← Back
Elevator apt, semi-fireproof without stores
14-20 GATEWAY BOULEVARD
QUEENS · BIN 4298279
💬 Discuss this project
1930Year Built
6Stories
D1Building Class
R5Zoning
71,000 sfGross Floor Area
78Units
LL97 CoveredRent Stabilized5 Open Violations ▸FDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: 1420 1424 GATEWAY BOU · 34,200 sf lot · 2.08 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BAYSWATER GARDENS1207/08/2026
1420 1424 GATEWAY BOU803/22/2026
1420 1424 GATEWAY BOU 1103/22/2026
INDUS REALTY1503/22/2026
1420 GATEWAY BOU.103/22/2026
1420-1424 GATEWAY BLVD803/22/2026
KHUBANI ENTERPRISES IN1003/22/2026
HINDUS REALTY303/22/2026
OWNER OF 14-20/14-24 GATE103/22/2026
TO THE OWNER OF 14-20 GRE203/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEW YORK ENGINEERING ASSOCIATES P603/21/2026
NODE ENGINEERING CONSULTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A & C HEATING SERVICES INGeneral Contractor107/08/2026
A & C HTG SERVICES, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RI CONSULTING SERVICES IN8904106/02/2026
NEW YORK ENGINEERING ASSO851310/02/2024
NODE ARCHITECTURE,ENGINEE6799108/14/2024
Building Lifecycle
All (90)Filed (5)Permit Issued (3)Signed Off (3)Violation (60)Inspection (2)Objection (4)Special Inspection (13)
07/02/2026
Violation issued (HPD, open)
C
07/02/2026
Violation issued (HPD, open)
B
06/15/2026
Objection raised — Other
06/15/2026
Objection resolved — Addressed
06/12/2026
Violation issued (HPD, closed)
C
06/12/2026
Violation issued (HPD, closed)
C
06/11/2026
Objection raised — Other
06/11/2026
Objection resolved — Addressed
06/02/2026
Filed — Alteration
SUSPENDED SCAFFOLD OUTRIGGER SYSTEM INSTALLATION FOR FACADE REPAIRS AND INSPECTIONS.
Q01406836-I1
02/02/2026
Violation issued (HPD, closed)
C
02/02/2026
Violation issued (HPD, closed)
B
02/02/2026
Violation issued (HPD, closed)
C
02/27/2025
Signed off — Alteration
REPLACE GAS/OIL BURNER ON EXISTING BOILER.
Q01110948-S1
02/27/2025
Signed off — Alteration
REPLACE GAS/OIL BURNER ON EXISTING BOILER.
Q01110948-S2
02/27/2025
Signed off — Alteration
REPLACE GAS/OIL BURNER ON EXISTING BOILER.
Q01110948-I1
02/06/2025
Violation issued (ECB, closed)
Construction
01/30/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/17/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
10/16/2024
Permit issued — General Construction
Q01110948-S2-GC
10/15/2024
Permit issued — Plumbing
Q01110948-S1-PL
10/11/2024
Permit issued — Boiler Equipment
Q01110948-I1-BE
10/02/2024
Filed — Alteration
REPLACE GAS/OIL BURNER ON EXISTING BOILER.
Q01110948-S1
10/02/2024
Filed — Alteration
REPLACE GAS/OIL BURNER ON EXISTING BOILER.
Q01110948-S2
10/02/2024
Filed — Alteration
REPLACE GAS/OIL BURNER ON EXISTING BOILER.
