← Back
Two family frame
14 GOODWIN PLACE
BROOKLYN · BIN 3075269
💬 Discuss this project
1901Year Built
3Stories
B2Building Class
C4-3Zoning
2,040 sfGross Floor Area
2Units
1 Open Violation ▸FDNY Report ↗
Two family frame · 2,199 sf lot · 0.93 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
URENA CONSTRUCTION & DESIGN1503/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOSE A. SANTOS P.E.P.C104/17/2025
SOTIR ASSOCIATES311/15/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
URENA CONST & DESIGN INCGeneral Contractor603/21/2026
INFINITI ESC PLUMBING CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JOSE A SANTOS PE, PC3292104/17/2025
ENGINEERING CONSULTING SE2050211/15/2024
Building Lifecycle
All (45)Filed (4)Permit Issued (3)Signed Off (3)Violation (6)Inspection (5)Objection (4)Special Inspection (20)
04/24/2025
Signed off — Alteration
FILING STRUCTURAL WORKTYPE TO ADDRESS VACATE ORDER DUE TO STRUCTURAL STABILITY ISSUES.
B01198162-I1
04/22/2025
Permit issued — Structural
B01198162-I1-ST
04/17/2025
Filed — Alteration
FILING STRUCTURAL WORKTYPE TO ADDRESS VACATE ORDER DUE TO STRUCTURAL STABILITY ISSUES.
B01198162-I1
04/07/2025
Special inspection requirement — Structural Steel - Details
Jose Santos
04/07/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Jose Santos
03/24/2025
Signed off — Alteration
REPLACE & INSTALL NEW PLUMBING FIXTURES AS PER PLANS. IN CONJUNCTION WITH RENOVATIONS FILED UNDER GC #B01010986-I1.
B01010986-S1
03/20/2025
Special inspection requirement — Final
Rilder Mejia
03/12/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/22/2025
Signed off — Alteration
REPLACE & INSTALL NEW PLUMBING FIXTURES AS PER PLANS. IN CONJUNCTION WITH RENOVATIONS FILED UNDER GC #B01010986-I1.
B01010986-I1
01/15/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
01/10/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/20/2024
Special inspection requirement — Energy Code Compliance Inspections
PAUL MARINO
12/20/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL MARINO
12/20/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
PAUL MARINO
12/20/2024
Special inspection requirement — Fire-Resistance Rated Construction
PAUL MARINO
12/20/2024
Special inspection requirement — Lighting in dwelling units
PAUL MARINO
12/20/2024
Special inspection requirement — Fenestration air leakage
PAUL MARINO
12/20/2024
Special inspection requirement — Fenestration areas
PAUL MARINO
12/20/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
PAUL MARINO
12/05/2024
Objection raised — Scope
12/05/2024
Objection resolved — Addressed
11/21/2024
Objection raised — Cost
11/21/2024
Objection resolved — Addressed
11/15/2024
Filed — Alteration
REPLACE & INSTALL NEW PLUMBING FIXTURES AS PER PLANS. IN CONJUNCTION WITH RENOVATIONS FILED UNDER GC #B01010986-I1.
B01010986-P1
11/06/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL MARINO
11/06/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
PAUL MARINO
11/06/2024
Special inspection requirement — Fenestration areas
PAUL MARINO
11/06/2024
Special inspection requirement — Fenestration air leakage
PAUL MARINO
11/06/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
PAUL MARINO
11/06/2024
Special inspection requirement — Lighting in dwelling units
PAUL MARINO
11/06/2024
Special inspection requirement — Fire-Resistance Rated Construction
PAUL MARINO
11/06/2024
Special inspection requirement — Energy Code Compliance Inspections
PAUL MARINO
06/06/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/06/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/29/2024
Permit issued — Plumbing
B01010986-S1-PL
03/26/2024
Permit issued — General Construction
B01010986-I1-GC
03/22/2024
Filed — Alteration
REPLACE & INSTALL NEW PLUMBING FIXTURES AS PER PLANS. IN CONJUNCTION WITH RENOVATIONS FILED UNDER GC #B01010986-I1.
B01010986-S1
03/18/2024
Special inspection requirement — Energy Code Compliance Inspections
PAUL MARINO
02/27/2024
Filed — Alteration
REPLACE & INSTALL NEW PLUMBING FIXTURES AS PER PLANS. IN CONJUNCTION WITH RENOVATIONS FILED UNDER GC #B01010986-I1.
B01010986-I1
02/20/2024
Violation issued (ECB, closed)
Construction
04/15/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/14/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/14/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/14/2023
Violation issued (FDNY_NOV, closed)
05/14/2004
Violation issued (HPD, open)
A
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offURENA CONST & DESIGN INC04/22/2025
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR03/29/2024
DOB NOWGeneral ConstructionSigned-offURENA CONST & DESIGN INC03/26/2024
1 project · most recent 09/04/2024
General Wiring
FiledStatusContractorScope
09/04/2024CompleteTEAM H ELECTRIC LLCGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
03/12/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/15/2025Pass-Final General Construction Non-Directive 14PassView ↗
01/10/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/06/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/06/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
04/07/2025Structural Steel - DetailsJose Santosspecial
04/07/2025Structural Stability – Alterations of existing buildingsJose Santosspecial
03/20/2025FinalRilder Mejiaprogress
12/20/2024Energy Code Compliance InspectionsPAUL MARINOprogress
12/20/2024Fire-Resistant Penetrations and JointsPAUL MARINOspecial
12/20/2024Structural Stability – Alterations of existing buildingsPAUL MARINOspecial
12/20/2024Fire-Resistance Rated ConstructionPAUL MARINOprogress
12/20/2024Lighting in dwelling unitsPAUL MARINOenergy_progress
12/20/2024Fenestration air leakagePAUL MARINOenergy_progress
12/20/2024Fenestration areasPAUL MARINOenergy_progress
12/20/2024Fenestration and door U-factor and product ratingsPAUL MARINOenergy_progress
11/06/2024Fire-Resistant Penetrations and JointsPAUL MARINOspecial
11/06/2024Structural Stability – Alterations of existing buildingsPAUL MARINOspecial
11/06/2024Fenestration areasPAUL MARINOenergy_progress
11/06/2024Fenestration air leakagePAUL MARINOenergy_progress
11/06/2024Fenestration and door U-factor and product ratingsPAUL MARINOenergy_progress
11/06/2024Lighting in dwelling unitsPAUL MARINOenergy_progress
11/06/2024Fire-Resistance Rated ConstructionPAUL MARINOprogress
11/06/2024Energy Code Compliance InspectionsPAUL MARINOprogress
03/18/2024Energy Code Compliance InspectionsPAUL MARINOprogress
▾Documents — 21 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/25/2026B01010986-I1Request digital key ↗
08/25/2026B01010986-S1Request digital key ↗
08/21/2026B01198162-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications13
▸DOB NOWProgress Inspector Seal & Signature6
08/31/2026B01198162-I1Open ↗
08/30/2026B01010986-P1Open ↗
08/30/2026B01010986-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/25/2026B01010986-S1Open ↗
08/25/2026B01010986-I1Open ↗
08/25/2026B01010986-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/31/2026B01198162-I1Open ↗
08/30/2026B01010986-P1Open ↗
08/25/2026B01010986-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/25/2026B01010986-S1Open ↗
08/25/2026B01010986-I1Open ↗
08/15/2026B01010986-P1Open ↗
Showing 3 of 4 on file for this type