Two family frame
14-10 119 STREET
QUEENS · College Point · BIN 4619380
💬 Discuss this project
2022Year Built
2.5Stories
B2Building Class
R4AZoning
3,750 sfGross Floor Area
2Units
Two family frame · 4,000 sf lot · 0.94 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingFire ProtectionCivilGeneral
Floor 213p · 1 filing · 13 docs
Floor 114p · 2 filings · 15 docs
Cellar15p · 1 filing · 13 docs
Site & exterior14p · 2 filings · 15 docs
Filed — no permit issued7p · 2 filings · 4 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/12/2018$780K—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MEHDI GHAZI, P.E., P.C.503/03/2023
GERALD CALIENDO ARCHITECTS201/09/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
IBUILD CONSULTING1003/21/2026
GERALD J. CALIENDO R.A., P.C.403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
L&L CONSTRUCTION DEVELOPGeneral Contractor607/08/2026
TRI STATE PLBG & HTG INCPlumbing207/08/2026
FIVE BOROUGH NYC LLCFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MEHDI GHAZI, P.E. P.C.7129403/03/2023
Building Lifecycle
All (47)Filed (7)Permit Issued (7)Signed Off (3)Inspection (8)Objection (6)Special Inspection (16)
06/06/2023
Signed off — Alteration
PROPOSED A NEW 10'-0" CURB CUT WORK FILED IN CONJUNCTION WITH NB #421918875
Q00214041-I1
06/05/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
05/30/2023
Signed off — Alteration
INSTALLATION OF PLUMBING AND SPRINKLER WORK AS PER PLAN FILED HEREWITH IN CONJUNCTION WITH NB #421918875 & Q00573802. NO CHANGE IN USE, OCCUPANCY, OR EGRESS OF BUILDING.
Q00567256-I1
03/30/2023
Signed off — Alteration
Q00549505-I1
03/30/2023
Permit issued — Curb Cut
Q00214041-I1-CC
03/07/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
MEHDI GHAZI
03/07/2023
Special inspection requirement — Sprinkler Systems
MEHDI GHAZI
03/07/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
MEHDI GHAZI
03/07/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MEHDI GHAZI
03/07/2023
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
MEHDI GHAZI
03/07/2023
Special inspection requirement — Energy Code Compliance Inspections
MEHDI GHAZI
03/07/2023
Special inspection requirement — HVAC-R and service water heating system controls
MEHDI GHAZI
03/07/2023
Special inspection requirement — HVAC-R and service water heating equipment
MEHDI GHAZI
03/03/2023
Filed — Alteration
INSTALLATION OF PLUMBING AND SPRINKLER WORK AS PER PLAN FILED HEREWITH IN CONJUNCTION WITH NB #421918875 & Q00573802. NO CHANGE IN USE, OCCUPANCY, OR EGRESS OF BUILDING.
Q00567256-P4
02/10/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/09/2023
Permit issued — Plumbing
Q00567256-I1-PL
02/07/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/20/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/20/2022
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
05/20/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
05/20/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/20/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/13/2022
Filed — Alteration
INSTALLATION OF PLUMBING AND SPRINKLER WORK AS PER PLAN FILED HEREWITH IN CONJUNCTION WITH NB #421918875 & Q00573802. NO CHANGE IN USE, OCCUPANCY, OR EGRESS OF BUILDING.
Q00567256-P1
05/10/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
MEHDI GHAZI
05/10/2022
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
MEHDI GHAZI
05/10/2022
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
MEHDI GHAZI
05/10/2022
Special inspection requirement — Sprinkler Systems
MEHDI GHAZI
05/10/2022
Special inspection requirement — Energy Code Compliance Inspections
MEHDI GHAZI
05/10/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
MEHDI GHAZI
05/10/2022
Special inspection requirement — HVAC-R and service water heating equipment
MEHDI GHAZI
05/10/2022
Special inspection requirement — HVAC-R and service water heating system controls
MEHDI GHAZI
04/19/2022
Permit issued — Construction Fence
Q00549505-I1-FN
03/09/2022
Permit issued — Plumbing
Q00567256-I1-EW-SP
01/25/2022
Permit issued — Construction Fence
Q00549505-I1-FN
01/10/2022
Permit issued — Sprinklers
Q00567256-I1-PL
09/01/2021
Filed — Alteration
INSTALLATION OF PLUMBING AND SPRINKLER WORK AS PER PLAN FILED HEREWITH IN CONJUNCTION WITH NB #421918875 & Q00573802. NO CHANGE IN USE, OCCUPANCY, OR EGRESS OF BUILDING.
