14 DOLE STREET
STATEN ISLAND · Annadale-Huguenot-Prince's Bay-Woodrow · BIN 5175685
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Floor 29p · 1 filing · 20 docs
Floor 18p · 2 filings · 20 docs
Basement9p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BELAIR RIDGE DEVELOPMENT CORP.2507/08/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ROGERS CALVANICO GROUP203/21/2026
SUNRUN103/21/2026
A TECH ENGINEERING NYC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BEYER CONSTRUCTION CORPGeneral Contractor507/08/2026
DUO PLUMBING & HTG CORP.Plumbing407/08/2026
SUNRUN INSTALLATION SVCGeneral Contractor107/08/2026
DESIGN PLBG & HTG SVC INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272104/30/2025
A TECH ENGINEERING NYC, P6738305/20/2024
Building Lifecycle
All (38)Filed (6)Permit Issued (9)Signed Off (4)Inspection (12)Objection (2)Special Inspection (5)
01/09/2026
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01217850-I1
05/02/2025
Permit issued — Solar
S01217850-I1-SL
04/30/2025
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01217850-I1
04/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
04/29/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
04/29/2025
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
04/29/2025
Special inspection requirement — Final
Walid Abdulla
04/29/2025
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
08/23/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
08/23/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/13/2024
Permit issued — Mechanical Systems
S08034039-I1-GC-CX
05/31/2024
Signed off — Alteration
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM WITH VALVES AND METER FOR SAME.
S00834744-I1
05/30/2024
Signed off — New Building
10' TOTAL CURB CUT
S08034039-S1
05/22/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/20/2024
Filed — New Building
10' TOTAL CURB CUT
S08034039-P1
05/14/2024
Signed off — New Building
10' TOTAL CURB CUT
S08034039-S2
05/13/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/13/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
04/25/2024
Permit issued — Curb Cut
S08034039-S2-CC
03/29/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/22/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/18/2024
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
01/05/2024
Filed — New Building
10' TOTAL CURB CUT
S08034039-S2
10/27/2023
Permit issued — Plumbing
S00834744-I1-PL
10/27/2023
Permit issued — Plumbing
S08034039-S1-PL
10/05/2023
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
07/28/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/02/2023
Permit issued — Plumbing
S00834744-I1-PL
04/06/2023
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
03/24/2023
Filed — Alteration
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM WITH VALVES AND METER FOR SAME.
S00834744-I1
03/22/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
03/09/2023
Permit issued — Plumbing
S76651562-S1-PL
02/24/2023
Permit issued — Plumbing
S08034039-S1-PL
01/13/2023
Permit issued — Structural
S08034039-I1-GC-CX
12/20/2022
Filed — New Building
10' TOTAL CURB CUT
S08034039-S1
12/05/2022
Objection raised — Scope
12/05/2022
Objection resolved — Addressed
11/04/2022
Filed — New Building
10' TOTAL CURB CUT
S08034039-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC05/02/2025
DOB NOWMechanical SystemsPermit IssuedBEYER CONSTRUCTION06/13/2024
DOB NOWCurb CutSigned-offBEYER CONSTRUCTION04/25/2024
DOB NOWPlumbingSigned-offDUO PLUMBING & HTG CORP.10/27/2023
DOB NOWPlumbingSigned-offDUO PLUMBING & HTG CORP.10/27/2023
DOB NOWPlumbingSigned-offDUO PLUMBING & HTG CORP.06/02/2023
DOB NOWPlumbingSigned-offDESIGN PLBG & HTG SVC IN03/09/2023
DOB NOWPlumbingSigned-offDUO PLUMBING & HTG CORP.02/24/2023
DOB NOWStructuralPermit IssuedBEYER CONSTRUCTION01/13/2023
1 project · most recent 05/20/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
05/20/2024Signed-offDUO PLUMBING & HTG CORP.Gas, Storm, Water/Sanitary
2 projects · most recent 04/30/2025
General Wiring
FiledStatusContractorScope
04/30/2025CompleteSUNRUN SOLAR ELECTL CORP—
04/18/2024CompleteLASER LITE ELECT'L INC.General Wiring
1 project · most recent 05/20/2024
Wood
FiledStatusContractorScope
05/20/2024Permit IssuedBEYER CONSTRUCTION CORPWood
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
08/23/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
08/23/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/22/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/13/2024Pass-Final CND-Occupancy InspectionPassView ↗
05/13/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
03/29/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/22/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/18/2024Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
10/05/2023Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
07/28/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/06/2023Pass-Final PL - UndergroundPassView ↗
03/22/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
04/29/2025Fire-Resistant Penetrations and JointsWalid Abdullaspecial
04/29/2025Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
04/29/2025Energy Code Compliance InspectionsWalid Abdullaprogress
04/29/2025FinalWalid Abdullaprogress
04/29/2025Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 32 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/23/2026S00834744-I1Request digital key ↗
08/21/2026S08034039-S1Request digital key ↗
08/21/2026S08034039-S2Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026S08034039-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S08034039-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026S08034039-I1Open ↗
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/23/2026S00834744-I1Open ↗
08/21/2026S08034039-S1Open ↗
08/19/2026S01217850-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/26/2026S01217850-I1Open ↗
08/26/2026S01217850-I1Open ↗
08/26/2026S01217850-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/26/2026S01217850-I1Open ↗
08/26/2026S01217850-I1Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026S08034039-I1Open ↗
▸Safety & Tenant Protection4
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S08034039-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026S08034039-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S08034039-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S08034039-I1Open ↗
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S08034039-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026S08034039-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01217850-I1Open ↗
▸Other Documents4
▸DOB NOWFinal Survey1
08/13/2026S08034039-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026S08034039-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026S08034039-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026S08034039-I1Open ↗