← Back
BuildNYC
Walk-up apt, over six families with stores
Highbridge Rising
1391 NELSON AVENUE · BIN 2003347
💬 Discuss this project
1925Year Built
5Stories
C7Building Class
R8AZoning
26,244 sfGross Floor Area
25Units
LL97 CoveredRent Stabilized20 Active Violations 18 unresolved · 2 paperwork only ▸
Walk-up apt, over six families with stores · 6,615 sf lot · 3.97 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingLandscapeGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofHighbridge Community Dev. CorpUnder Construction62p · 1 filing · 20 docs
Floor 5Highbridge Community Dev. CorpUnder Construction53p · 1 filing · 20 docs
Floor 4Highbridge Community Dev. CorpUnder Construction54p · 1 filing · 20 docs
Floor 3Highbridge Community Dev. CorpUnder Construction50p · 1 filing · 20 docs
Floor 2Highbridge Community Dev. CorpUnder Construction50p · 1 filing · 20 docs
Floor 1Essen Medical CenterUnder Construction69p · 5 filings · 20 docs
CellarHighbridge Community Dev. CorpUnder Construction60p · 1 filing · 20 docs
Site & exteriorHighbridge Community Dev. CorpUnder Construction41p · 3 filings · 20 docs
Filed — no permit issuedProposed Awning3p · 2 filings · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Highbridge Community Development3309/26/2026
Essen Healthcare103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Paul A. Castrucci, Architect202/23/2026
Joel Phagoo P.E111/06/2025
Florinela Muresan409/19/2025
Gace307/24/2025
Asda Architecture + Design211/03/2023
Vilas Parab306/09/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Julian Alberto Gomez303/21/2026
MP Design and Construction203/21/2026
William Vitacco Associates803/21/2026
A1 Expediting Service203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Hillview Construction and RenovationGeneral Contractor603/21/2026
Notias ConstructionGeneral Contractor404/09/2026
KDL Construction & DevelopmentGeneral Contractor303/21/2026
Akm Construction NYScaffold309/26/2026
Dual Fuel Plumbing & HeatingPlumbing207/08/2026
United One MechanicalPlumbing107/08/2026
Aqueduct MechanicalPlumbing107/08/2026
High Quality Electric ofElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Concrete Solutions Lab Co5344802/23/2026
Vibranalysis Inc., Dba VT6864111/16/2022
Parab Associates2876306/09/2022
Building Lifecycle
All (164)Filed (16)Permit Issued (15)Signed Off (1)Violation (56)Inspection (4)Objection (42)Special Inspection (30)
09/25/2026
Permit issued — Sidewalk Shed
X01308476-I1-SH
08/21/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
07/22/2026
Violation issued (HPD, closed)
B
07/22/2026
Violation issued (HPD, open)
A
07/15/2026
Violation issued (ECB, open)
Unknown
07/04/2026
Violation issued (HPD, open)
C
07/03/2026
Violation issued (HPD, open)
C
07/03/2026
Violation issued (HPD, closed)
B
07/03/2026
Violation issued (HPD, closed)
C
07/03/2026
Violation issued (HPD, closed)
C
07/03/2026
Violation issued (HPD, closed)
B
05/21/2026
Permit issued — Boiler Equipment
X01208092-S6-BE
05/20/2026
Permit issued — Boiler Equipment
X01208092-S4-BE
05/13/2026
Permit issued — Suspended Scaffold
X01390878-I1-SC
05/08/2026
Special inspection requirement — Post-installed anchors in masonry
MD MOSTAFA
04/27/2026
Filed — Alteration
X01390878-I1
04/23/2026
Permit issued — Plumbing
X01208092-S2-PL
04/08/2026
Permit issued — Sidewalk Shed
X01308476-I1-SH
02/23/2026
Filed — Alteration
MODERATE RENOVATION OF EXISTING RESIDENTIAL BUILDING. INTERIOR RENOVATION WITH LIMITED EXTERIOR WORK AS NOTED.
