← Back
Miscellaneous religious facility
14-47 143 STREET
QUEENS · BIN 4098778
💬 Discuss this project
1967Year Built
4Stories
M9Building Class
R2AZoning
65,500 sfGross Floor Area
2Units
LL97 Covered5 Open Violations 2 unresolved · 3 paperwork only ▸FDNY Report ↗
Miscellaneous religious facility · Owner of record: ROMAN CATHOLIC CHURCH · 111,800 sf lot · 0.59 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingGeneral
Roof1p · 1 filing · 20 docs
Floor 117p · 1 filing · 20 docs
Cellar2p · 1 filing · 17 docs
Basement10p · 1 filing · 20 docs
1 job · most recent 07/20/2022
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/20/2022Signed-offTOMCO MECHANICAL CORPAir Conditioning Systems, Ventilation Systems
Cooling
Trane TPKA0A0121LA00A 1 tons · Split System ×8
TRUYA0121KA70NA 1 tons · Condensing Unit ×8
TPKA0A0241KA70A 2 tons · Split System ×2
TRUYA0241HA70NA 2 tons · Condensing Unit ×2
Mitsubishi Electric TPKA0A0121HA70A 2 tons · Split System ×5
TRUYA0121HA70NA 2 tons · Condensing Unit ×5
Ventilation
Loren Cook 135 ACE 135C OR80 300 CFM · Exhaust Fan ×2
300 ACRUH 300RH11B 150 CFM · Exhaust Fan ×2
300 ACRUX 300RX11B 600 CFM · Exhaust Fan ×2
GC-422 100 CFM · Exhaust Fan ×2
GN-186 75 CFM · Exhaust Fan ×2
Greenheck SP-A290 150 CFM · Exhaust Fan ×3
CUBE-240-HP-50 600 CFM · Exhaust Fan ×1
GB-100HP-4 300 CFM · Exhaust Fan ×1
1 job · most recent 07/20/2022
Water/Sanitary
FiledStatusContractorScope
07/20/2022Signed-offVARSITY PLBG AND HTG INCWater/Sanitary
5 jobs · most recent 06/26/2023
General Wiring
FiledStatusContractorScope
06/26/2023CompleteA.T.J. ELECTRICAL CO.INC.General Wiring
08/25/2022Permit IssuedPJZ MAINTENANCE CORP.General Wiring
06/16/2022CompleteSTANCO SYSTEM ELEC'L CONTGeneral Wiring
02/03/2022Permit IssuedPJZ MAINTENANCE CORP.1 meters, 1 new_meters
08/06/2018Permit IssuedJECO ELEC'L SERVICE CORP.—
1 job · most recent 07/20/2022
Concrete
FiledStatusContractorScope
07/20/2022Signed-offTOMCO MECHANICAL CORPConcrete
Building Lifecycle
All (79)Filed (10)Permit Issued (10)Signed Off (3)Violation (19)Inspection (5)Objection (2)Special Inspection (30)
08/06/2026
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/20/2026
Violation issued (ECB, open)
Construction
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/27/2025
Violation issued (ECB, open)
Construction
09/17/2025
Violation issued (FDNY_ORDER, closed)
04/01/2025
Violation issued (FDNY_ORDER, closed)
03/19/2025
Violation issued (FDNY_ORDER, closed)
01/23/2025
Signed off — Alteration
REPLACEMENT OF TWO BOILERS AND BURNERS
Q00945422-I1
11/08/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
05/08/2024
Signed off — Alteration
Q409_Provide firestopping for penetrations through fire rated walls and floor slabs, access panel to install smoke detector at existing duct, and gypsum board soffit. Clean, patch, repair and paint walls and ceiling affected by scope of work.
