← Back
BuildNYC
Public elementary, junior or senior high
P.S. 171 Peter G. Van Alst
14-14 29TH AVENUE · BIN 4006046
💬 Discuss this project
1950Year Built
3Stories
W1Building Class
R6BZoning
91,254 sfGross Floor Area
1Units
LL97 Covered2 Active Violations 0 unresolved · 2 paperwork only ▸
Public elementary, junior or senior high · Owner of record: NYC Department of Education · 56,000 sf lot · 1.63 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofP.S. 171 Peter G. Van Alst1 filing · 20 docs
Floor 3P.S. 171 Peter G. Van Alst1p · 2 filings · 20 docs
Floor 2P.S. 171 Peter G. Van Alst1p · 3 filings · 20 docs
Floor 1P.S. 171 Peter G. Van Alst1p · 3 filings · 20 docs
CellarP.S. 171 Peter G. Van Alst1 filing · 20 docs
Site & exteriorP.S. 171 Peter G. Van Alst32p · 5 filings · 18 docs
Filed — no permit issuedP.S. 171-Queens4p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC School Construction Authority7008/29/2026
NYC Department of Education403/22/2026
S&W Wilson103/21/2026
New York City Public School103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AK Consulting Services803/21/2026
JMV Associates1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Granite EnvironmentalScaffold1407/08/2026
Kel-Tech ConstructionScaffold907/08/2026
Granite EnvironmentalGeneral Contractor607/08/2026
Charan Electrical Enterp'sElectrical203/22/2026
AL-Lectric Elect'l ContractingElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JPC Logistics Dba JPCL EN351109/08/2025
Universal Testing and Ins400405/01/2025
Building Lifecycle
All (161)Filed (19)Permit Issued (20)Signed Off (5)Violation (60)Inspection (1)Objection (26)Special Inspection (30)
06/15/2026
Signed off — Alteration
REMOVE PARAPETS DOWN TO ROOF, REMOVAL OF FACE BRICK DOWN TO LINTEL, CLEAN AND REPAIR OF WINDOW LINTELS, REBUILD FACE BRICK, AND REPLACEMENT OF CORNER BRICK.
Q00602068-I1
05/15/2026
Signed off — Alteration
Q08002172-I1
05/15/2026
Signed off — Alteration
Q08002164-I1
05/12/2026
Objection raised — Other
05/12/2026
Special inspection requirement — Post-installed Anchors
05/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/12/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
05/11/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
05/07/2026
Filed — Alteration
P.S. 171-Q: Existing boiler, oil tanks, and steam systems in cellar removed. New 300-ton heat pump chiller/heater on roof and Backup boilers installed.
Q01186687-P1
05/07/2026
Filed — Alteration
P.S. 171-Q: Existing boiler, oil tanks, and steam systems in cellar removed. New 300-ton heat pump chiller/heater on roof and Backup boilers installed.
Q01186687-P2
05/05/2026
Special inspection requirement — Post-installed Anchors
05/05/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
05/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/04/2026
Special inspection requirement — Lowest Floor Elevation
05/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/04/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
05/04/2026
Special inspection requirement — Heating Systems
05/04/2026
Special inspection requirement — Mechanical Systems
05/04/2026
Special inspection requirement — Post-installed Anchors
05/04/2026
Special inspection requirement — Final
03/18/2026
Permit issued — General Construction
Q00602068-I1-GC
01/30/2026
Violation issued (ECB, open)
Construction
01/30/2026
Violation issued (ECB, open)
Construction
09/08/2025
Filed — Alteration
Q01163912-I1
06/02/2025
Special inspection requirement — Masonry
NELSON LOPEZ
06/02/2025
Special inspection requirement — Post-installed Anchors
NELSON LOPEZ
05/15/2025
Signed off — Alteration
SUBMITTED ON BEHALF OF CONTRACTOR FOR THE INSTALLATION OF EMERGENCY TEMPORARY CONSTRUCTION EQUIPMENT (scaffolding) 13700 SQF, IN CONJUNCTION WITH LLW # 122382. NO CHANGE IN USE, OCCUPANCY OR EGRESS
Q00327492-I1
05/15/2025
Signed off — Alteration
SUBMITTED ON BEHALF OF CONTRACTOR FOR THE INSTALLATION OF EMERGENCY TEMPORARY CONSTRUCTION EQUIPMENT (SHED) 350 LF, NO CHANGE IN USE, OCCUPANCY OR EGRESS
Q00320779-I1
05/01/2025
Filed — Alteration
REMOVE PARAPETS DOWN TO ROOF, REMOVAL OF FACE BRICK DOWN TO LINTEL, CLEAN AND REPAIR OF WINDOW LINTELS, REBUILD FACE BRICK, AND REPLACEMENT OF CORNER BRICK.