Q01110948-I1
10/01/2024
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
10/01/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
10/01/2024
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
09/13/2024
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
09/13/2024
Special inspection requirement — Heating Systems
LOUIS ARENA
09/13/2024
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
09/13/2024
Special inspection requirement — Final
LOUIS ARENA
09/13/2024
Special inspection requirement — Chimneys and vents
LOUIS ARENA
09/13/2024
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
09/13/2024
Special inspection requirement — Maintenance information
LOUIS ARENA
08/14/2024
Filed — Alteration
Q01094317-I1
08/09/2024
Special inspection requirement — Tenant Protection Plan Compliance
Radomir Delic
08/09/2024
Special inspection requirement — Masonry
Radomir Delic
08/09/2024
Special inspection requirement — Final
Radomir Delic
08/07/2024
Violation issued (ECB, closed)
Elevators
01/19/2024
Violation issued (ECB, closed)
Elevators
01/19/2024
Violation issued (ECB, closed)
Elevators
11/11/2023
Violation issued (HPD, closed)
C
11/11/2023
Violation issued (HPD, closed)
B
11/11/2023
Violation issued (HPD, closed)
B
11/11/2023
Violation issued (HPD, closed)
B
11/11/2023
Violation issued (HPD, closed)
B
07/28/2023
Violation issued (ECB, closed)
Elevators
03/14/2021
Violation issued (HPD, closed)
B
03/14/2021
Violation issued (HPD, closed)
A
03/14/2021
Violation issued (HPD, closed)
A
03/14/2021
Violation issued (HPD, closed)
B
11/24/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/24/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/16/2019
Violation issued (HPD, closed)
C
08/09/2019
Violation issued (HPD, closed)
C
08/09/2019
Violation issued (HPD, closed)
B
08/09/2019
Violation issued (HPD, closed)
C
08/09/2019
Violation issued (HPD, closed)
B
08/08/2019
Violation issued (HPD, closed)
B
08/08/2019
Violation issued (HPD, closed)
B
Latest 60 of 90 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offA & C HEATING SERVICES IN10/16/2024
DOB NOWPlumbingSigned-offDMC PLBG & HTG CORP10/15/2024
DOB NOWBoiler EquipmentSigned-offA&C HEATING SERVICES INC10/11/2024
BISOTISSUEDCOMMUNICATION COMPONENT S06/28/2012
BISPLISSUEDCITY TESTING & PLUMBING I05/19/2010
BISOTISSUEDDUARTE CONSTRUCTION CORP11/24/2009
BISOTISSUEDPCS CONTRACTING INC08/20/2008
BISFBISSUEDABILENE, INC10/02/1998
BISPLISSUEDBELL FUEL OIL, LLC10/02/1998
BISBLISSUEDMETROPOLITAN HEAT AND POWER07/26/1989
2 projects · most recent 05/09/2024
FiledStatusContractorScope
05/09/2024Permit IssuedKENNETH ELECTRIC INC45 meters
05/09/2024CompleteKENNETH ELECTRIC INC45 meters
1 project · most recent 06/02/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
06/02/2026——Suspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
01/30/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/17/2025Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
10/01/2024HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
10/01/2024HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
10/01/2024HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
09/13/2024Tenant Protection Plan ComplianceLOUIS ARENAspecial
09/13/2024Heating SystemsLOUIS ARENAspecial
09/13/2024Tenant Protection Plan ComplianceLOUIS ARENAspecial
09/13/2024FinalLOUIS ARENAprogress
09/13/2024Chimneys and ventsLOUIS ARENAspecial
09/13/2024Tenant Protection Plan ComplianceLOUIS ARENAspecial
09/13/2024Maintenance informationLOUIS ARENAenergy_progress
08/09/2024Tenant Protection Plan ComplianceRadomir Delicspecial
08/09/2024MasonryRadomir Delicspecial
08/09/2024FinalRadomir Delicprogress
▾Documents — 65 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/21/2026Q01094317-P1Request digital key ↗
08/21/2026Q01094317-I1Request digital key ↗
08/21/2026Q01110948-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits8
▸BISPLAN / WORK APPROVAL APPLICATION5
08/05/2015421193880Open ↗
05/14/2012420564516Open ↗
05/05/2010420181323Open ↗
Showing 3 of 5 on file for this type
▸BISWORK PERMIT APPLICATION3
06/30/2012420564516Open ↗
06/03/2010420181323Open ↗
08/21/2008410034948Open ↗
▸Seals & Professional Certifications25
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
08/05/2015421193880Open ↗
05/14/2012420564516Open ↗
03/30/2012420181323Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/23/2026Q01110948-I1Open ↗
09/23/2026Q01110948-I1Open ↗
09/01/2026Q01094317-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/23/2026Q01110948-I1Open ↗
09/23/2026Q01110948-I1Open ↗
09/23/2026Q01110948-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/21/2026Q01094317-I1Open ↗
08/21/2026Q01094317-P1Open ↗
08/21/2026Q01110948-S2Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/21/2026Q01094317-P1Open ↗
08/21/2026Q01094317-I1Open ↗
08/21/2026Q01110948-S2Open ↗
Showing 3 of 5 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
05/14/2012420564516Open ↗
05/05/2010420181323Open ↗
11/27/2007410034948Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
08/05/2015421193880Open ↗
▸BISTECHNICAL REPORT: ENERGY1
05/14/2012420564516Open ↗
▸Approvals, Objections & Sign-offs7
▸BISADMINISTRATIVE OBJECTIONS4
08/05/2015421193880Open ↗
05/14/2012420564516Open ↗
05/05/2010420181323Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
03/30/2012420181323Open ↗
04/03/2009410034948Open ↗
▸BISCERTIFICATE OF OCCUPANCY - LOC: REQUEST1
04/03/2009410034948Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT6
08/05/2015421193880Open ↗
05/14/2012420564516Open ↗
03/30/2012420181323Open ↗
Showing 3 of 6 on file for this type
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
08/05/2015421193880Open ↗
▸Other Documents2
▸DOB NOWManufacturer's Specifications1
08/15/2026Q01406836-I1Open ↗
▸DOB NOWCalculations1
08/15/2026Q01406836-I1Open ↗