ECB04/06/2026FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN VIOLATION#021326CE30201PT-CONTROL #376531 ISSUED ON 02/13/26, WHICH DOCUMENTED A FAILURE TO COMPLY WITH PREVIOUS VIOLATION #012626CE30201PT-CONTROL$12K due
DOB02/13/2026FAILURE TO COMPLY W/ COMMISSIONERS'S ORDER CONTAINED IN DOB VIOLATION NO.012626CE30201PT-CONTROL NO 376524 ISSUED ON 1/26/26. REMEDY: COMPLY WITH CODE. COMPLY WITH ALL REQUIREMENT OF THE AFOREMENTIONED COMMISSONER'S ORDER. SUBMIT REQUIRED DOCMENTS FOR TECHNICAL AUDIT BY 03/13/2026
DOB01/26/2026INSPECTN REVEALD DEMOWRK BEING CARRID OUT CONTRARY TO APPROVD PLAN.INT ERIOR FRAME RELIEVIN WALLS HAVE BEEN FULLY REMOVD @ 2ND ATTIC FLS,CONT RARY TO APPROVD PLANS SHOWIN ONLY PRTIAL REMOVAL.REMDY:COMPLY W/CODE SUBMIT DOC PREVSLY REQUESTD ON 11/7/25 FOR DOB AUDIT. RETAINRDP TO PR -OVDE ENGR ASSES REPRT FOR BLDG/SITE. SUBIT ALL REQ'D DOCS BY 1/30/26
DOB07/19/2011UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP ORDER #101409C0201 ZC IN THAT AT TIME OF I NSP. 2 WORKERS HAD EXCAVATED THE FRONT YRD. AN D STREET INSTALLING A NEW COOPER WATER MAIN PIPE FROM STREET INTO BASE MENT. STOP ALL WORK AT SITE,
ECB06/14/202128-116.4 FAILURE TO COMPLY W/DOB REQUIREMENT FOR PERMIT SIGNOFF.RESPONDENT OBTAINED PERMIT320187891 WHICH EXPIRED8/2/18.PERMIT HASNT BEEN SIGNED OFF W/I 1YR FOLLOWING ITS EXPIRATION PER 28-116.4 OF ADMINISTRATINothing owed — awaiting certificate of correction
ECB02/02/2018BC 3301.3 & 1RCNY 3301.02 (D) FAILURE TO DESIGNATE &/OR HAVE CONST SUPERINTENDENT PRESENT @SITE WHEN REQUIRED.@THE TIME OF INSP IT WAS OBSERVED THAT THE DOB APPROVED PLANS CALLED FOR UNDERPINNING THE TR1'S CALLNothing owed — awaiting certificate of correction
ECB10/25/2013FAILURE TO MAINTAIN BLDG IN A CODE-COMPLIANT MANNER. METAL CORNICE AT RIGHT SIDE IS MISSING APPROX 2 SQ FT OF METAL, REMEDY: REPAIR/REPLACE.Nothing owed — awaiting certificate of correction