X01208092-P2
02/23/2026
Special inspection requirement — Fire-Resistance Rated Construction
MINA HANNA
02/23/2026
Special inspection requirement — Energy Code Compliance Inspections
MINA HANNA
02/23/2026
Special inspection requirement — Tenant Protection Plan Compliance
MINA HANNA
02/23/2026
Special inspection requirement — Air barrier - visual inspection
MINA HANNA
02/23/2026
Special inspection requirement — Exterior lighting power
MINA HANNA
02/23/2026
Special inspection requirement — Lighting in dwelling units
MINA HANNA
02/23/2026
Special inspection requirement — Interior lighting power
MINA HANNA
02/23/2026
Special inspection requirement — Final
MINA HANNA
02/23/2026
Special inspection requirement — Fenestration areas
MINA HANNA
02/23/2026
Special inspection requirement — Fenestration air leakage
MINA HANNA
02/23/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
MINA HANNA
02/23/2026
Special inspection requirement — Lighting controls
MINA HANNA
02/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MINA HANNA
02/20/2026
Special inspection requirement — Lighting in dwelling units
MINA HANNA
02/20/2026
Special inspection requirement — Interior lighting power
MINA HANNA
02/20/2026
Special inspection requirement — Lighting controls
MINA HANNA
02/20/2026
Special inspection requirement — Exterior lighting power
MINA HANNA
02/09/2026
Permit issued — General Construction
X01208092-I1-GC
02/06/2026
Permit issued — Structural
X01208092-S1-ST
02/06/2026
Permit issued — Mechanical Systems
X01208092-S3-MS
02/06/2026
Permit issued — General Construction
X01208092-S5-GC
01/06/2026
Violation issued (HPD, closed)
C
01/06/2026
Violation issued (HPD, closed)
C
01/06/2026
Violation issued (HPD, open)
B
01/06/2026
Violation issued (HPD, open)
B
01/06/2026
Violation issued (HPD, open)
B
12/15/2025
Special inspection requirement — Tenant Protection Plan Compliance
12/02/2025
Special inspection requirement — Air barrier - visual inspection
MINA HANNA
12/02/2025
Special inspection requirement — Fire-Resistance Rated Construction
MINA HANNA
12/02/2025
Special inspection requirement — Final
MINA HANNA
12/02/2025
Special inspection requirement — Energy Code Compliance Inspections
MINA HANNA
12/02/2025
Special inspection requirement — Fenestration air leakage
MINA HANNA
12/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MINA HANNA
12/02/2025
Special inspection requirement — Fenestration areas
MINA HANNA
12/02/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
MINA HANNA
11/10/2025
Permit issued — Sidewalk Shed
X01308476-I1-SH
11/06/2025
Filed — Alteration
X01308476-I1
09/19/2025
Filed — Alteration
MODERATE RENOVATION OF EXISTING RESIDENTIAL BUILDING. INTERIOR RENOVATION WITH LIMITED EXTERIOR WORK AS NOTED.
X01208092-S6
09/18/2025
Filed — Alteration
MODERATE RENOVATION OF EXISTING RESIDENTIAL BUILDING. INTERIOR RENOVATION WITH LIMITED EXTERIOR WORK AS NOTED.
X01208092-S4
07/24/2025
Filed — Alteration
MODERATE RENOVATION OF EXISTING RESIDENTIAL BUILDING. INTERIOR RENOVATION WITH LIMITED EXTERIOR WORK AS NOTED.
X01208092-S1
07/24/2025
Filed — Alteration
MODERATE RENOVATION OF EXISTING RESIDENTIAL BUILDING. INTERIOR RENOVATION WITH LIMITED EXTERIOR WORK AS NOTED.
X01208092-S5
Latest 60 of 164 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedAkm Construction NY09/25/2026
DOB NOWBoiler EquipmentPermit IssuedDual Fuel Plumbing & Heating05/21/2026
DOB NOWBoiler EquipmentPermit IssuedDual Fuel Plumbing & Heating05/20/2026
DOB NOWSuspended ScaffoldPermit IssuedPreet & B Construction Co05/13/2026
DOB NOWPlumbingPermit IssuedUnited One Mechanical04/23/2026
DOB NOWSidewalk ShedPermit IssuedAkm Construction NY04/08/2026
DOB NOWGeneral ConstructionPermit IssuedNotias Construction02/09/2026
DOB NOWStructuralPermit IssuedNotias Construction02/06/2026
DOB NOWMechanical SystemsPermit IssuedNotias Construction02/06/2026
DOB NOWGeneral ConstructionPermit IssuedNotias Construction02/06/2026
DOB NOWSidewalk ShedPermit IssuedAkm Construction NY11/10/2025
DOB NOWStructuralSigned-offHillview Construction and Renovation01/09/2023
DOB NOWStructuralSigned-offHillview Construction and Renovation12/27/2022
DOB NOWPlumbingSigned-offAqueduct Mechanical06/13/2022
DOB NOWGeneral ConstructionPermit IssuedKDL Construction & Development05/24/2022
1 project · most recent 02/23/2026
Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
02/23/2026Permit IssuedNotias ConstructionHeating Systems, Ventilation Systems
Heating
Ventilation
2 projects · most recent 02/23/2026