Q00567256-I1
07/25/2021
Permit issued — Construction Fence
Q00549505-I1-FN
06/30/2021
Filed — Alteration
Q00549505-I1
06/09/2020
Filed — Alteration
Q00351985-I1
01/09/2020
Filed — Alteration
FILED HEREWITH PLANS AND APPLICATION FOR A NEW TEMPORARY PLYWOOD CONSTRUCTION FENCE FILED IN CONJUNCTION WITH NB#421918875.
Q00260406-I1
09/12/2019
Objection raised — Structural
09/12/2019
Objection resolved — Addressed
09/12/2019
Objection raised — Zoning
09/12/2019
Objection resolved — Addressed
09/12/2019
Objection raised — Scope
09/12/2019
Objection resolved — Addressed
09/10/2019
Filed — Alteration
PROPOSED A NEW 10'-0" CURB CUT WORK FILED IN CONJUNCTION WITH NB #421918875
Q00214041-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offL&L CONSTRUCTION DEVELOP03/30/2023
DOB NOWPlumbingSigned-offDW PLUMBING INC02/09/2023
DOB NOWConstruction FenceSigned-offL&L CONSTRUCTION DEVELOP04/19/2022
DOB NOWPlumbingSigned-offFIVE BOROUGH NYC LLC03/09/2022
DOB NOWConstruction FenceSigned-offL&L CONSTRUCTION DEVELOP01/25/2022
DOB NOWSprinklersSigned-offDW PLUMBING INC01/10/2022
DOB NOWConstruction FenceSigned-offL&L CONSTRUCTION DEVELOP07/25/2021
BIS—ISSUEDL&L CONSTRUCTION DEVELOP03/30/2023
BIS—ISSUEDL&L CONSTRUCTION DEVELOP04/18/2022
BIS—ISSUEDL&L CONSTRUCTION DEVELOP01/24/2022
BIS—ISSUEDL&L CONSTRUCTION DEVELOP10/05/2021
BISOTISSUEDL&L CONSTRUCTION DEVELOP08/19/2021
3 projects · most recent 03/16/2023
General Wiring
FiledStatusContractorScope
03/16/2023CompleteKJK ELECTRIC INCGeneral Wiring
02/21/2023CompleteKJK ELECTRIC INC1 meters, 1 new_meters
02/01/2019CompleteUSA ELECT'L SERVICES CORP1 meters, 1 new_meters
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
06/05/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
02/10/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/07/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/20/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/20/2022Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
05/20/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/20/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/20/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
03/07/2023HVAC-R and service water piping design and insulationMEHDI GHAZIenergy_progress
03/07/2023Sprinkler SystemsMEHDI GHAZIspecial
03/07/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationMEHDI GHAZIspecial
03/07/2023Fire-Resistant Penetrations and JointsMEHDI GHAZIspecial
03/07/2023Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesMEHDI GHAZIspecial
03/07/2023Energy Code Compliance InspectionsMEHDI GHAZIprogress
03/07/2023HVAC-R and service water heating system controlsMEHDI GHAZIenergy_progress
03/07/2023HVAC-R and service water heating equipmentMEHDI GHAZIenergy_progress
05/10/2022Fire-Resistant Penetrations and JointsMEHDI GHAZIspecial
05/10/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationMEHDI GHAZIspecial
05/10/2022Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesMEHDI GHAZIspecial
05/10/2022Sprinkler SystemsMEHDI GHAZIspecial
05/10/2022Energy Code Compliance InspectionsMEHDI GHAZIprogress
05/10/2022HVAC-R and service water piping design and insulationMEHDI GHAZIenergy_progress
05/10/2022HVAC-R and service water heating equipmentMEHDI GHAZIenergy_progress
05/10/2022HVAC-R and service water heating system controlsMEHDI GHAZIenergy_progress
▾Documents — 131 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch4
08/27/2026Q00549505-I1Request digital key ↗
08/27/2026Q00567256-I1Request digital key ↗
08/27/2026Q00567256-P4Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Structural1
08/28/2026Q00351985-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/28/2026Q00260406-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
08/14/2026Q00214041-I1Request digital key ↗
▸Applications & Permits18
▸BISPLAN / WORK APPROVAL APPLICATION13
08/15/2023421918875Open ↗
03/28/2023421918875Open ↗
03/20/2023421918875Open ↗
Showing 3 of 13 on file for this type
▸BISWORK PERMIT APPLICATION2
10/05/2021421918875Open ↗
08/19/2021440598042Open ↗
▸BISBPP - Street Opening DOT Permit - BPP - Street Opening1
06/08/2023421746757Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
02/09/2023421746757Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
01/17/2023421918875Open ↗
▸Zoning, Tax Lot & Property Records5
▸BISZONING DIAGRAM2