Q00826763-I1
05/06/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/23/2024
Permit issued — Boiler Equipment
Q00945422-I1-BE
04/19/2024
Filed — Alteration
REPLACEMENT OF TWO BOILERS AND BURNERS
Q00945422-I1
04/18/2024
Permit issued — Mechanical Systems
Q00826763-I1-GC
04/09/2024
Permit issued — General Construction
Q00826763-I1-MS
03/20/2024
Violation issued (ECB, open)
Construction
01/25/2024
Special inspection requirement — Final
Mohamed Shahid
01/25/2024
Special inspection requirement — Mechanical Systems
Mohamed Shahid
01/25/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mohamed Shahid
01/15/2024
Filed — Alteration
Q409_Provide firestopping for penetrations through fire rated walls and floor slabs, access panel to install smoke detector at existing duct, and gypsum board soffit. Clean, patch, repair and paint walls and ceiling affected by scope of work.
Q00826763-P2
01/12/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
01/12/2024
Special inspection requirement — Final
Mohamed Shahid
01/12/2024
Special inspection requirement — Mechanical Systems
Mohamed Shahid
01/05/2024
Filed — Alteration
Q409_Provide firestopping for penetrations through fire rated walls and floor slabs, access panel to install smoke detector at existing duct, and gypsum board soffit. Clean, patch, repair and paint walls and ceiling affected by scope of work.
Q00826763-P1
12/07/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
12/07/2023
Special inspection requirement — Final
Mohamed Shahid
12/07/2023
Special inspection requirement — Mechanical Systems
Mohamed Shahid
11/13/2023
Signed off — Alteration
FN/PK409Q - FOR TEMPORARY CONSTRUCTION EQUIPMENT(FENCE) SUBMITTING ON BEHALF OF CONTRACTOR, IN CONJUNCTION WITH LLW #/s 127389, 127894 NO CHANGE IN USE, OCCUPANCY OR EGRESS
Q00662263-I1
10/11/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
HOWARD KRIGSMAN
10/11/2023
Special inspection requirement — HVAC-R and service water heating system controls
HOWARD KRIGSMAN
10/11/2023
Special inspection requirement — Maintenance information
HOWARD KRIGSMAN
10/11/2023
Special inspection requirement — HVAC-R and service water heating equipment
HOWARD KRIGSMAN
10/03/2023
Permit issued — Mechanical Systems
Q00826763-I1-MS
02/16/2023
Objection raised — Scope
02/16/2023
Objection resolved — Addressed
02/10/2023
Filed — Alteration
Q409_Provide firestopping for penetrations through fire rated walls and floor slabs, access panel to install smoke detector at existing duct, and gypsum board soffit. Clean, patch, repair and paint walls and ceiling affected by scope of work.
Q00826763-I1
08/03/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/21/2022
Special inspection requirement — Maintenance information
NELSON LOPEZ
07/21/2022
Special inspection requirement — Interior lighting power
NELSON LOPEZ
07/21/2022
Special inspection requirement — Shutoff dampers
NELSON LOPEZ
07/21/2022
Special inspection requirement — Lighting controls
NELSON LOPEZ
07/21/2022
Special inspection requirement — HVAC-R and service water heating system controls
NELSON LOPEZ
07/21/2022
Special inspection requirement — Electrical motors and elevators
NELSON LOPEZ
07/21/2022
Special inspection requirement — Exterior lighting power
NELSON LOPEZ
07/21/2022
Special inspection requirement — Post-installed Anchors
NELSON LOPEZ
07/21/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
NELSON LOPEZ
07/21/2022
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
NELSON LOPEZ
07/21/2022
Special inspection requirement — Mechanical Systems
NELSON LOPEZ
07/21/2022
Special inspection requirement — Fire-Resistance Rated Construction
NELSON LOPEZ
07/21/2022
Special inspection requirement — Final
NELSON LOPEZ
07/21/2022
Special inspection requirement — Energy Code Compliance Inspections
NELSON LOPEZ
07/20/2022
Filed — Alteration
Q409_Proposed work to include renovation of the building from BAS, 1ST FL spaces of the existing building, leased to NYCDOE for a new 3K Center/School. No change in use or occupancy under this application.