FiledStatusContractorScope
02/23/2026——5 heads
06/09/2022——22 heads
2 projects · most recent 02/23/2026
Water/Sanitary Gas Plumbing-Sprinkler Storm
FiledStatusContractorScope
02/23/2026Permit IssuedDual Fuel Plumbing & HeatingGas, Plumbing-Sprinkler, Storm, Water/Sanitary
11/21/2021Signed-offAqueduct MechanicalWater/Sanitary
4 projects · most recent 05/20/2026
General Wiring
FiledStatusContractorScope
05/20/2026CompleteQueue Electrical ContractorsGeneral Wiring
05/07/2026Permit IssuedAbilene Electric—
10/28/2025Permit IssuedHigh Quality Electric of NYC—
07/27/2022CompleteHexagon Construction & Electrical GroupGeneral Wiring
1 project · most recent 02/23/2026
Steel
FiledStatusContractorScope
02/23/2026Permit IssuedDual Fuel Plumbing & HeatingSteel
1 project · most recent 02/23/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
02/23/2026Permit IssuedDual Fuel Plumbing & HeatingTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
08/21/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
07/26/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/25/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/23/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 74
DateRequirementInspectorRole
05/08/2026Post-installed anchors in masonryMD MOSTAFAspecial
02/23/2026Interior lighting powerMINA HANNAenergy_progress
02/23/2026Energy Code Compliance InspectionsMINA HANNAprogress
02/23/2026Fire-Resistance Rated ConstructionMINA HANNAprogress
02/23/2026Fire-Resistant Penetrations and JointsMINA HANNAspecial
02/23/2026Tenant Protection Plan ComplianceMINA HANNAspecial
02/23/2026FinalMINA HANNAprogress
02/23/2026Fenestration and door U-factor and product ratingsMINA HANNAenergy_progress
02/23/2026Lighting in dwelling unitsMINA HANNAenergy_progress
02/23/2026Fenestration areasMINA HANNAenergy_progress
02/23/2026Fenestration air leakageMINA HANNAenergy_progress
02/23/2026Exterior lighting powerMINA HANNAenergy_progress
02/23/2026Air barrier - visual inspectionMINA HANNAenergy_progress
02/23/2026Lighting controlsMINA HANNAenergy_progress
02/20/2026Lighting in dwelling unitsMINA HANNAenergy_progress
02/20/2026Exterior lighting powerMINA HANNAenergy_progress
02/20/2026Interior lighting powerMINA HANNAenergy_progress
02/20/2026Lighting controlsMINA HANNAenergy_progress
12/15/2025Tenant Protection Plan Compliance—special
12/02/2025Fenestration areasMINA HANNAenergy_progress
12/02/2025Fire-Resistant Penetrations and JointsMINA HANNAspecial
12/02/2025Energy Code Compliance InspectionsMINA HANNAprogress
12/02/2025FinalMINA HANNAprogress
12/02/2025Fire-Resistance Rated ConstructionMINA HANNAprogress
12/02/2025Air barrier - visual inspectionMINA HANNAenergy_progress
Latest 25 of 74.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Essen Medical CenterMedical / HealthcareFloor 1
Project X00665251 Alteration · Approved · 06/09/2022
Project X00630840 Alteration · Permit Entire · 11/21/2021
Project X00613510 Alteration · Permit Entire · 11/13/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 92 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch16
08/25/2026X00613510-I1Request digital key ↗
08/23/2026X08014228-I1Request digital key ↗
08/23/2026X08021758-I1Request digital key ↗
Showing 3 of 16 on file for this type
▸Seals & Professional Certifications53
▸DOB NOWProgress Inspector Seal & Signature20
10/05/2026X08014228-I1Open ↗
09/23/2026X01208092-S3Open ↗
09/23/2026X08021758-I1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature18
09/23/2026X08021758-I1Open ↗
09/23/2026X08021758-I1Open ↗
09/23/2026X08021758-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature15
08/25/2026X00613510-I1Open ↗
08/25/2026X00630840-I1Open ↗
08/22/2026X00955013-I1Open ↗
Showing 3 of 15 on file for this type
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form7
08/18/2026X01208092-S6Open ↗
08/18/2026X01208092-S4Open ↗
08/18/2026X01208092-S2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/25/2026X00613510-I1Open ↗
08/15/2026X00630840-I1Open ↗
08/13/2026X00665251-I1Open ↗
▸Approvals, Objections & Sign-offs9
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter9
08/18/2026X01208092-S2Open ↗
08/18/2026X01208092-I1Open ↗
08/13/2026X01208092-S3Open ↗
Showing 3 of 9 on file for this type
▸Other Documents4
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/18/2026X01208092-I1Open ↗
08/13/2026X01208092-P2Open ↗
▸DOB NOWManufacturer's Specifications1
08/16/2026X01390878-I1Open ↗
▸DOB NOWCalculations1
08/16/2026X01390878-I1Open ↗