← Back
Elevator apt, fireproof with stores
Primary Care Center
14-56 31 DRIVE · BIN 4005831
💬 Discuss this project
2001Year Built
10Stories
D6Building Class
R7XZoning
61,700 sfGross Floor Area
63Units
LL97 CoveredRent Stabilized0 Open ViolationsFISP: SWARMP
Elevator apt, fireproof with stores · Owner of record: CIAMPA 21 LLC · 10,016 sf lot · 6.16 FAR built · Flood zone X500
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CIAMPA 211503/22/2026
CIAMPA ZI LLC103/22/2026
CIAMPA REALTY1103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ROYAL ENGINEERING, P.C103/08/2019
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
THOMAS FITZPATRICKElectrical203/21/2026
ELPO ELECTRICAL CONTG INCElectrical103/22/2026
FITZPATRICK, THOMASElectrical103/21/2026
HEMANCHAL DEONARINEElectrical103/21/2026
JOE ZAGOElectrical103/21/2026
PHOENIX SUTTON STR INCGeneral Contractor107/08/2026
Building Lifecycle
All (61)Filed (1)Permit Issued (1)Signed Off (1)Facade (FISP) (18)Violation (39)Special Inspection (1)
11/07/2025
Violation issued (HPD, closed)
C
10/22/2025
Violation issued (HPD, closed)
C
07/04/2024
Violation issued (HPD, closed)
B
07/04/2024
Violation issued (HPD, closed)
B
03/07/2024
Cycle 9 facade report signed — SWARMP
01/11/2024
Cycle 9 facade report submitted
12/05/2023
Cycle 9 facade inspection completed
07/06/2023
Violation issued (HPD, closed)
A
07/06/2023
Violation issued (HPD, closed)
B
07/06/2023
Violation issued (HPD, closed)
B
07/06/2023
Violation issued (HPD, closed)
B
07/06/2023
Violation issued (HPD, closed)
A
07/06/2023
Violation issued (HPD, closed)
A
07/06/2023
Violation issued (HPD, closed)
A
07/06/2023
Violation issued (HPD, closed)
A
07/06/2023
Violation issued (HPD, closed)
A
07/06/2023
Violation issued (HPD, closed)
B
07/06/2023
Violation issued (HPD, closed)
B
07/06/2023
Violation issued (HPD, closed)
A
04/24/2020
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
Q00139518-I1
01/31/2020
Cycle 8 facade report submitted
01/30/2020
Cycle 8 facade inspection completed
01/28/2020
Cycle 8 facade report signed — SAFE
05/16/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/11/2019
Permit issued — Sidewalk Shed
Q00139518-I1-SH
03/11/2019
Cycle 8 facade report submitted
03/11/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/09/2019
Cycle 8 facade report signed — UNSAFE
03/08/2019
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
Q00139518-I1
03/08/2019
Cycle 8 facade inspection completed
03/08/2019
Special inspection requirement — Final
Victor Suben
02/22/2019
Violation issued (ECB, closed)
Construction
10/24/2018
Cycle 8 facade report submitted
10/21/2018
Cycle 8 facade report signed — SWARMP
09/28/2018
Cycle 8 facade inspection completed
01/26/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/03/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/31/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/10/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/20/2013
Cycle 7 facade report submitted
02/15/2013
Cycle 7 facade report signed — SWARMP
02/12/2013
Cycle 7 facade inspection completed
01/10/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/29/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/03/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/08/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/08/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/04/2010
Violation issued (HPD, closed)
B
05/04/2010
Violation issued (HPD, closed)
B
05/04/2010
Violation issued (HPD, closed)
B
03/25/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/28/2008
Cycle 6 facade report submitted
02/21/2008
Cycle 6 facade report signed — SAFE
01/31/2008
Cycle 6 facade inspection completed