07/20/2021421918875Open ↗
12/20/2019421918875Open ↗
▸BISVERIFY TAX LOT1
03/27/2023421918875Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
09/03/2019421918875Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
04/13/2023421918875Open ↗
▸Seals & Professional Certifications19
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/28/2026Q00214041-I1Open ↗
08/28/2026Q00260406-I1Open ↗
08/28/2026Q00351985-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/25/2026Q00567256-P1Open ↗
08/25/2026Q00567256-P1Open ↗
08/23/2026Q00567256-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
09/03/2019421918875Open ↗
09/03/2019421918875Open ↗
06/18/2019421918875Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/25/2026Q00567256-P1Open ↗
08/23/2026Q00567256-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
06/09/2020440598042Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/09/2020440598042Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
06/09/2020440598042Open ↗
▸Trade Schedules & Equipment3
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
12/16/2019421918875Open ↗
06/18/2019421918875Open ↗
▸BISSCHEDULE B - PLUMBING1
06/01/2021421918875Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST2
12/20/2019421918875Open ↗
06/18/2019421918875Open ↗
▸BISSTREET TREE SIGNOFF1
03/27/2023421918875Open ↗
▸BISSTREET TREES SITE PLAN1
03/22/2023421918875Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
03/22/2023421918875Open ↗
09/30/2021421918875Open ↗
07/20/2021421918875Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
09/26/2019421918875Open ↗
06/18/2019421918875Open ↗
▸BIS* SOLAR READY REQUIREMENTS1
08/23/2023421918875Open ↗
▸BISNYCECC EXEMPTION1
06/09/2020440598042Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
03/30/2023421918875Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
08/08/2023421918875Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00567256-I1Open ↗
▸Inspections & Test Reports21
▸BISTECHNICAL REPORT: RESPONSIBILITY12
03/22/2023421918875Open ↗
12/22/2021440598042Open ↗
12/21/2021440598042Open ↗
Showing 3 of 12 on file for this type
▸BISDEMOLITION (DM) JOB SIGNOFF2
03/27/2023421918875Open ↗
10/01/2021421918875Open ↗
▸BISSOIL REPORT1
06/09/2020440598042Open ↗
▸BISSOIL PERC. TEST-PVT ON-SITE STORM WATER DRAINAGE DISPOSAL SYS & DET. FACL.1
08/08/2023421918875Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
09/30/2021421918875Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
09/03/2019421918875Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
09/30/2021421918875Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
01/30/2023421918875Open ↗
▸BISSUBSURFACE / SOILS INVESTIGATION (BORINGS/TEST PITS)1
06/09/2020440598042Open ↗
▸Approvals, Objections & Sign-offs14
▸BISLETTERS - SUPPORTING DOCUMENTATION6
08/15/2023421918875Open ↗
03/09/2023421918875Open ↗
12/23/2021440598042Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE5
03/28/2023421918875Open ↗
03/27/2023421918875Open ↗
03/20/2023421918875Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
12/23/2021440598042Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM (SIGNOFF)1
08/23/2023421918875Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
06/08/2023421746757Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT1
06/09/2020440598042Open ↗
▸BISBPP-11 - Affidavit as to Roadway Pavement And/Or Sidewalk and Curb Construction1
06/08/2023421746757Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
12/21/2021440598042Open ↗
▸Filing & Intake Forms16
▸BISADDITIONAL INFORMATION11
04/11/2023421918875Open ↗
04/11/2023421918875Open ↗
03/23/2023421918875Open ↗
Showing 3 of 11 on file for this type
▸BISEFILING COVER SHEET2
08/13/2019421746757Open ↗
06/18/2019421918875Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
08/14/2019421746757Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
06/09/2020440598042Open ↗
▸BISBOROUGH INTAKE FORM1
08/15/2023421918875Open ↗
▸Other Documents10
▸BISBPP - SUPPORTING DOCUMENTATION5
06/08/2023421746757Open ↗
06/08/2023421746757Open ↗
06/08/2023421746757Open ↗
Showing 3 of 5 on file for this type
▸BISPLOT DIAGRAM3
04/13/2023421918875Open ↗
09/03/2019421918875Open ↗
06/18/2019421918875Open ↗
▸BISREVISED ZD11
09/08/2020421918875Open ↗
▸BISELECTRIC VEHICLE SERVICE EQUIPMENT REQUIREMENTS1
08/09/2023421918875Open ↗