Q00602068-P1
04/30/2025
Special inspection requirement — Post-installed Anchors
NELSON LOPEZ
04/30/2025
Special inspection requirement — Masonry
NELSON LOPEZ
04/15/2025
Objection resolved — Addressed
04/15/2025
Objection resolved — Addressed
04/15/2025
Objection resolved — Addressed
04/14/2025
Objection resolved — Addressed
04/14/2025
Objection resolved — Addressed
04/14/2025
Objection resolved — Addressed
04/14/2025
Objection resolved — Addressed
04/14/2025
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
04/11/2025
Special inspection requirement — Lowest Floor Elevation
04/09/2025
Objection raised — Admin
04/08/2025
Filed — Alteration
P.S. 171-Q: Existing boiler, oil tanks, and steam systems in cellar removed. New 300-ton heat pump chiller/heater on roof and Backup boilers installed.
Q01186687-S6
04/07/2025
Objection raised — Other
04/07/2025
Objection resolved — Addressed
04/07/2025
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
04/07/2025
Special inspection requirement — Fire-Resistance Rated Construction
04/04/2025
Filed — Alteration
P.S. 171-Q: Existing boiler, oil tanks, and steam systems in cellar removed. New 300-ton heat pump chiller/heater on roof and Backup boilers installed.
Q01186687-S7
04/04/2025
Special inspection requirement — Heating Systems
03/27/2025
Special inspection requirement — Heating Systems
03/27/2025
Special inspection requirement — Post-installed Anchors
03/18/2025
Objection raised — Admin
03/18/2025
Objection raised — Other
03/18/2025
Objection raised — Other
03/18/2025
Objection raised — Admin
03/18/2025
Objection raised — Other
03/18/2025
Objection raised — Other
03/13/2025
Violation issued (ECB, closed)
Construction
03/05/2025
Filed — Alteration
P.S. 171-Q: Existing boiler, oil tanks, and steam systems in cellar removed. New 300-ton heat pump chiller/heater on roof and Backup boilers installed.
Q01186687-S5
03/05/2025
Filed — Alteration
P.S. 171-Q: Existing boiler, oil tanks, and steam systems in cellar removed. New 300-ton heat pump chiller/heater on roof and Backup boilers installed.
Q01186687-S4
03/05/2025
Permit issued — General Construction
Q00602068-I1-GC
Latest 60 of 161 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offGranite Environmental03/18/2026
DOB NOWGeneral ConstructionSigned-offGranite Environmental03/05/2025
DOB NOWSidewalk ShedSigned-offGranite Environmental01/23/2025
DOB NOWConstruction FenceSigned-offGranite Environmental01/22/2025
DOB NOWConstruction FenceSigned-offGranite Environmental02/28/2024
DOB NOWSupported ScaffoldPermit IssuedGranite Environmental01/24/2024
DOB NOWGeneral ConstructionSigned-offGranite Environmental01/24/2024
DOB NOWSidewalk ShedSigned-offGranite Environmental01/24/2024
DOB NOWGeneral ConstructionSigned-offGranite Environmental04/07/2023
DOB NOWSupported ScaffoldPermit IssuedGranite Environmental04/03/2023
DOB NOWSidewalk ShedSigned-offGranite Environmental03/16/2023
DOB NOWConstruction FenceSigned-offGranite Environmental03/09/2023
DOB NOWSidewalk ShedSigned-offKel-Tech Construction04/14/2022
DOB NOWSupported ScaffoldSigned-offKel-Tech Construction04/14/2022
DOB NOWSidewalk ShedSigned-offKel-Tech Construction04/06/2021
DOB NOWSupported ScaffoldSigned-offKel-Tech Construction04/06/2021
DOB NOWSidewalk ShedSigned-offKel-Tech Construction01/26/2021
DOB NOWSupported ScaffoldSigned-offKel-Tech Construction01/26/2021
DOB NOWSupported ScaffoldSigned-offKel-Tech Construction04/30/2020
DOB NOWSidewalk ShedSigned-offKel-Tech Construction04/21/2020
BISOTISSUEDPro-Metal Construction10/28/2019
BISOTISSUEDPro-Metal Construction10/28/2019
BISOTISSUEDPro-Metal Construction10/24/2018
BISOTISSUEDPro-Metal Construction10/24/2018
BISOTISSUEDPro-Metal Construction10/24/2018
BISOTISSUEDPro-Metal Construction04/24/2018
BISOTISSUEDPro-Metal Construction04/24/2018
BISOTISSUEDPro-Metal Construction04/24/2018
BISOTISSUEDPro-Metal Construction04/24/2018
BISPLISSUEDVarsity Plumbing and Heating08/21/2017
BISPLISSUEDVarsity Plumbing and Heating07/31/2017
BISOTISSUEDPro-Metal Construction05/10/2017
BISOTISSUEDPro-Metal Construction05/10/2017
BISOTISSUEDPro-Metal Construction05/10/2017
BISOTISSUEDPro-Metal Construction05/10/2017
