← Back
Three families
14-20 114 STREET
QUEENS · BIN 4097929
💬 Discuss this project
1910Year Built
3Stories
C0Building Class
R4-1Zoning
2,640 sfGross Floor Area
3Units
Rent Stabilized31 Open Violations ▸
Three families · Owner of record: MODEH ANI 26 REALTY LLC · 2,500 sf lot · 1.06 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectrical
Roof2p · 1 filing · 7 docs
Floor 31p · 1 filing · 7 docs
Floor 2
Floor 12p · 1 filing · 7 docs
Cellar8p · 2 filings · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MODEH ANI 26 REALTY LLC103/22/2026
14-20 114 STREET LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/23/2024$1.4M—— → —$530/sf building
02/10/2022$850K—Private party → 14-20 114 STREET LLC$322/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
A M ENGINEERING SERVICES PC412/12/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AM ENGINEERING SERVICES403/21/2026
DFE ENGINEERING P.C.403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DONOVAN PETGRAVEGeneral Contractor303/21/2026
EH PLUMBING & HEATING CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ANETONNE ARCHITECTURE P.C7293412/12/2023
Building Lifecycle
All (73)Filed (4)Permit Issued (2)Signed Off (2)Violation (58)Inspection (6)Special Inspection (1)
07/16/2026
Violation issued (HPD, closed)
C
05/07/2026
Violation issued (HPD, open)
A
12/15/2025
Violation issued (HPD, open)
C
12/15/2025
Violation issued (HPD, closed)
C
12/15/2025
Violation issued (HPD, closed)
C
12/11/2025
Violation issued (HPD, open)
B
12/11/2025
Violation issued (HPD, open)
B
12/11/2025
Violation issued (HPD, closed)
A
12/11/2025
Violation issued (HPD, open)
B
12/11/2025
Violation issued (HPD, open)
A
12/11/2025
Violation issued (HPD, closed)
C
12/11/2025
Violation issued (HPD, open)
B
11/23/2025
Violation issued (HPD, open)
B
11/23/2025
Violation issued (HPD, open)
B
11/23/2025
Violation issued (HPD, open)
C
11/23/2025
Violation issued (HPD, open)
C
11/23/2025
Violation issued (HPD, open)
B
11/21/2025
Violation issued (HPD, closed)
I
09/27/2025
Violation issued (HPD, open)
B
09/27/2025
Violation issued (HPD, open)
C
09/27/2025
Violation issued (HPD, open)
B
09/27/2025
Violation issued (HPD, open)
C
09/27/2025
Violation issued (HPD, open)
A
09/27/2025
Violation issued (HPD, open)
C
09/27/2025
Violation issued (HPD, closed)
A
09/27/2025
Violation issued (HPD, open)
B
06/12/2025
Violation issued (HPD, open)
A
12/02/2024
Violation issued (HPD, closed)
I
09/03/2024
Violation issued (HPD, open)
A
09/03/2024
Violation issued (HPD, closed)
C
09/03/2024
Violation issued (HPD, closed)
C
09/03/2024
Violation issued (HPD, open)
A
09/03/2024
Violation issued (HPD, open)
C
09/03/2024
Violation issued (HPD, open)
A
09/03/2024
Violation issued (HPD, open)
A
09/03/2024
Violation issued (HPD, open)
A
09/03/2024
Violation issued (HPD, open)
C
04/15/2024
Violation issued (HPD, open)
A
02/15/2024
Violation issued (ECB, closed)
Construction
02/14/2024
Signed off — Alteration
INTERIOR RENOVATION AT CELLAR, 1ST, 2ND AND 3RD FLOOR. KITCHENS AND BATHROOMS TO BE RELOCATED UNDER SEPARATE JOB APPLICATION. INSTALLATION OF NEW NON-BEARING PARTITIONS AS PER PLANS. CORRECT ECB VIOLATION # 35578891L.NO CHANGE OF USE, EGRESS OR OCCUPANCY.
