009/26/2026
ESSEN HEALTH CARE103/21/2026
HIGHBRIDGE COMMUNITY HDFC203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PAUL A. CASTRUCCI, ARCHITECT202/23/2026
JOEL PHAGOO P.E. PLLC111/06/2025
FLORINELA MURESAN409/19/2025
GACE DPC307/24/2025
ASDA ARCHITECTURE + DESIGN211/03/2023
VILAS PARAB306/09/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JULIAN ALBERTO GOMEZ303/21/2026
MP DESIGN AND CONSTRUCTION203/21/2026
WILLIAM VITACCO ASSOCIATES803/21/2026
A1 EXPEDITING SERVICE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HILLVIEW CONSTR AND RENOVGeneral Contractor603/21/2026
NOTIAS CONSTRUCTION INCGeneral Contractor404/09/2026
AKM CONSTRUCTION NY CORPGeneral Contractor309/26/2026
KDL CONSTRUCTION & DEVELOGeneral Contractor303/21/2026
DUAL FUEL PLUBING & HTINGPlumbing207/08/2026
UNITED ONE MECHANICAL INCPlumbing107/08/2026
AQUEDUCT MECHANICAL CORPPlumbing107/08/2026
ALEXANDER EUGENEElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CONCRETE SOLUTIONS LAB CO5344802/23/2026
VIBRANALYSIS INC., DBA VT6864111/16/2022
PARAB ASSOCIATES2876306/09/2022
Building Lifecycle
All (164)Filed (16)Permit Issued (15)Signed Off (1)Violation (56)Inspection (4)Objection (42)Special Inspection (30)
09/25/2026
Permit issued — Sidewalk Shed
X01308476-I1-SH
08/21/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
07/22/2026
Violation issued (HPD, closed)
B
07/22/2026
Violation issued (HPD, open)
A
07/15/2026
Violation issued (ECB, open)
Unknown
07/04/2026
Violation issued (HPD, open)
C
07/03/2026
Violation issued (HPD, closed)
C
07/03/2026
Violation issued (HPD, closed)
B
07/03/2026
Violation issued (HPD, closed)
B
07/03/2026
Violation issued (HPD, open)
C
07/03/2026
Violation issued (HPD, closed)
C
05/21/2026
Permit issued — Boiler Equipment
X01208092-S6-BE
05/20/2026
Permit issued — Boiler Equipment
X01208092-S4-BE
05/13/2026
Permit issued — Suspended Scaffold
X01390878-I1-SC
05/08/2026
Special inspection requirement — Post-installed anchors in masonry
MD MOSTAFA
04/27/2026
Filed — Alteration
X01390878-I1
04/23/2026
Permit issued — Plumbing
X01208092-S2-PL
04/08/2026
Permit issued — Sidewalk Shed
X01308476-I1-SH
02/23/2026
Filed — Alteration
MODERATE RENOVATION OF EXISTING RESIDENTIAL BUILDING. INTERIOR RENOVATION WITH LIMITED EXTERIOR WORK AS NOTED.
X01208092-P2
02/23/2026
Special inspection requirement — Fire-Resistance Rated Construction
MINA HANNA
02/23/2026
Special inspection requirement — Tenant Protection Plan Compliance
MINA HANNA
02/23/2026
Special inspection requirement — Air barrier - visual inspection
MINA HANNA
02/23/2026
Special inspection requirement — Lighting in dwelling units
MINA HANNA
02/23/2026
Special inspection requirement — Interior lighting power
MINA HANNA
02/23/2026
Special inspection requirement — Fenestration air leakage
MINA HANNA
02/23/2026
Special inspection requirement — Final
MINA HANNA
02/23/2026
Special inspection requirement — Exterior lighting power
MINA HANNA
02/23/2026
Special inspection requirement — Fenestration areas
MINA HANNA
02/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MINA HANNA
02/23/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
MINA HANNA
02/23/2026
Special inspection requirement — Lighting controls
MINA HANNA
02/23/2026
Special inspection requirement — Energy Code Compliance Inspections
MINA HANNA
02/20/2026
Special inspection requirement — Exterior lighting power
MINA HANNA
02/20/2026
Special inspection requirement — Lighting in dwelling units
MINA HANNA
02/20/2026
Special inspection requirement — Interior lighting power
MINA HANNA
02/20/2026
Special inspection requirement — Lighting controls
MINA HANNA
02/09/2026
Permit issued — General Construction
