← Back
BuildNYC
Fire Department
14 EAST 18TH STREET
MANHATTAN · BIN 1016141
💬 Discuss this project
1895Year Built
3Stories
Y1Building Class
M1-5MZoning
5,623 sfGross Floor Area
1Units
2 Active Violations 0 unresolved · 2 paperwork only 1 likely answered ▸
Fire Department · Owner of record: Fire Department of New York · 1,963 sf lot · 2.86 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingCivil
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1Makeup Air Unit and ductwork installation3p · 2 filings · 13 docs
CellarEngine Company 149p · 2 filings · 18 docs
Site & exteriorDiesel motor fuel AST and dispenser installation1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Fire Department of the City of New York1407/08/2026
NYC Department of Design and Construction1003/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Cameron Engineering601/08/2026
Konoski Engineering109/08/2025
Liro Engineers104/09/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
P.wolfe Consultants203/21/2026
Premier Expediting Services103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Franco Belli PLMG & Heating SonPlumbing307/08/2026
Glass Armor of New York Ispecialty_contractor203/21/2026
Samiro ServicesGeneral Contractor204/09/2026
Eldor ElectricElectrical103/21/2026
LCJ Electrical ContractorsElectrical103/21/2026
Villafane JohnElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Konoski Engineering9111109/08/2025
EC Special Inspections8355106/08/2023
Tectonic Engineering Cons106104/09/2021
Building Lifecycle
All (64)Filed (8)Permit Issued (6)Signed Off (2)Violation (28)Inspection (4)Objection (8)Special Inspection (8)
09/01/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/27/2026
Signed off — Alteration
Filing herewith for installation of Makeup Air Unit and related ductwork
M01242942-I1
02/11/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
02/03/2026
Permit issued — Plumbing
M00870266-S1-PL
01/28/2026
Permit issued — Mechanical Systems
M01242942-I1-MS
01/08/2026
Filed — Alteration
Addition of fire-rated walls to bring boiler room up to code.
M00870266-P3
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/14/2025
Permit issued — Mechanical Systems
M01242942-I1-MS
10/07/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/19/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
09/08/2025
Filed — Alteration
Filing herewith for installation of Makeup Air Unit and related ductwork
M01242942-I1
06/17/2025
Special inspection requirement — Ventilation and air distribution system
christopher konoski
06/17/2025
Special inspection requirement — Final
christopher konoski
06/17/2025
Special inspection requirement — Maintenance information
christopher konoski
06/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
christopher konoski
06/17/2025
Special inspection requirement — Mechanical Systems
christopher konoski
06/17/2025
Special inspection requirement — Energy Code Compliance Inspections
christopher konoski
01/13/2025
Permit issued — Boiler Equipment
M00870266-I1-BE
01/08/2025
Permit issued — Plumbing
M00870266-S1-PL
02/27/2024
Signed off — Alteration
mpty,purge,clean, remove & dispose of one (1) 550-Gallon Diesel Motor Fuel AST, (1) fuel dispenser, Conc Is & veederroot. Install 'IN -KIND' one (1) new 550- Gallon field Fabricated Single-Wall Steel Diesel Motor Fuel AST, (1) FuelDispenser per plans.
M00499600-I1
10/11/2023
Filed — Alteration
Addition of fire-rated walls to bring boiler room up to code.
M00870266-P2
10/10/2023
Filed — Alteration
Addition of fire-rated walls to bring boiler room up to code.
M00870266-P1
08/18/2023
Permit issued — General Construction
M00499600-I1-GC
06/09/2023
Filed — Alteration
Addition of fire-rated walls to bring boiler room up to code.
M00870266-S2
06/09/2023
Filed — Alteration
Addition of fire-rated walls to bring boiler room up to code.
M00870266-S1
06/08/2023
Filed — Alteration
Addition of fire-rated walls to bring boiler room up to code.
M00870266-I1
05/04/2023
Special inspection requirement — Heating Systems
ABDALLAH ELCHERBINI
05/04/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
ABDALLAH ELCHERBINI
06/15/2021
Objection raised — Other
06/15/2021
Objection resolved — Addressed
04/15/2021
Objection raised — Other
04/15/2021
Objection resolved — Addressed
04/15/2021
Objection raised — Other
04/15/2021
Objection resolved — Addressed
04/15/2021
Objection raised — Other
04/15/2021
Objection resolved — Addressed
04/09/2021
Filed — Alteration
mpty,purge,clean, remove & dispose of one (1) 550-Gallon Diesel Motor Fuel AST, (1) fuel dispenser, Conc Is & veederroot. Install 'IN -KIND' one (1) new 550- Gallon field Fabricated Single-Wall Steel Diesel Motor Fuel AST, (1) FuelDispenser per plans.