Q00718112-I1
02/13/2024
Signed off — Alteration
REMOVE 2 GAS METERS (1) BOILER (1) HWH AT CELLAR. RELO (1) TUB (1) TOILET (1) LAVATORY (1) KITCHEN SINK PROP (1) TUB (1) TOILET (1) LAVATORY & (1) DISHWASHER AT 1ST FL. REPLACE (1) TUB (1) TOILET (1) LAVATORY (1) KITCHEN SINK &PROP DISHWASHER AT 2 & 3 FL
Q00749170-I1
02/12/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
01/23/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
01/11/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
12/27/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/12/2023
Filed — Alteration
REMOVE 2 GAS METERS (1) BOILER (1) HWH AT CELLAR. RELO (1) TUB (1) TOILET (1) LAVATORY (1) KITCHEN SINK PROP (1) TUB (1) TOILET (1) LAVATORY & (1) DISHWASHER AT 1ST FL. REPLACE (1) TUB (1) TOILET (1) LAVATORY (1) KITCHEN SINK &PROP DISHWASHER AT 2 & 3 FL
Q00749170-P1
12/12/2023
Filed — Alteration
INTERIOR RENOVATION AT CELLAR, 1ST, 2ND AND 3RD FLOOR. KITCHENS AND BATHROOMS TO BE RELOCATED UNDER SEPARATE JOB APPLICATION. INSTALLATION OF NEW NON-BEARING PARTITIONS AS PER PLANS. CORRECT ECB VIOLATION # 35578891L.NO CHANGE OF USE, EGRESS OR OCCUPANCY.
Q00718112-P1
12/06/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
TOBECHI CHINDOH
11/24/2023
Violation issued (HPD, closed)
I
03/28/2023
Violation issued (HPD, open)
A
11/15/2022
Violation issued (HPD, closed)
I
11/08/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/04/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/28/2022
Permit issued — Plumbing
Q00749170-I1-PL
07/15/2022
Permit issued — General Construction
Q00718112-I1-GC
06/03/2022
Filed — Alteration
REMOVE 2 GAS METERS (1) BOILER (1) HWH AT CELLAR. RELO (1) TUB (1) TOILET (1) LAVATORY (1) KITCHEN SINK PROP (1) TUB (1) TOILET (1) LAVATORY & (1) DISHWASHER AT 1ST FL. REPLACE (1) TUB (1) TOILET (1) LAVATORY (1) KITCHEN SINK &PROP DISHWASHER AT 2 & 3 FL
Q00749170-I1
06/01/2022
Filed — Alteration
INTERIOR RENOVATION AT CELLAR, 1ST, 2ND AND 3RD FLOOR. KITCHENS AND BATHROOMS TO BE RELOCATED UNDER SEPARATE JOB APPLICATION. INSTALLATION OF NEW NON-BEARING PARTITIONS AS PER PLANS. CORRECT ECB VIOLATION # 35578891L.NO CHANGE OF USE, EGRESS OR OCCUPANCY.
Q00718112-I1
03/16/2022
Violation issued (ECB, closed)
Construction
03/04/2022
Violation issued (HPD, closed)
I
03/04/2022
Violation issued (HPD, open)
A
Latest 60 of 73 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offEH PLUMBING & HEATING COR10/28/2022
DOB NOWGeneral ConstructionSigned-offDONOVAN PETGRAVE07/15/2022
3 projects · most recent 11/02/2023
General Wiring
FiledStatusContractorScope
11/02/2023Permit IssuedWCK ELECTRIC CORP.General Wiring
10/23/2023Permit IssuedWCK ELECTRIC CORP.General Wiring
06/24/2022Permit IssuedJOSEPH WEINSTEIN ELECTRICGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
02/12/2024Pass-Final General Construction Non-Directive 14PassView ↗
01/23/2024Fail-Final General Construction Non-Directive 14FailView ↗
01/11/2024Fail-Final General Construction Non-Directive 14FailView ↗
12/27/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/08/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/04/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
12/06/2023Fire-Resistant Penetrations and JointsTOBECHI CHINDOHspecial
▾Documents — 14 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/23/2026Q00718112-P1Request digital key ↗
08/23/2026Q00718112-I1Request digital key ↗
08/23/2026Q00749170-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/23/2026Q00718112-I1Open ↗
08/23/2026Q00749170-I1Open ↗
08/13/2026Q00749170-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature1
08/22/2026Q00749170-P1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/23/2026Q00718112-I1Open ↗
08/23/2026Q00749170-I1Open ↗
08/13/2026Q00718112-P1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026Q00718112-I1Open ↗