05/09/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/28/2006
Violation issued (ECB, closed)
Elevators
07/12/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/05/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/17/2002
Violation issued (ECB, closed)
Construction
12/06/2002
Violation issued (HPD, closed)
C
Latest 60 of 61 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC03/11/2019
BISOTISSUEDAPA GROUP INC06/21/2019
BISOTISSUEDNEW YORK SIGN CITY INC.06/12/2003
BISOTISSUEDCIAMPA 21 LLC01/21/2003
BISEQISSUEDCIAMPA 21 LLC12/12/2002
BISMHISSUEDCIAMPA 21 LLC12/12/2002
BISPLISSUEDMEDCO PLUMBING INC12/02/2002
BISOTISSUEDCIAMPA NORTH LLC11/21/2002
BISEQISSUEDCIAMPA NORTH LLC11/21/2002
BISOTISSUEDCIAMPA 21 LLC08/26/2002
BISPLISSUEDMEDCO PLUMBING INC08/23/2002
BISBLISSUEDMEDCO PLUMBING INC03/08/2002
BISPLISSUEDMEDCO PLUMBING INC03/08/2002
BISEQISSUEDCIAMPA 21 LLC12/14/2001
BISPLISSUEDMEDCO PLUMBING INC12/06/2001
BISSPISSUEDMEDCO PLUMBING INC.12/06/2001
BISEQISSUEDCIAMPA 21 LLC11/05/2001
BIS—ISSUEDCIAMPA 21 LLC11/02/2001
BISPLISSUEDMEDCO PLUMBING INC07/10/2001
BIS—ISSUEDCIAMPA 21 LLC07/05/2001
BISEQISSUEDCIAMPA 21 LLC04/16/2001
BIS—ISSUEDCIAMPA 21 LLC04/16/2001
BIS—ISSUEDSANO CONSTRUCTION CORP04/10/2001
BIS—ISSUEDSANO CONSTRUCTION CORP04/10/2001
BISEQISSUEDSANO CONSTRUCTION CORP04/10/2001
BISEQISSUEDSANO CONSTRUCTION CORP04/10/2001
BIS—ISSUEDSANO CONSTRUCTION CORP04/10/2001
BIS—ISSUEDSANO CONSTRUCTION CORP04/10/2001
2 projects · most recent 02/28/2019
General Wiring
FiledStatusContractorScope
02/28/2019Permit IssuedELPO ELECTRICAL CONTG INC—
04/25/2018CancelledROMA ELECTRIC CORPGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
03/08/2019FinalVictor Subenprogress
▾Documents — 43 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/28/2026Q00139518-I1Request digital key ↗
▸Applications & Permits8
▸BISPLAN / WORK APPROVAL APPLICATION7
05/14/2019420183134Open ↗
04/18/2019421950213Open ↗
05/05/2010420183134Open ↗
Showing 3 of 7 on file for this type
▸BISWORK PERMIT APPLICATION1
07/17/2019421950213Open ↗
▸Seals & Professional Certifications10
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
02/19/2020421950213Open ↗
02/06/2020421950213Open ↗
06/19/2019421950213Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
04/18/2019421950213Open ↗
05/05/2010420183134Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
05/05/2010420183134Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/28/2026Q00139518-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/02/2026Q00139518-I1Open ↗
▸Trade Schedules & Equipment1
▸BISFA - FDNY APPROVAL : FD-FAA1
10/08/2010410116477Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
04/18/2019421950213Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
09/25/2008410116477Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
02/06/2020421950213Open ↗
04/18/2019421950213Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
02/06/2020421950213Open ↗
▸Approvals, Objections & Sign-offs9
▸BISLETTERS - SUPPORTING DOCUMENTATION3
02/19/2020421950213Open ↗
02/06/2020421950213Open ↗
10/08/2010410116477Open ↗
▸BISADMINISTRATIVE OBJECTIONS3
05/05/2010420183134Open ↗
09/15/2008410116477Open ↗
07/01/2008410116477Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
02/19/2020421950213Open ↗
02/19/2020421950213Open ↗
10/08/2010410116477Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
02/06/2020421950213Open ↗
04/18/2019421950213Open ↗
10/08/2010410116477Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms3
▸BISEFILING COVER SHEET2
04/18/2019421950213Open ↗
05/05/2010420183134Open ↗
▸BISBOROUGH INTAKE FORM1
05/14/2019420183134Open ↗
▸Other Documents1
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
08/28/2026Q00139518-I1Open ↗