X01208092-I1-GC
02/06/2026
Permit issued — General Construction
X01208092-S5-GC
02/06/2026
Permit issued — Structural
X01208092-S1-ST
02/06/2026
Permit issued — Mechanical Systems
X01208092-S3-MS
01/06/2026
Violation issued (HPD, open)
B
01/06/2026
Violation issued (HPD, closed)
C
01/06/2026
Violation issued (HPD, closed)
C
01/06/2026
Violation issued (HPD, open)
B
01/06/2026
Violation issued (HPD, open)
B
12/15/2025
Special inspection requirement — Tenant Protection Plan Compliance
12/02/2025
Special inspection requirement — Air barrier - visual inspection
MINA HANNA
12/02/2025
Special inspection requirement — Fire-Resistance Rated Construction
MINA HANNA
12/02/2025
Special inspection requirement — Final
MINA HANNA
12/02/2025
Special inspection requirement — Energy Code Compliance Inspections
MINA HANNA
12/02/2025
Special inspection requirement — Fenestration air leakage
MINA HANNA
12/02/2025
Special inspection requirement — Fenestration areas
MINA HANNA
12/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MINA HANNA
12/02/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
MINA HANNA
11/10/2025
Permit issued — Sidewalk Shed
X01308476-I1-SH
11/06/2025
Filed — Alteration
X01308476-I1
09/19/2025
Filed — Alteration
MODERATE RENOVATION OF EXISTING RESIDENTIAL BUILDING. INTERIOR RENOVATION WITH LIMITED EXTERIOR WORK AS NOTED.
X01208092-S6
09/18/2025
Filed — Alteration
MODERATE RENOVATION OF EXISTING RESIDENTIAL BUILDING. INTERIOR RENOVATION WITH LIMITED EXTERIOR WORK AS NOTED.
X01208092-S4
07/24/2025
Filed — Alteration
MODERATE RENOVATION OF EXISTING RESIDENTIAL BUILDING. INTERIOR RENOVATION WITH LIMITED EXTERIOR WORK AS NOTED.
X01208092-S5
07/24/2025
Filed — Alteration
MODERATE RENOVATION OF EXISTING RESIDENTIAL BUILDING. INTERIOR RENOVATION WITH LIMITED EXTERIOR WORK AS NOTED.
X01208092-S1
Latest 60 of 164 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedAKM CONSTRUCTION NY CORP09/25/2026
DOB NOWBoiler EquipmentPermit IssuedDUAL FUEL PLUBING & HTING05/21/2026
DOB NOWBoiler EquipmentPermit IssuedDUAL FUEL PLUBING & HTING05/20/2026
DOB NOWSuspended ScaffoldPermit IssuedPREET & B CONSTRUCTION CO05/13/2026
DOB NOWPlumbingPermit IssuedUNITED ONE MECHANICAL INC04/23/2026
DOB NOWSidewalk ShedPermit IssuedAKM CONSTRUCTION NY04/08/2026
DOB NOWGeneral ConstructionPermit IssuedNOTIAS CONSTRUCTION INC02/09/2026
DOB NOWGeneral ConstructionPermit IssuedNOTIAS CONSTRUCTION INC02/06/2026
DOB NOWStructuralPermit IssuedNOTIAS CONSTRUCTION INC02/06/2026
DOB NOWMechanical SystemsPermit IssuedNOTIAS CONSTRUCTION INC02/06/2026
DOB NOWSidewalk ShedPermit IssuedAKM CONSTRUCTION NY11/10/2025
DOB NOWStructuralSigned-offHILLVIEW CONSTR AND RENOV01/09/2023
DOB NOWStructuralSigned-offHILLVIEW CONSTR AND RENOV12/27/2022
DOB NOWPlumbingSigned-offAQUEDUCT MECHANICAL CORP06/13/2022
DOB NOWGeneral ConstructionPermit IssuedKDL CONSTRUCTION & DEVELO05/24/2022
1 project · most recent 02/23/2026
Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
02/23/2026Permit IssuedNOTIAS CONSTRUCTION INCHeating Systems, Ventilation Systems
Heating
Ventilation
2 projects · most recent 02/23/2026
FiledStatusContractorScope
02/23/2026——5 heads
06/09/2022——22 heads
2 projects · most recent 02/23/2026
Water/Sanitary Gas Plumbing-Sprinkler Storm
FiledStatusContractorScope
02/23/2026Permit IssuedDUAL FUEL PLUBING & HTINGGas, Plumbing-Sprinkler, Storm, Water/Sanitary
11/21/2021Signed-offAQUEDUCT MECHANICAL CORPWater/Sanitary
4 projects · most recent 05/20/2026
General Wiring
FiledStatusContractorScope
05/20/2026CompleteQUEUE ELEC'L CONTRS, INCGeneral Wiring
05/07/2026Permit IssuedABILENE ELECTRIC INC—