Q00583947-P3
07/20/2022
Special inspection requirement — Shutoff dampers
NELSON LOPEZ
07/20/2022
Special inspection requirement — Maintenance information
NELSON LOPEZ
07/20/2022
Special inspection requirement — Interior lighting power
NELSON LOPEZ
06/02/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/26/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/06/2022
Permit issued — Mechanical Systems
Q00583947-I1-MS
03/02/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
Latest 60 of 79 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ROCKLYN ASSET3807/08/2026
ROMAN CATHOLIC CHURCH403/22/2026
DEPARTMENT OF EDUCATION203/22/2026
HOLY TRINITY RC CHURCH203/21/2026
HOLY TRINITY RC SCHOOL203/21/2026
SCHOOL103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RONALD KRIGSMAN P.E.P.C.104/19/2024
STV INCORPORATED801/15/2024
DSENY ENGINEERING SERVICES, PC101/25/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
STV1603/21/2026
DSENY ENGINEERING SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ABC CONSTRUCTION CONT INCGeneral Contractor603/21/2026
A.T.J. ELECTRICAL CO INCGeneral Contractor507/08/2026
TOMCO MECHANICAL CORPGeneral Contractor403/21/2026
VARSITY PLBG AND HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KS ENGINEERS, P.C.7715301/15/2024
UNIVERSAL TESTING AND INS400507/20/2022
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offAPPROVED OIL CO OF BKLYN04/23/2024
DOB NOWMechanical SystemsSigned-offA.T.J. ELECTRICAL CO INC04/18/2024
DOB NOWGeneral ConstructionSigned-offA.T.J. ELECTRICAL CO INC04/09/2024
DOB NOWMechanical SystemsSigned-offA.T.J. ELECTRICAL CO INC10/03/2023
DOB NOWMechanical SystemsSigned-offTOMCO MECHANICAL CORP04/06/2022
DOB NOWConstruction FenceSigned-offABC CONSTRUCTION CONT INC02/02/2022
DOB NOWGeneral ConstructionSigned-offABC CONSTRUCTION CONT INC01/07/2022
DOB NOWPlumbingSigned-offVARSITY PLBG AND HTG INC12/22/2021
DOB NOWMechanical SystemsSigned-offTOMCO MECHANICAL CORP12/22/2021
DOB NOWGeneral ConstructionSigned-offABC CONSTRUCTION CONT INC12/18/2021
BISOTISSUEDNATIONAL ENVIROMENTAL SAFETY08/31/2016
BISPLISSUEDMAR-SAL PLBG & HTG, INC03/18/2016
BISOTISSUEDNATIONAL ENVIROMENTAL SAFETY03/10/2016
BISFBISSUEDRANSHAW PLBG & HTG LLC01/12/2006
BISFSISSUEDRANSHAW PLBG & HTG LLC08/28/2002
BISPLISSUEDANTHONY FRANKINI PLG. & HTNG.01/26/1994
BIS—ISSUEDARN ENVIRONMENTAL CO INC10/29/1990
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
11/08/2024Pass-Final Boiler Equipment InspectionPassView ↗
05/06/2024Pass-Final General Construction Non-Directive 14PassView ↗
04/26/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/02/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/20/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 47
DateRequirementInspectorRole
01/25/2024FinalMohamed Shahidprogress
01/25/2024Mechanical SystemsMohamed Shahidspecial
01/25/2024Fire-Resistant Penetrations and JointsMohamed Shahidspecial
01/12/2024Fire-Resistant Penetrations and Joints—special
01/12/2024FinalMohamed Shahidprogress
01/12/2024Mechanical SystemsMohamed Shahidspecial
12/07/2023Fire-Resistant Penetrations and Joints—special
12/07/2023FinalMohamed Shahidprogress
12/07/2023Mechanical SystemsMohamed Shahidspecial
10/11/2023HVAC-R and service water piping design and insulationHOWARD KRIGSMANenergy_progress
10/11/2023HVAC-R and service water heating system controlsHOWARD KRIGSMANenergy_progress
10/11/2023Maintenance informationHOWARD KRIGSMANenergy_progress
10/11/2023HVAC-R and service water heating equipmentHOWARD KRIGSMANenergy_progress
07/21/2022Maintenance informationNELSON LOPEZenergy_progress
07/21/2022Interior lighting powerNELSON LOPEZenergy_progress
07/21/2022Shutoff dampersNELSON LOPEZenergy_progress
07/21/2022Lighting controlsNELSON LOPEZenergy_progress
07/21/2022HVAC-R and service water heating system controlsNELSON LOPEZenergy_progress
07/21/2022Electrical motors and elevatorsNELSON LOPEZenergy_progress
07/21/2022Exterior lighting powerNELSON LOPEZenergy_progress
07/21/2022Post-installed AnchorsNELSON LOPEZspecial
07/21/2022Fire-Resistant Penetrations and JointsNELSON LOPEZspecial
07/21/2022Subsurface Conditions – Fill Placement & In-Place DensityNELSON LOPEZspecial
07/21/2022Mechanical SystemsNELSON LOPEZspecial
07/21/2022Fire-Resistance Rated ConstructionNELSON LOPEZprogress
Latest 25 of 47.