M00499600-I1
05/22/2018
Violation issued (ECB, open)
Construction
05/22/2018
Violation issued (ECB, open)
Boilers
04/02/2007
Violation issued (DOB, closed)
VW*-VIOLATION - WORK W/O PERMIT DISMISSED
04/02/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/01/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/08/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/19/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/21/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/09/2003
Violation issued (DOB, closed)
VW*-VIOLATION - WORK W/O PERMIT DISMISSED
03/21/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/29/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/19/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/27/2001
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/04/2001
Violation issued (ECB, closed)
Elevators
03/08/2001
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/27/2001
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/10/2000
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/16/1999
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/20/1999
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/06/1998
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/13/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/13/1997
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
03/08/1996
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 64 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedFranco Belli PLMG & Heating Son02/03/2026
DOB NOWMechanical SystemsSigned-offSamiro Services01/28/2026
DOB NOWMechanical SystemsSigned-offSamiro Services10/14/2025
DOB NOWBoiler EquipmentSigned-offFranco Belli PLMG & Heating Son01/13/2025
DOB NOWPlumbingPermit IssuedFranco Belli PLMG & Heating Son01/08/2025
DOB NOWGeneral ConstructionSigned-offGlass Armor of New York I08/18/2023
BISPLISSUEDPacific Plumbing & Heating06/23/2009
BISMHISSUEDR & L Heating and Air Conditiond03/31/2008
BISPLISSUEDPacific Plumbing & Heating03/27/2008
BISOTISSUEDZHL Group03/11/2008
BISFPISSUEDIdeal Fire Systems12/19/2002
BISPLISSUEDS & L Plumbing10/02/2000
1 project · most recent 09/08/2025
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/08/2025Signed-offSamiro ServicesVentilation Systems
Ventilation
Captiveaire SIF15DD-HE 2,295 CFM · Makeup Air ×1
1 project · most recent 01/08/2026
Gas
FiledStatusContractorScope
01/08/2026Permit IssuedFranco Belli PLMG & Heating SonGas
1 project · most recent 01/08/2024
General Wiring
FiledStatusContractorScope
01/08/2024Permit IssuedLCJ Electrical ContractorsGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
09/01/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/11/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/07/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/19/2025Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
06/17/2025Ventilation and air distribution systemchristopher konoskienergy_progress
06/17/2025Finalchristopher konoskiprogress
06/17/2025Maintenance informationchristopher konoskienergy_progress
06/17/2025Fire-Resistant Penetrations and Jointschristopher konoskispecial
06/17/2025Mechanical Systemschristopher konoskispecial
06/17/2025Energy Code Compliance Inspectionschristopher konoskiprogress
05/04/2023Heating SystemsABDALLAH ELCHERBINIspecial
05/04/2023Fire-Resistant Penetrations and JointsABDALLAH ELCHERBINIspecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Engine Company 14Government / CivicCellar
Project M00870266 Alteration · Permit Entire · 06/08/2023
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 40 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/29/2026M00870266-S1Request digital key ↗
08/29/2026M00870266-P3Request digital key ↗
08/29/2026M00870266-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits2
▸DOB NOWLPC Approval/Permit2
08/15/2026M00499600-I1Open ↗
08/13/2026M01242942-I1Open ↗
▸Seals & Professional Certifications12
▸DOB NOWDPL-1: Design Professional Seal & Signature8
09/03/2026M00499600-I1Open ↗
08/13/2026M00870266-P1Open ↗
08/13/2026M00870266-P3Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/23/2026M01242942-I1Open ↗
09/23/2026M00870266-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/23/2026M01242942-I1Open ↗
09/23/2026M01242942-I1Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/15/2026M00499600-I1Open ↗
08/13/2026M00870266-P2Open ↗
08/13/2026M01242942-I1Open ↗
Showing 3 of 8 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/15/2026M00499600-I1Open ↗
▸Approvals, Objections & Sign-offs9
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter8
08/15/2026M00499600-I1Open ↗
08/13/2026M00870266-P2Open ↗
08/13/2026M00870266-S1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)1
08/15/2026M00499600-I1Open ↗