BISOTISSUEDPro-Metal Construction05/05/2017
BISOTISSUEDPro-Metal Construction05/05/2017
BISPLISSUEDVarsity Plumbing and Heating03/02/2017
BISPLISSUEDVarsity Plumbing and Heating08/01/2016
BISOTISSUEDPro-Metal Construction05/09/2016
+ 30 more permits on file
1 project · most recent 05/07/2026
Air Conditioning Systems Heating and Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/07/2026——Air Conditioning Systems, Heating and Air Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Mitsubishi Electric PKA-A18LA 18,000 BTU · Fan Coil Indoor ×2
PUY-A18NKA7 18,000 BTU · Condensing Unit ×2
Heat / Cool
Daikin FCVC102 220 CFM ×7
Heating
Berko PHFP25 6,398 BTU · Electric Heater ×18
Jetson ACCM-060 53 tons · Condensing Unit ×5
Johnson Controls XTI-36X51 3,000 CFM · Fan Coil Indoor ×1
Ventilation
Johnson Controls XTI-42X51 3,700 CFM · Chiller ×3
XTI-42X75 6,500 CFM ×1
XTI-42X81 7,500 CFM ×1
XTI-45X51 3,500 CFM ×1
XTI-45X54 4,000 CFM ×1
Loren Cook GN-168 50 CFM · Exhaust Fan ×1
SQND-HP VF 3,100 CFM · Exhaust Fan ×1
1 project · most recent 05/07/2026
FiledStatusContractorScope
05/07/2026——9 heads
1 project · most recent 05/07/2026
Gas Water/Sanitary
FiledStatusContractorScope
05/07/2026——Gas, Water/Sanitary
8 projects · most recent 09/12/2024
General Wiring
FiledStatusContractorScope
09/12/2024CompleteCharan Electrical Enterp's—
05/09/2023CompleteSelectric Electrical Cont Co I—
05/09/2023CompleteSelectric Electrical Cont Co IGeneral Wiring
02/04/2022CompleteStanco System Electrical Cont—
02/21/2020Permit IssuedSamco Electric—
01/21/2020CompleteCharan Electrical Enterp's—
08/14/2019CompleteCharan Electrical Enterp's2 meters, 2 new_meters
05/10/2019CompleteMulti-Tech ElectricGeneral Wiring
1 project · most recent 05/07/2026
Steel Concrete
FiledStatusContractorScope
05/07/2026——Steel, Concrete
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
05/11/2026Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
05/12/2026Post-installed Anchors—special
05/12/2026Fire-Resistant Penetrations and Joints—special
05/12/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)—special
05/05/2026Post-installed Anchors—special
05/05/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)—special
05/05/2026Fire-Resistant Penetrations and Joints—special
05/04/2026Lowest Floor Elevation—progress
05/04/2026Fire-Resistant Penetrations and Joints—special
05/04/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)—special
05/04/2026Heating Systems—special
05/04/2026Mechanical Systems—special
05/04/2026Post-installed Anchors—special
05/04/2026Final—progress
06/02/2025MasonryNELSON LOPEZspecial
06/02/2025Post-installed AnchorsNELSON LOPEZspecial
04/30/2025Post-installed AnchorsNELSON LOPEZspecial
04/30/2025MasonryNELSON LOPEZspecial
04/14/2025Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)—special
04/11/2025Lowest Floor Elevation—progress
04/07/2025Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)—special
04/07/2025Fire-Resistance Rated Construction—progress
04/04/2025Heating Systems—special
03/27/2025Heating Systems—special
03/27/2025Post-installed Anchors—special
03/03/2025Sprinkler Systems—special
Latest 25 of 32.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
P.S. 171 Peter G. Van AlstEducationCellar, Floors 1–3, Roof
Project Q01163912 Alteration · Approved · 09/08/2025
Project Q01186687 Alteration · Objections · 02/28/2025
Project Q08002164 Alteration · LOC Issued · 09/18/2022
Project Q08002172 Alteration · LOC Issued · 09/14/2022
Project Q08002177 Alteration · Permit Entire · 09/14/2022
Project Q00602068 Alteration · LOC Issued · 10/04/2021
Project Q00327492 Alteration · LOC Issued · 04/21/2020
Project Q00320779 Alteration · LOC Issued · 03/05/2020
P.S. 171-QueensEducation—
Project Q01120528 Alteration · Objections · 10/15/2024
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 169 on file (BIS + DOB NOW)
▸Plans & Drawings20
▸DOB NOWPlans/Sketch18
08/25/2026Q08002177-P1Request digital key ↗
08/25/2026Q08002172-I1Request digital key ↗
08/25/2026Q08002164-I1Request digital key ↗
Showing 3 of 18 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold1