10/28/2025Permit IssuedHIGH QUALITY ELEC.OF NYC—
07/27/2022CompleteHEXAGON CONST & ELECL GRPGeneral Wiring
1 project · most recent 02/23/2026
Steel
FiledStatusContractorScope
02/23/2026Permit IssuedDUAL FUEL PLUBING & HTINGSteel
1 project · most recent 02/23/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
02/23/2026Permit IssuedDUAL FUEL PLUBING & HTINGTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
08/21/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
07/26/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/25/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/23/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 73
DateRequirementInspectorRole
05/08/2026Post-installed anchors in masonryMD MOSTAFAspecial
02/23/2026Air barrier - visual inspectionMINA HANNAenergy_progress
02/23/2026Lighting controlsMINA HANNAenergy_progress
02/23/2026Fenestration and door U-factor and product ratingsMINA HANNAenergy_progress
02/23/2026Lighting in dwelling unitsMINA HANNAenergy_progress
02/23/2026Tenant Protection Plan ComplianceMINA HANNAspecial
02/23/2026Fire-Resistant Penetrations and JointsMINA HANNAspecial
02/23/2026Fire-Resistance Rated ConstructionMINA HANNAprogress
02/23/2026Energy Code Compliance InspectionsMINA HANNAprogress
02/23/2026FinalMINA HANNAprogress
02/23/2026Interior lighting powerMINA HANNAenergy_progress
02/23/2026Exterior lighting powerMINA HANNAenergy_progress
02/23/2026Fenestration air leakageMINA HANNAenergy_progress
02/23/2026Fenestration areasMINA HANNAenergy_progress
02/20/2026Interior lighting powerMINA HANNAenergy_progress
02/20/2026Exterior lighting powerMINA HANNAenergy_progress
02/20/2026Lighting in dwelling unitsMINA HANNAenergy_progress
02/20/2026Lighting controlsMINA HANNAenergy_progress
12/15/2025Tenant Protection Plan Compliance—special
12/02/2025Air barrier - visual inspectionMINA HANNAenergy_progress
12/02/2025Fenestration air leakageMINA HANNAenergy_progress
12/02/2025Fire-Resistant Penetrations and JointsMINA HANNAspecial
12/02/2025Energy Code Compliance InspectionsMINA HANNAprogress
12/02/2025FinalMINA HANNAprogress
12/02/2025Fenestration and door U-factor and product ratingsMINA HANNAenergy_progress
Latest 25 of 73.
▾Documents — 91 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch16
08/25/2026X00613510-I1Request digital key ↗
08/23/2026X08014228-I1Request digital key ↗
08/23/2026X08021758-I1Request digital key ↗
Showing 3 of 16 on file for this type
▸Seals & Professional Certifications52
▸DOB NOWProgress Inspector Seal & Signature19
09/23/2026X08021758-I1Open ↗
09/23/2026X01208092-S3Open ↗
09/23/2026X01208092-S3Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature18
09/23/2026X01208092-S3Open ↗
09/23/2026X08021758-I1Open ↗
09/23/2026X08021758-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature15
08/25/2026X00613510-I1Open ↗
08/25/2026X00630840-I1Open ↗
08/22/2026X00955013-I1Open ↗
Showing 3 of 15 on file for this type
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form7
08/18/2026X01208092-S6Open ↗
08/18/2026X01208092-S4Open ↗
08/18/2026X01208092-S2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/25/2026X00613510-I1Open ↗
08/15/2026X00630840-I1Open ↗
08/13/2026X00665251-I1Open ↗
▸Approvals, Objections & Sign-offs9
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter9
08/18/2026X01208092-S2Open ↗
08/18/2026X01208092-I1Open ↗
08/13/2026X01208092-S4Open ↗
Showing 3 of 9 on file for this type
▸Other Documents4
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/18/2026X01208092-I1Open ↗
08/13/2026X01208092-P2Open ↗
▸DOB NOWManufacturer's Specifications1
08/16/2026X01390878-I1Open ↗
▸DOB NOWCalculations1
08/16/2026X01390878-I1Open ↗