▾Documents — 125 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/26/2026Q00583947-P2Request digital key ↗
08/26/2026Q00583947-P1Request digital key ↗
08/26/2026Q00583947-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits13
▸BISPLAN / WORK APPROVAL APPLICATION8
04/12/2022402065153Open ↗
01/05/2022402065153Open ↗
12/15/2021402065153Open ↗
Showing 3 of 8 on file for this type
▸BISWORK PERMIT APPLICATION3
05/23/2016440245806Open ↗
03/24/2016440245806Open ↗
03/10/2016440245806Open ↗
▸BISApplication Withdrawal/Address Change Form OP-1131
01/11/2022402065153Open ↗
▸BISPLACE OF ASSEMBLY1
03/08/2018421218408Open ↗
▸Seals & Professional Certifications62
▸DOB NOWProgress Inspector Seal & Signature29
09/23/2026Q00945422-I1Open ↗
09/23/2026Q00945422-I1Open ↗
09/23/2026Q00826763-P2Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/23/2026Q00826763-P2Open ↗
09/01/2026Q00583947-P2Open ↗
08/29/2026Q00583947-P3Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/26/2026Q00583947-P3Open ↗
08/26/2026Q00583947-P2Open ↗
08/26/2026Q00583947-P1Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
03/08/2018421218408Open ↗
03/08/2018421218408Open ↗
05/18/2017440245806Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
09/16/2015440245806Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
02/09/2016440245806Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/16/2015440245806Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
09/16/2015440245806Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING1
09/16/2015440245806Open ↗
▸Environmental & Asbestos4
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
03/10/2016440245806Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
09/16/2015440245806Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026Q00945422-I1Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/26/2026Q00583947-I1Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
12/19/2016440245806Open ↗
02/08/2016440245806Open ↗
12/10/2015421218408Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
09/16/2015440245806Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
09/16/2015440245806Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026Q00945422-I1Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY1
09/16/2015440245806Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
03/08/2018421218408Open ↗
▸Approvals, Objections & Sign-offs18
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter10
08/26/2026Q00583947-P1Open ↗
08/26/2026Q00583947-P3Open ↗
08/26/2026Q00583947-P2Open ↗
Showing 3 of 10 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
03/08/2018421218408Open ↗
03/08/2018421218408Open ↗
03/08/2018421218408Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP Variance (V5) letter3
08/26/2026Q00583947-S1Open ↗
08/26/2026Q00583947-I1Open ↗
08/13/2026Q00826763-I1Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
11/21/2017440245806Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
06/22/2017440245806Open ↗
09/16/2015440245806Open ↗
▸Filing & Intake Forms7
▸BISADDITIONAL INFORMATION5
04/13/2017440245806Open ↗
05/23/2016440245806Open ↗
05/23/2016440245806Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
09/16/2015440245806Open ↗
▸BISBOROUGH INTAKE FORM1
11/21/2017440245806Open ↗