08/15/2026Q00327492-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/28/2026Q00320779-I1Request digital key ↗
▸Applications & Permits7
▸BISWORK PERMIT APPLICATION4
08/16/2019440542619Open ↗
08/16/2019440550501Open ↗
02/22/2013420611939Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION3
06/05/2019440550501Open ↗
06/03/2019440542619Open ↗
09/28/2012420611939Open ↗
▸Seals & Professional Certifications33
▸DOB NOWDPL-1: Design Professional Seal & Signature20
08/28/2026Q00327492-I1Open ↗
08/20/2026Q00602068-P1Open ↗
08/20/2026Q00602068-I1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/02/2026Q00327492-I1Open ↗
08/24/2026Q00602068-P1Open ↗
08/23/2026Q00602068-I1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
08/10/2013420611939Open ↗
09/28/2012420611939Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
06/05/2019440550501Open ↗
06/03/2019440542619Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
06/05/2019440550501Open ↗
06/03/2019440542619Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
06/05/2019440550501Open ↗
06/03/2019440542619Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
09/28/2012420611939Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
09/28/2012420611939Open ↗
▸Safety & Tenant Protection6
▸DOB NOWNYCSCA - Approved Site Safety Plans6
08/13/2026Q08002177-P1Open ↗
08/13/2026Q00327492-I1Open ↗
08/13/2026Q08002172-I1Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos3
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)2
06/05/2019440550501Open ↗
06/03/2019440542619Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/20/2026Q00602068-I1Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
08/06/2019440550501Open ↗
06/05/2019440550501Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
11/10/2022440550501Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
11/10/2022440550501Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
11/08/2022440550501Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
06/05/2019440550501Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY4
08/06/2019440550501Open ↗
08/06/2019440542619Open ↗
06/05/2019440550501Open ↗
Showing 3 of 4 on file for this type
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS2
11/10/2022440542619Open ↗
11/10/2022440550501Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
11/10/2022440550501Open ↗
▸Approvals, Objections & Sign-offs53
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter20
08/19/2026Q01163912-I1Open ↗
08/16/2026Q01186687-P2Open ↗
08/15/2026Q01186687-P1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)18
08/16/2026Q01186687-P2Open ↗
08/15/2026Q01186687-P1Open ↗
08/13/2026Q01120528-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)4
08/25/2026Q08002172-I1Open ↗
08/25/2026Q08002164-I1Open ↗
08/20/2026Q00602068-I1Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
11/17/2022440542619Open ↗
11/17/2022440550501Open ↗
08/10/2013420611939Open ↗
▸BISDESIGN COMM. SIGNOFF: CITY-OWNED PROPERTY (EXTERIOR WORK)2
11/04/2022440542619Open ↗
11/04/2022440550501Open ↗
▸BISDESIGN COMM. APPROVAL: CITY-OWNED PROPERTY (EXTERIOR WORK)2
06/05/2019440550501Open ↗
06/03/2019440542619Open ↗
▸BISFINAL2
11/10/2022440542619Open ↗
11/10/2022440550501Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
09/28/2012420611939Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
09/28/2012420611939Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT3
02/04/2022440550501Open ↗
06/05/2019440550501Open ↗
06/03/2019440542619Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW32
11/03/2022440542619Open ↗
11/03/2022440550501Open ↗
▸Filing & Intake Forms3
▸BISEFILING JOB APPLICATION COVER SHEET2
06/05/2019440550501Open ↗
06/03/2019440542619Open ↗
▸BISEFILING COVER SHEET1
09/28/2012420611939Open ↗
▸Other Documents26
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal20
08/16/2026Q01186687-P2Open ↗
08/16/2026Q01186687-S4Open ↗
08/15/2026Q01186687-P1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWProof of Historic Building3
08/15/2026Q01186687-P1Open ↗
08/13/2026Q01163912-I1Open ↗
08/13/2026Q01186687-I1Open ↗
▸DOB NOWNYCSCA Exhibit 23
08/25/2026Q08002172-I1Open ↗
08/25/2026Q08002164-I1Open ↗
08/20/2026Q00602068-I1Open ↗